OBJECTIVE

To implement my knowledge successfully in the Industry for the betterment of the organization. I am working for, by sheer hard-work and determination with a positive attitude to undertake most challenging jobs to serve the company.

CAREER SUMMARY

Piping In charge having total 17 years of experience in Construction Activities of major projects like Refineries, Petrochemicals, Gas Plant, Hydro-Electric Power Plant, Oil & Gas Pipeline/Flow lines, Gas Gathering station with exposure of Piping Planning, Fabrication, Erection, Pre-commissioning & Commissioning.

More Over have hands on experience in Project Execution for Shutdown & Tie-In Activities, Site & Shop Construction Activities, and Hydro Testing & Pre Commissioning activities etc.

Responsible for review of contract documents for the scope of work, Co-ordinations with Contractors, preparation of detailed schedules for the work execution, Controlling erection activities, ensuring safety of man and material and ensuring progress to meet the project according to schedule.

Associated with Project and Construction HSE Plan.

Management and co-ordination of all project specifications, drawings, and associated technical data, gaining the necessary approvals and ensuring the distribution and availability of the data where its need in support of project Quality is required.

Responsible for effective organization deployment and control of the site labour/supervision.

Responsible to ensure that the standard of the installed works is in accordance with the technical and quality specification of the contract and quality of workmanship is maintained to the highest standards.

Ensure that contract drawings are constantly marked up and produced as per contract specifications.

Monitor the cost and timescales, liaising with the main contractor and gaining approvals where necessary to re-allocate or provide additional resource.

Prepare and maintain accurate registers for material and drawing schedules.

Provide as requested by the project Quantity Surveyor with timely and accurate reports in terms of work carried out and all associated costs and finances.

Responsible for direct liaison with the client or client representative at handover ensuring the availability and suitability of as fitted drawings and associated operation and maintenance manuals.

Report a process any identified deficiencies or concerns during any phase of the project in accordance with company Quality Assurance procedures requirements.

Monitors the performance of engineering contractors & provide necessary design inputs and follows up during the execution of the basic and detailed engineering.

Provides technical assistance, coordination and liaise with other discipline engineers within the Company and other business units to acquire technical and general requirements.

Provides support to Project Managers and Engineers within the Infrastructure Projects Engineering Team.

Interface with Project Managers and Engineers in Company's Technical Departments, Business Units.

Participates in site surveys of Company facilities and to establish and identify the actual requirements.

Interfaces regularly with Contractor's Engineering and Project Management Team whenever required.

Prepares scope of work for external consultants and EPC contractors for the execution of jobs.

To ensure execution adherence to the Contractor Inspection and Testing Plan, and approved for construction drawings and applicable specifications.

TIE IN AND SHUTDOWN ACTIVITES

Coordination between EPC Contractors with the Client.

Tie-In Coordination with the Client.

Participate in Tie-In meetings with Client/Contractor.

Site Survey of Tie-In Location for need of Shut down Requirements.

Maintain the established project schedule by coordinating with Client/Contractor.

Making Of Tie-In Packages for Submission to Client/Contractor.

Identification marking of Positive Isolations Limits with Latest revision Of P&Id’s Prepare Documents for Tie-In like Method of Statement, Job Safety Analysis etc...

Coordinating and Executing Manpower for spool making In Isometrics for Tie-In.

Coordinating & Arranging Materials which are required for Tie-In.

Coordinating & Executing Hydro testing of Pre Fabricated Spools required for Tie-In.

Prepare work package for submission & approval, Conduct meeting regarding Shutdown, Finalising tagging & inspection of Tie-in blinding & de blinding, Execute Scaffolding & Review the material status for Shutdown/Tie-in.

Inspection the Purging & Cleaning activity of Live Line, Execute drilling operation for Gas test before start Cold Cutting of Live Line.

Execute the fit-up & welding as per standard Tie-in Procedure with all NDT clearance, Blasting & Painting activities up to Final Inspection & Handover to Client at Shutdown/Tie-in.

Prepare the required Man-hour estimate for Project Scope.

Overall Supervision and Surveillance of job against the Milestone Packages.

Close Coordination to the Client/Contractor during Construction.

Coordinating and Proper Instruction giving to Hydro Testing Team against the Milestone Packages.

Coordination & Close supervision with construction team for the job completion of Milestone Packages with related all activities up to reinstatement.

CONSTRUCTION EXPOSURE WITH MAJOR OIL & GAS COMPANIES: -

Having 13 years of Gulf Experience, worked at UAE (Abu Dhabi) from 2009 to 2016, Kuwait from 2016 to August 2020 & Iraq 2022. Working for Major Oil & Gas industries like KNPC,ADNOC,AL HOSN GAS & LUKEOIL

Having 1 years in Central Asia Experience, worked at Uzbekistan from 2020 to 2021, Working with a Sasol Synfuels International (SSI) and Uzbekneftegaz (UNG)

Having 2 years in South Asia Experience, worked at Malaysia from 2006 to 2008. Working for Major Oil & Gas industries like PETRONAS

EDUCATIONAL QUALIFICATION

i.Degree in Mechanical Engg from Biju Patnaik University of Technology, Bhubaneswar, India

ii.Diploma in Mechanical Engineering from Utkalmani Gopabandhu Institute Of Engineering, Rourkela, India

SOFTWARE EXPOSURE

●Microsoft Office Package (Ms Word, Excel, Power Point), Primavera P6 & P3

● Internet Explorer.

CAD TOOLS

AUTO CAD

WORK EXPERIENCE: -

1: PRODUCED WATER TREATMENT & WATER INJECTION FACILITIES EXPANSION PHASE 1, WEST QURNA-2 (PHASE 2) (IRAQ)(ONSHORE PROJECT)

Project EPC Value: USD 283 Million

Scope of Work: Detail Design, Engineering, Procurement & Construction and Commissioning.

Project Overview

Lukoil Mid-East Limited (COMPANY) planned to develop its upstream production facilities and infrastructure to meet a target production in the West Qurna-2 oil field in Southern Iraq, 64 km westwards from Basrah. The West Qurna-2 layout configuration has been arranged using the Central Processing Facilities (CPF) plus clustered oil production wells philosophy, so that the clusters (Well Pads) grouping a specific number of oil production wells and geographically distributed across the field on a strategic manner, are interconnected through an extended gathering system, to bring all the produced fluids into CPF. Mishrif Central Processing Facility (CPF) receives and separates the associated Gas, Oil and Water produced

from the Mishrif Fields. The produced water is suitably treated and then used as source for water injection on

the well pads for the reservoir pressure maintenance. All the utilities required for the CPF facilities operation

are internally produced with dedicated units.

Each of the Mishrif Well Pads will also serve as the area to allocate a specific number of water injection wells

which are to be feed by a number of high-pressure water injection pumps, plus stand-by unit, working in

parallel and distributing the water into each injection well using manifolds.

Position Held : Piping Construction Superintendent.

Duration : From 05th Feb. 2022 to Till Date.

Company : SICIM

Responsibility :

Prepare work package for submission & approval, conduct meeting regarding Shutdown, Finalising tagging & inspection of Tie-in blinding & de blinding, Execute Scaffolding & Review the material status for Shutdown/Tie-in.

Inspection the Purging & Cleaning activity of Live Line, execute drilling operation for Gas test before start Cold Cutting of Live Line.

Execute the fit-up & welding as per standard Tie-in Procedure with all NDT clearance, Blasting & Painting activities up to Final Inspection & Handover to Client at Shutdown/Tie-in.

Prepare the required Man-hour estimate for Project Scope.

Overall Supervision and Surveillance of job against the Milestone Packages.

Close Coordination to the Client/Contractor during Construction.

Coordinating and Proper Instruction giving to Hydro Testing Team against the Milestone Packages.

Coordination & Close supervision with construction team for the job completion of Milestone Packages with related all activities up to reinstatement.

Execution of Fabrication, Erection, Hydro-testing of various types of underground and above ground piping like Carbon Steel, Stainless Steel, Alloy Steel, Ltcs, Nace and RTRP requirement piping.

Regular co-ordinate with all worker with their daily job related to fit up, welding, painting, insulation of carbon steel, alloy steel, Stainless Steel, L.T.C.S material.

System wise inspection of pipe routing and field piping inspection like piping joints, weld edge preparation, set up, weld visual, Dye penetrate test, Hydro test, Hangers and supports pre- and post-installation and commissioning.

Supervise Contractors personnel in the field and prefabrication.

Ensure compliance with HSE standards and regulations.

Monitor work activities with regard to full compliance with the work permits and to detect further unsafe conditions or actions.

Ensure compliance with project standards and specifications.

Knowledge of Rigging Plan & Work Methodology.

Initiate changes if required in consultation with Superintendent

Co-ordinate with other contractor’s personnel for interfaces.

Follow up status of work & compare planned and actual figures.

Follow up installed quantities.

Keeping track record of increasing of quantity w.r.t BOQ and same to inform the client for amendment.

Ensure PTW (Permit to Work) System functioning as per procedure, wherever required.

Handling of PTW System as a Holder.

Preparation of As-Built Drawings.

Planning of Drawing Distribution, Erection Schedule and Monthly wise and Day-to-day program.

To plan Activities for Erection and Fabrication.

2: UZBEKISTAN GAS TO LIQUID PROJECT (UZGTL)

Project Value: USD 3.6 Billion

Scope of Work: PMC service in Design, Detailed Engineering, Procurement, Construction and Commissioning

Project Overview

The Contract between Uzbekistan GTL LLC and Technip PMC Services Limited was concluded as of July 27, 2017, with the main scope to assist that Uzbekistan GTL LLC’s and its Investors interests are fully protected throughout all stages of the EPC Phase of the project. Considering experience of many years and personnel’ competence, Technip PMC Services Limited is committed to provide complete and independent Project Management services and associated services to support Uzbekistan GTL LLC in the management of the EPC contract; including both technical and commercial support. In addition, Technip PMC Services Limited is committed to support optimization of material and equipment logistics and transportation including availability of worldwide vendor inspection specialists.

The GTL process involves the use of Sasol SPD™ technology for converting sweet methane rich gas (MRG) into liquid hydrocarbon products (GTL Diesel, GTL Kerosene, GTL Naphtha and LPG) in three steps:

• Synthesis Gas Production

• Fischer Tropsch Synthesis

• Product Work-up

The Core Process Units (SPL scope) are Synthesis Gas Unit (SGU), Fischer-Tropsch Synthesis (FTS), Heavy Ends Recovery Unit (HER), Water Treatment Unit (WT), Wax Treatment Unit (WTU), Product Work-up Unit (PWU), LPG Treatment Unit

Support Process Units are provided to support the Core Process Units. These include an Air Separation Unit (ASU) which supplies oxygen to the SGU and a Hydrogen Production Unit (HPU) which supplies hydrogen to the PWU and to the sulphur removal reactors in the SGU.

Position Held : UZGTL Approved Senior Piping Superintendent-Construction.

Duration : From June 2020 to April 2021

Company : Technipenergies, Abudhabi

Responsibility :

All site activities are properly monitored and relevant quality record are established and maintained.

Regular interaction with project site function to ensure all work is in compliance with quality, contract requirements, accurate construction practice, only approved materials are used, compliance with (AFC) shop and site drawings, and report any deviations to Construction Manager/ Construction director.

Ensure that site inspections are carried out as per the intervention points marked in the approved ITP.

Regular visits to Contractor's store to make sure that all storage, handling and preservation activities are carried as per the manufacturer recommendations.

Closely monitor the project site activities in respect of Quality, Safety and Progress and advice Construction manager of finding, area of concern and corrective actions.

Advise Construction Manager of any foreseen slippage of Progress and propose corrective actions.

Attend weekly progress meeting, weekly technical meetings and Monthly Executive Meeting, (Positively participate in agenda preparation) and prepare minutes of meetings.

Participate with PMC staff in final inspection of work and preparation of Punch List.

Reviewing and assessing the close out report submitted by Contractor.

Manage Project engineering and technical aspects of Project (FEED) to ensure timely completion of project work and deliverable with defined levels of quality to support the overall Project safety, quality, cost & schedule targets.

Overall supervision & Execution of the EPC contractor and their sub-contractors in the disciplines of mechanical, piping, pipeline, tank and civil/structural works. Coordinating with consultants, contractors and clients as well as with Fabrication, Erection and Execution department for follow up for drawing approval.

Regular analysis of piping execution by study of 2D and 3D drawings.

Study the drawings issued for construction in detail well in advance and identify if there is any mismatch between drawings and specifications / BOQ description / construction already carried out as well as any missing details and raise RFI to Project to get required details in time.

Maintain documentation and material reconciliation records.

Witness tests related to quality aspects and maintain records.

Participation in successful implementation of safety program as per contractual requirement.

Maintain joint record / document for the deviations from the drawings, dismantling quantities etc.

Verification and certification of quantities of RA Bills / Final bills submitted by the contractor.

3: EXPANSION & REVAMPING OF AHMADI DEPOT-LM, AHMADI (KUWAIT)(ONSHORE PROJECT)

Project EPC Value: USD 236.09 Million

Scope of Work: Design, Detailed Engineering, Procurement, Construction and Commissioning

Project Overview

Punj Lloyd has bagged the order for expansion and revamping of Ahmadi Depot from Kuwait National Petroleum Company (KNPC). This project, valued at Rs 1,418 crore ($236.09 million), is scheduled for completion in 35 months. The scope of work includes the Design, Detailed Engineering, Procurement, Construction and Commissioning of 11 new Floating Roof Product Tanks with a capacity of around 228,000 cubic metres. It also includes allied civil work, interconnecting piping, construction of multiproduct loading points, sub-substation with all electrical systems including emergency power supply and control building besides replacement of depot automation systems (TAS), integration to the new tank gauging system, up gradation of existing Vapour Recovery Unit (VRU), Cathodic Protection System with remote monitoring, fire protection system and all utility packages.

Position Held : KNPC Approved Mechanical Supervisor-Piping.

Duration : From May 2016 to 31st May 2020

Company : Punjlloyd Limited

Responsibility :

Coordinating with consultants, contractors and clients as well as with Fabrication, Erection and Execution department for follow up for drawing approval.

As Built/red Line Mark Up of Isometric Drawing according to site conditions.

Managing fabrication / erection of PIPING/ PIPELINE - Underground & Above ground, Tank Dyke wall Piping (Fire water, Foam System & Process pipes), Building Gas Suppression System Piping, Hydro testing, Pneumatic testing & Pre – Commissioning.

Reviewing construction documents made by field Engineering Group as per the site requirement.

Studying P&ID, GAD and Isometric Drawings

Preparation of MTO and co-relate with bulk MTO

Communicating with warehouse and procurement department

Planning with reference dispatch schedule, front availability

Preparing material list / fabrication drawings with spool marking

Piping spool fabrication and support fabrication as per standard and spool erection

Preparing stage wise fabrication and erection progress report and daily progress report.

Generating punch list and attending the balance mechanical job for mechanical clearance of test

4: SPIKING GAS COMPRESSOR PROJECT, ABUDHABI (UAE)(ONSHORE PROJECT)

Project EPC Value: USD 86 Million

Scope of Work: Detail Design, Engineering Support for Procurement & Construction.

Project Overview

Punj lloyd bags Shah Field Development Abu Dhabi Company for Onshore Oil Operations (ADCO) intents to install an additional Spiking Compressor along with two new reciprocating Spiking Compressor trains at Central Degassing station (CDS).Spiking Compressors will send the sour gas to AL Hosn Plant.Well Fluids From Shah Field Facilities are collected at three processing areas

Namely : Shah Remote Degassing station (RDS)1,Shah RDS 2 & the Shah CDS Facilities where all the extracted fluids are fed to two-three phase production separators, For the separation of Oil, Water & Gas. The sour gas separated in the production separators is sent, through a 14” line to the suction manifold of Spiking Compressors.

Position Held : Deputy Manager Piping Construction.

Duration : From 14th Dec 2014 to 30th April 2016.

Company : Punjlloyd Limited

Responsibility :

Become knowledgeable of the Project and Construction HSE Plan.

Responsible for Mechanical Works such as Equipment Erection, Piping works, etc.

Supervise Contractors personnel in the field and prefabrication.

Ensure compliance with HSE standards and regulations.

Monitor work activities with regard to full compliance with the work permits and to detect further unsafe conditions or actions.

Report all safety observations & induced measures in report.

Ensure compliance with project standards and specifications.

Knowledge of Rigging Plan & Work Methodology.

Initiate changes if required in consultation with Superintendent

Co-ordinate with other contractor’s personnel for interfaces.

Follow up status of work & compare planned and actual figures.

Follow up installed quantities.

Keeping track record of increasing of quantity w.r.t BOQ and same to inform the client for amendment.

Recognize appearance of problems and report those items.

Reporting of deficiencies regarding quality of the work.

Monitor contractor’s personnel planned and actual.

Compile and follow up of punch items list.

Co-ordinate with other external team members.

Participate in meetings on request.

Log and file all documents necessary for daily work and as built.

Check and execute isometric drawings.

Preparation of test packs and material for hydro tests.

Recognize appearance of problems and report those items.

Reporting of deficiencies regarding quality of the work.

Compile and follow up of punch items list.

Experience in welding techniques, standards and documentation

5: SHAH GAS DEVELOPMENT PROJECT (PACKAGE-1) (UAE) (ONSHORE PROJECT)

Project EPC Value: USD 296 Million

Scope of Work: Construction, Pre Commissioning & Commissioning

Project Overview

Punjlloyd won an EPC contract for the Shah Gas Development project in Abu Dhabi in consortium with Technicas Reunidas of Spain. The consortium will execute the Gas Gathering Package for the project. The order valued at Rs. 20,560 million has been awarded by Abu Dhabi Gas Development Company Limited. The package includes development of well pads, flow lines; inter pad lines, transfer lines and overhead lines. Gas Gathering is designed to handle wet produced gas with H2S concentrations greater than 23% and about 10% CO2 at a wellhead flowing temperature of 113 C. The Shah Gas Gathering System collects 1,000 MMSCFD of well stream gas from the various Shah Wells and transports it to the Shah Processing Facility. Punj Lloyd was contracted for the Shah Gas Gathering project to construct eight well pad systems each consisting of a Satellite Pad and a Main Pad. Major facilities at each well pad included wellhead control, flow gathering and measurement, pressure protection, flare and drain, pig launching and/or receiving, cathodic protection, fire & gas detection, telecommunication and security systems. Besides this, Punj Lloyd had to construct the four inter-pad lines, two transfer lines and flow lines.

Position Held : Deputy Manager Piping Construction.

Duration : From Jan 2013 to Nov 2014.

Company : Punjlloyd Limited

Responsibility :

Execution of Fabrication, Erection, Hydro-testing of various types of underground and above ground piping like Carbon Steel, CRA Cladded Pipes, Stainless Steel, Alloy Steel, Ltcs, Nace requirement piping.

Regular co-ordinate with all worker with their daily job related to fit up, welding, painting, insulation of carbon steel, alloy steel, Stainless Steel, L.T.C.S material.

System wise inspection of pipe routing and field piping inspection like piping joints, weld edge preparation, set up, weld visual, Dye penetrate test, Hydro test, Hangers and supports pre and post installation and commissioning.

Ensure PTW (Permit to Work) System functioning as per procedure, wherever required.

Handling of PTW System as a Holder.

Preparation of As-Built Drawings.

Planning of Drawing Distribution, Erection Schedule and Monthly wise and Day-to-day program.

To plan Activities for Erection and Fabrication.

6: INTEGRATED GAS DEVELOPMENT PROJECT (U&O), ABUDHABI (UAE) (ONSHORE PROJECT)

Project Value: USD 14 Million

Scope of Work: Construction, Pre-Commissioning & Commissioning

Project Overview

Punjlloyd secured a contract from the Hyundai Engineering and Construction Company Limited for the Steel Structure, Equipment and Piping Installation works on Habshan-5 Utilities and Offsite project in UAE for a value of approx. Rs 960 million.

Position Held : Sr.Piping Construction Engineer.

Duration : From Mar 2011 to Dec 2012.

Company : Punjlloyd Limited

Client : Hyundai Engineering

Responsibility :

Tie In /Shutdown activities participate in Tie-In meetings with Client/Contractor also carry out site Survey of Tie-In Location for need of Shut down Requirements.

Maintain the established project schedule by coordinating with Client/Contractor.

Making Of Tie-In Packages for Submission to Client/Contractor.

Identification marking of Positive Isolations Limits with Latest revision Of P&Id’s Prepare Documents for Tie-In like Method of Statement, Job Safety Analysis etc...

Coordinating and Executing Manpower for spool making In Isometrics for Tie-In.

Coordinating & Arranging Materials which are required for Tie-In.

Coordinating & Executing Hydro testing of Pre-Fabricated Spools required for Tie-In.

Prepare work package for submission & approval, conduct meeting regarding Shutdown, Finalising tagging & inspection of Tie-in blinding & de blinding, Execute Scaffolding & Review the material status for Shutdown/Tie-in.

Inspection the Purging & Cleaning activity of Live Line, execute drilling operation for Gas test before start Cold Cutting of Live Line.

Execute the fit-up & welding as per standard Tie-in Procedure with all NDT clearance, Blasting & Painting activities up to Final Inspection & Handover to Client at Shutdown/Tie-in.

Prepare the required Man-hour estimate for Project Scope.

Overall Supervision and Surveillance of job against the Milestone Packages.

Close Coordination to the Client/Contractor during Construction.

Coordinating and Proper Instruction giving to Hydro Testing Team against the Milestone Packages.

Coordination & Close supervision with construction team for the job completion of Milestone Packages with related all activities up to reinstatement.

Execution of Fabrication, Erection, Hydro-testing of various types of underground and above ground piping like Carbon Steel, Stainless Steel, Alloy Steel, Ltcs, Nace requirement piping.

Regular co-ordinate with all worker with their daily job related to fit up, welding, painting, insulation of carbon steel, alloy steel, Stainless Steel, L.T.C.S material.

System wise inspection of pipe routing and field piping inspection like piping joints, weld edge preparation, set up, weld visual, Dye penetrate test, Hydro test, Hangers and supports pre- and post-installation and commissioning.

Ensure PTW (Permit to Work) System functioning as per procedure, wherever required.

Handling of PTW System as a Holder.

Preparation of As-Built Drawings.

Planning of Drawing Distribution, Erection Schedule and Monthly wise and Day-to-day program.

To plan Activities for Erection and Fabrication.

7: Borouge-II Project, NGI Project, SSGP Pipeline Project & 2x250 MW Hydro Electric Power Plant (Sep 2006 to Mar 2011)

Punj Lloyd Group is a diversified global conglomerate providing Engineering & Construction services in Oil & Gas, Infrastructure and Petrochemicals, and with interests in Defence, Aviation, Marine and Upstream sectors.

EPC for Nitrogen Generation & Injection (Mixed case) Project. Habshan, UAE

Client: -Abu Dhabi Gas Industries Limited. (GASCO).

Duration: -From July 2010 to Mar 2011.

Responsibility: -Worked as Sr.Piping Engineer In Construction Activity at Site.

Construction of Offsite & Utilities Borouge-II Project, Ruwais, Abu Dhabi, UAE

Client: -Technicas Reunidas of Spain

Duration: - From July 2009 to June 2010.

Responsibility: - Worked as Sr.Piping Engineer In Construction Activity at Site.

EPC OF 2X250 MW CHHABRA THERMAL POWER PLANTS, Rajasthan,India

Client: - RAJASTHAN RAJYA VIDYUT UTTPADAN NIGAM LIMITED

Duration: -From Jun 2008 to Jun 2009.

Responsibility: -Worked as Piping Engineer in Construction Activity at Site and carry out ACW, CW, DM water Pipeline, GRE Pipeline, Fire Fighting system Pipeline, HFO Tank Ring & Riser.

EPC OF SABAH SARAWAK GAS PIPELINES PROJECT (525 KMS). Malaysia

Client: - PETRONAS

Duration: -From Sep 2006 to May 2008.

Position Held: -Worked as Piping Engineer in Construction Activity at Site and carry out Piping of Metering station, Pig Launcher & Receiving station & Valve Station.

Responsibility: -

Checking Bill of Materials.

Checking of Material Specifications.

Checking of Hydro test /Pneumatic test pressure as per line class.

Spool marking on Isometrics as Shop Weld & Field Weld joints.

Checking of NDT requirements as per specification.

Updating Revision drawings.

Checking of pipe support. Giving full clarity regarding support drawings to site engineers.

Shop & Site clarification regarding any difficulties in drawings for Fabrication or Erection.

Coordination between Client & Site Engineers.

Preparation of Test packages.

Marking of Test limit in P & ID Drawings for Hydro test & Pneumatic test.

Modification (AS BUILT) drawings preparation in AutoCAD as per site condition or changes.

AREA OF INTEREST

●Planning

●Construction

●Execution

●Hydro testing

●Pre commissioning

LANGUAGE

●English (Skill level Fluent)

●Hindi (Skill level Fluent)

DECLARATION

I hereby solemnly declare that the above –furnished Details are true to the best of my knowledge &belief.

Place: Signature

Date: (Ashis Kumar Dhal)



Contact this candidate