PIPE FITTER

Jubilee Magdale

House Address: Blk. 3 Lot 16 Farmers II Brgy. Tumana,

Marikina City, 1807, Philippines

Telephone: Philippines (0063) 938-***-****

(0063) 938-***-****

(009**-*********

Email address: advd22@r.postjobfree.com

SUMMARY OF QUALIFICATION

• Experience in oil and gas, petrochemical and power plant, cement plant industries.

• More than 21 years experience in process piping

• Sound knowledge of industry codes and standards, P&IDS, and working drawings.

• Self-motivated, organized and calm under pressure

• A team player.

EXPERIENCE

Kentech Company

November 01,2022 up to

Present

Aramco Upgrade

Ethane Facility NGL

Project juaymah

K. S. A.

PIPING SUPERVISOR

• Review drawing, materials take off and field sketches for construction and request of piping materials.

• Arranging for all required tools, equipment and consumable materials required to pipe line work.

• Supervise and perform the piping fabrication and welding of all different sizes of piping materials.

• Daily coordinating with other piping supervisors working in adjacent same areas and allocates adequate craft resources specific work assignment on the project.

• Supervise and technical support for fit up and pipe alignment and welding in the trenches for proper direction of pipe line.

• Supervise and technical support for pipe lowering in proper location prior for backfilling.

• Supervise the technical direction and support to the foremen and crafts for installation fit-up and welding the different sizes of piping works in accordance with the drawing. SNC Lavalin/Kent February 13, 2018 to

October 30, 2022

NAUG System B facilities

Turaif province

Kingdom of Saudi Arabia

PIPING SUPERVISOR

• Preparing to monitoring of fabrication sequencing as per codes and standard during fabrication works is performed in accordance with approved construction procedure, specification and correct materials or process piping and Underground RTR piping.

• Supervision of shutdown work of all 4 SPF removal and reinstalled the internal parts such as filters, ring plate, packing ring, tray and chimney tray

• Direct supervision for installation of RTP from process area to wellhead

• Direct supervision for installation of piping and mechanical works

• Responsible for conducting daily tool box talk and providing safety awareness to the crew members before starting activities.

• Supervise the team for timely and accurate work execution, ensure that all the work activities are in safe condition and get completed as per the quality norms and as per project specification.

• Responsible for establishing, promoting and maintaining a safe and hazard free working environment formulated and developing safety policies and procedures with the help of the HSE department.

• Supervision to maintain proper housekeeping of the work location.

• Reporting discrepancies occurring designed error, collisions for initiating the project specific solution.

• Supervise all construction related work activities and assigned field functions and or crafts involved within discipline on the project.

• Ensure that piping construction working within the discipline adheres strictly to the latest approved for construction ( AFC) project drawings, specification, ITP's procedures and site instruction.

• Supervised to close the punch list items prior to hydrotesting.

• Supervise to reinstatement as per package wise after hydrotesting and air blowing.

• Supervise and manage the shutdown activities at the ( SPF) system process facilities to replace existing internal tray according to the revision drawings specification and piping works. SK Engineering & Const.

GS Engineering and Const

Chiyoda Const. and Technif

February 22, 2016 to

February 21, 2017

NSRP Project JGCS

Consortium

Nghi Son Economic Zone, Tinh

Gia District, Thanh Hoa

Province

Vietnam

Project completion

PIPING SUPERVISOR

• Serves as day-to-day interface with Contractor piping craft labor providing a focus on safety and quality.

• Ensures that procedures and processes are understood and followed by the construction personnel.

• Monitoring fabrication of spool support and using a bending machine automatic and manual bending machine.

• Provides on-site knowledge of project specific piping construction requirements.

• Verifies arrival of procured equipment and engineering equipment.

• Assists with incident response case management.

• Interfaces with QA/QC personnel to address quality issues/progress.

• Assists in implementation of emergency response plans as needed.

• Completing and reviewing as-built documentation for piping installations.

• Supervise and assist to close out the punch list item as per work package prior to hydro testing or pneumatic testing.

• Conduct walk around with IPMT and OPT. as-per system inspection prior for mechanical completion.

• Daily coordinating with other piping supervisors working adjacent to the same area and allocates adequate craft resources to specific work assignments on the project.

• Supervise the piping installation of different sizes on the pipe rack, equipment.

• Coordination with QC department prior for line checking

• Supervise the underground piping installation such as Fire water line, COC, AOC

• Coordinating with engineering on all the technical problems encountered in the site condition.

• Supervise the reinstatement activity as-per work pack condition.

• Supervise the project cleanliness requirements, maintaining good work man shift and fulfilling all safety, quality and productivity requirements pertaining to work.

• Monitoring and performing Hydro testing Large and small bore.

• Completing final system walk around, deficiency tracking and closed - out . SK Engineering & Const.

April 08, 2013 to November 27,

2015

ARAMCO-WASIT Gas Plant

Projet Package # 3

Khursaniyah

Jubail Saudi Arabia

Project completion

PIPING SUPERVISOR

• Supervision and assist the subcontractors for their work and quality standards for them meeting the project specifications.

• Monitoring of fabrication of large bore small bore spools and support include bending plate for support.

• Supervision to the team and ensure that all work activities get completed as per the quality norms and as per project specifications.

• Responsible for ensuring smooth day-to-day operations, scheduling and technical support. Consults with other functions’ employees on the proper integration and requirements for timely completion of work as planned.

• site piping team for the piping deliverables production including equipment layouts, plot plans, Gas, isometrics, piping Line checking as per isometric drawing to ensure all the line is complete prior to hydro testing activities.

• Line checking as per isometric drawing to ensure all the line is completed prior to hydro testing activities.

• Supervision for erection follows up (pipes, valves, steam tracing and support), site modification

(if required), punch list and systems preparation for hydro test.

• Supervising and coordinating site piping team for the piping deliverables production including equipment layouts, plot plan, GA, isometrics, piping supports and MTO. Also responsible for site surveys for verifying piping scope of work. Supervision on site of piping erection included following areas.

• Reviewing the piping design documents (P&ID, isometrics, Gas, tie-ins list, supporting details and MTO) preparation of equipment and manpower, and supervision of all stages of the piping process.

• Supervision to control of each spool site fabrication (recording and numbering welding), erection planning and preparation of erection site (such as scaffolding, crane etc.), installation of pipes according to arrangement piping plans drawings.

• Ensuring the system closed, flanges tight together and instrumentation installed (punch list according to P&I diagram) then flushing, following which the system would be ready for commissioning and start up. Activities also included provision of as built drawings following modification.

• Monitoring and performing Hydro testing Large and small bore.

• Monitoring to install fire water line pipes, valves, check valves, and sprinkler. EEI Corporation

June 18, 2011 to December 15,

2012

VALE Inco Limited, Bioko

Island

Deerek Gee Const.

Nickel Plant And Refinery

Project Pty. Ltd.

New Caledonia, France

Project Completion

PIPING SUPERVISOR, ASSIGNED AS QC FIELD PIPING INSPECTOR

• Work pack development of pressure test package and responsible for witnessing / accepting hydro, pneumatic and service test of piping systems

• Completing and verifying quality documentation per-inspection and test plans.

• Performing inspection and documentation of all piping work in progress on a continual basis as per ITP.

• Coordinating technical assistance to the piping superintendent, supervisor and craft.

• Completing final systems walk down, deficiency tracking and close-out.

• Completing and reviewing as-built documentation for piping installations.

• Internal inspection of equipment cleanliness prior to piping installation, closure when no man way is available.

• Performing in-progress cleanliness inspection of piping materials prior to installation.

• To ensure and record the unique identification number of all butt joints until all inspection, testing and documentation is completed.

• Ensure correct alignment is achieved before tightening that the correct washers and gasket are inserted and that correct lubrication, torque section and tightening sequence are used during bolt tightening

• Witness internal hydraulic pressure tests in accordance with the code and project specification. Bechtel Construction

Incorporation

March 14, 2010 to

March 15, 2011

Chebron Client Phase 1 Lng

Refinery Project.

Zoyo Zaire Province Overseas

Angola, West Africa

Contract completion

PIPING SUPERVISOR

• Arranging for all required tools, equipment and consumable materials required to maintain piping cleanliness, fabrication and installation.

• Review drawing, materials take off and field sketches for construction and request of piping materials at the warehouse and assist expediting to the site location.

• Supervise the project cleanliness requirements, maintaining good work man shift and fulfilling all safety, quality and productivity requirements pertaining to work.

• Conduct meetings to the Gen. Foremen, foremen and crafts to develop a similar piping execution plan in order to meet project requirements and ensure 100 percent adherence to all sites ES and H requirements.

• Daily coordinating with other piping supervisors working in adjacent same areas and allocates adequate craft resources specific work assignment on the project.

• Review manpower requirements, planning for the execution of all activities for assigned discipline and 3 weeks look ahead schedule, and coordinate materials with field engineering.

• Supervise and perform the piping fabrication of all different sizes of piping materials.

• Supervise the technical direction and support to Gen. Foremen, foremen and crafts for installation the different sizes of piping works according to the drawing.

• Supervise and assist preparation on fabrication to the manifold, blind etc. prior to hydro testing activities.

• Supervise during hydro testing, pneumatic test activities to all different sizes of pipe high pressure and low pressure including restoration after pipe cleaning as per project procedure.

• Supervise cleaning air blowing, water flushing, chemical cleaning of pipes and equipment with pre-commissioning procedure and specific job specification.

• Monitor and supervise the work of every member of pre-commissioning team, safe operation and confirm that pipes, instruments and equipment are conveniently aligned in reinstatement period. GCT Team / Forster Wheeler

EEI Construction Corp.

October 26, 2007 to

October 06, 2009

Nickel Plant And Refinery

Project

Bioko Island, New Caledonia,

France

Visa contract completion

PIPING SUPERVISOR

• Supervise and organize crews, completing discrete areas of work giving daily safety talk to ensure the crew perform each day's task with maximum efficiency, coaches, recognizes and discipline subordinates to drive standard of professional behavior.

• Conduct meetings to support man hours and schedule targets and to ensure foremen observe starting and quitting time.

• Coordinates with the warehouse for all materials requested by engineering and makes sure that it goes to the right foremen and no materials are missed out.

• Supervise the technical direction of piping fabrication located at the site and fully support the supply and request piping materials as per drawing.

• Coordinates with engineering on all the technical problems encountered in the field.

• Supervise on piping installation and pipe supports of small bore, big bore, carbon, stainless, galvanized etc.

• Supervise and assist to close out the punch list item as per work package prior to hydro testing or pneumatic testing.

• Supervise during testing, restoration and pro-commissioning activities as well as utility line includes low and high pressure steam line, plant air, instrument air, nitrogen, treated water and demineralized water.

• Supervise the installation of different kinds of valves, control valves, globe valves, butterfly valves during restoration.

• Perform and organize activities on commissioning and testing in accordance with procedure, standards and other guidelines for pre-commissioning and commissioning works.

• Conduct regular cleanliness walk down review of the work activities, identifying areas of concern, including safety hazards the required special planning and attention. Bechtel Construction Overseas

Corporation and EEI

Corporation

July 19, 2005 to July 11, 2007

Malabo Equitorial

Train 1 Lng. Refinery Project.

Guinea, West Africa

Project completion

GEN. FOREMAN PIPING/ SITE PROMOTED PIPING SUPERVISOR

• Coordinating to my superintendent to arrange the required tools, equipment and consumable materials required for fabrication and installation of piping activities.

• Review drawing and coordinating at the warehouse for request of piping materials and assist expedite prior to fabrication and installation.

• Coordinating QA/QC department prior to final inspection of piping fabrication activities before installation on structure was located as per drawing.

• Conduct and assist final inspection to all flange face nozzles on rotating equipment, exchanger, vessel tank, before flange to flange connection during installation of piping activities.

• Supervise during installation of big bore and small bore connecting to compressor equipment with coordinating to the mechanical department to ensure the alignment is correct.

• Supervise and monitor the punch list item as per test package to ensure it is close out prior to hydro test.

• Supervise the foremen and crafts for safety, quality, budget and schedule performance.

• Supervise and assist pigging of underground and above the ground pipe during pre- commissioning process to ensure no rubbish inside the piping line.

• Preparation of isometric drawing and P&ID for blind list as-per commissioning order to prior shut down and installation of blind to the cold box, compressor, vessel, exchange connecting to pipe to ensure no gas release during to perform pre-commissioning. PREVIOUS EXPERIENCES: All Project completion

EEI CONSTRUCTION CORPORATION, Limay Bataan, Philippines Piping Foremen, Petro Gas Refinery Plant Project

2004-2005

AL-RUSHAID CONSTRUCTION CO.LTD. / EEI CORPORATION, Jubail, Saudi Arabia Piping Foremen, Jubail United Petrochemical Company (JUPC) Ethylene Plant Project. 2003-2004

SAUDI ARAMCO OPERATION/ AMEC CONSTRUCTION INC/ ARCC-EEI. CO. Jubail, Saudi Arabia Piping Foremen, Jubail Phase II LNG. Gas Plant Project. 2002-2003

BECHTEL CONSTRUCTION CORPORATION/ MHI. CONST./ ARCC-EEI CORP. Rastanura, Saudi Arabia Pipe fitter, Rastanura, Ghazlan II 2400 MW STG Power Plant. 2000-2002

BECHTEL CONSTRUCTION CORPORATION/ EEI CORPORATION, Mauban Quezon Philippines Pipe fitter, Phase I 440 MW Coal Fired Thermal Power Plant Project. 1998-1999

COMTECH CONST / ROBLETTE INTERNATIONAL CORP. Lugait Mis. Or. Philippines Pipe Fitter, Alson Cement Plant expansion Project. 1997-1998

SKILLS

Computer: Microsoft xp/vista

Applications: Excel, Word, Internet Explorer

EDUCATION

Mindanao State University (MSU-IIT)

Metallurgical Engineering ( Under Graduate )

1995-1996

CERTIFICATION

BECHTEL INTERNATIONAL CO. ANGOLA, ZOLO ZAIRE PROVINCE, WEST AFRICA

SUPERVISORY SEMINAR

September 2010

FLOOR DANIEL CORPORATION OPERATION JUBAIL PETROCHEMICAL COMPANY K.S.A.

PERMIT ACCEPTOR

October 2003

PERSONAL DATA

Age: 46

Date of birth: March 11, 1976

Place of birth: Punta Silum, Manticao, Misamis Oriental 9024 Height: 5’4

Weight: 75kg

Civil Status: Married

Passport Number: P7742690B

Language knows: Tagalog, English, Visaya



Contact this candidate