Post Job Free

Resume

Sign in

Aircraft Cabin Time Delivery

Location:
El Cajon, CA
Posted:
February 14, 2023

Contact this candidate

Resume:

Adeline Delgleize

advbr0@r.postjobfree.com

949-***-****

Summary:

A result oriented professional with diverse background in equipment planning and inventory management.

Responsible for the Hardware Engineering Mechanical and Electrical planning for design, iterative development and production phases for Panasonic’s In-Flight Entertainment systems for various commercial airlines.

Involved in purchase requisitions of $250M annually and management of $30M of inventory management for multiple build projects simultaneously Interface cross-functionally with hardware and electronic engineers.

Proficient with Microsoft Word, Excel, Databases, and Lab equipment such as Oscilloscope, Digital Millimeter and Signal Generator.

Performed quality assurance reviews of Gas Company Transmission and Distribution maps in concert with map drafting engineers.

Scheduled printed circuit board assembly and qualification testing with board houses and testing laboratories.

Installed and maintained workstations and Client/server LAN/WAN configurations, Cisco routers, switches, hubs, network Interface cards.

Skills:

Oscilloscope

Digital Millimeter

Signal Generator

Logic Probe

HI-pot Tester

Spectrum Analyzer

Geometry/Trigonometry

Accounting

Database Administration

Metashop Scheduler

Presentation Graphics

Read Schematics

Technical Writing

Test Reports

ERP

Oracle

MS Project

MS Excel

MS Office Suite

KONFIG (Document Control)

Education:

Associate of Applied Science, Electronics Engineering from ITT Technical Institute, Anaheim, CA.

Associate of Arts Computer Information/Science Systems Analyst, Computer Information/Science Department, Cerritos College, Norwalk, CA.

Computer Science Continuing, CA/ MT San Jacinto College, Menifee, CA.

Certificate:

Computer Programming

Windows NT Network Administration

Safran Aerospace Corp. Aircraft Cabin, Garden Grove, CA Apr 22 – Aug 31, 2022

Planner/Scheduler

Responsibilities:

Plan and prepare production materials, travelers and work orders.

Evaluate shortages and notify Production Manager of potential long lead-times and supply chain concerns.

Review material availability utilizing Millenium M3 ERP/MRP system to plan actions/resource scheduling in support of production release to integrate into MPS.

Plan, prepare, issues and controls production orders and material requirements to ensure a controlled flow of approved materials and production orders to meet production requirements.

Reviews shortages in existing backlogs and advises management when on-time order deliver is in jeopardy.

Reviews procured items and releases expedite requests to purchasing when urgency is apparent.

Coordinates subcontracted orders and creates all required paperwork, Requests physical count of Raw Material and WIP inventory, identifying and solving inventory variances.

Utilization of LeanDNA environment to optimize inventory stores in regard to purchasing levels and to provide visibility to all business units of material usage and availability.

Coordinates with all teams involved in ensuring timely assessment of failed product in receiving inspection or Production inspection; address any planning related issues such as critical path items.

Interface with department personnel including Material Handlers, production and buyers to resolve material availability and forecasting.

Reviews and is proactive concerning requests from MRB and Squawks.

Collaborates with Development planning group in order to support any required action to implement new Engineering Drawing and Design Changes.

Inputs data into various systems and creates/prepares reports for management in regard to forecasting and trend analysis.

Amazon Fullfilment Center Jul 2014 – Mar 22

Warehouse/Logistics/Expediter

Responsibilities:

Provide process improvement in regard to product placement and logistics.

Liaise with shipping and receiving to ascertain warehouse space and product movement in warehouse.

Awareness of shipment arrivals / staging of product and sorting.

Confer with team and management in regard to safety measures and injury prevention.

Recognize Hazardous Material labeling and safety concerns regarding handling and storage.

Team-Building and motivation of my team to increase productivity and to reach daily quotas.

Panasonic Avionics Corp., Lake Forest,CA Mar 06 – Nov 13

Engineering Planner/Expeditor

Responsibilities:

Responsible for the Hardware Engineering Mechanical and Electrical planning for design, iterative development and production phases for Panasonic’s In-Flight Entertainment systems for various commercial airlines.

Optimimize electronic component selection for printed circuit boards, investigate and identify alternate electronic components for substitution and interchangeability with an acute awareness of cost, schedule and obsolescence of certain components.

Obtain quotations from electronic component vendors, PCB fabricators and Assembly houses as well as fabricators of sheet metal and hardware piece parts to detailed specifications and fit, form and function.

Timely submittal of Purchase Requisitions of $250M annually and management of $30M of inventory management for multiple build projects simultaneously Interface cross-functionally with stockroom personnel, hardware and electronic engineers, assembly, quality and inspection personnel to provide status of progress to management and project management.

Demonstrated acumen for identifying IC Packages, footprints and scalability

Schedule printed circuit board assembly and qualification testing with board houses and testing laboratories. Acquire test setup cable assembly material including wiring, connectors, and interfaces.

Weekly status of projects progress in MS Project PMP environment.

The ability to read schematics and to interface with document control for Engineering Change Orders and implementation into Bills of Material, Manufacturing Change Orders and Configuration Management Databases in an Oracle ERP environment.

The engineering mechanical domain affords interface with hardware engineering designs, sheet metal fabrication for molds and castings, and various fittings.

This supply chain includes domestic, overseas, and Panasonic internal inventory accountability.

Assigned to team to design, implement and test data for data migration in Oracle Environment. Initiate and follow-through of rework of re-configured printed circuit boards failure analysis and EOL processing.. Procure various wire and connectors for test cable assemblies per harness assembly drawings.

Interface with Electrical Engineers to ascertain Sustaining Engineering Design anomalies for rework or replacement.

Material Planning for IFE kicks-off in a development phase wherein a Master Development Schedule is provided for up to 3 prototypes builds of electronic circuitry printed circuit boards, hardware housings, assembly, prototype build, and acceptance testing.

Provide with a parts list from electrical design engineering and hardware design engineering.

After checking in-house inventory levels for electronic components.

Prepare requisitions to source various integrated circuits, hardware pcb board fabrication, wire, connectors, and test fixtures.

Component obsolescence and long-lead items that impact Master Schedules are statused daily in MS Project.

Critical path issues regarding long lead deliveries, assembly and test preparation are addressed as a priority to avoid compromise to schedule milestones and to facilitate accurate program reporting.

Implemented and multiplied for up to 5-6 IFE installations, each of which is statused daily and weekly.

As prototypes are designed, assembled and tested, it is imperative that each project’s supply chain is well-oiled.

This involves statusing deliveries with vendors, inspection upon delivery, and the physical location of material and progress of their processes.

Upon acceptance and approval of a Development IFE system, the production phase schedule is invoked with Bills of Material, Configuration Mgmt, and Engineering Change Orders.

Expediting duties at Panasonic encompass ensuring On-Time Delivery and its metrics as concerns inventory management, lead time projection and availability, logistics, and quality while focusing on cost control and schedule targets.

Prepare Traveler documents to implement, status, and complete the products physical location from build to final inspection and acceptance.

Conduct Supplier Quality surveys to ascertain AS9100, ISO9001, RBuOHS, Reach and Non-use Chemical Substances implementation as a consideration for status as an Approved Supplier for Panasonic.

Provide data structure analysis to develop Business Intelligence definition in regards to Procurement reporting, data relationships.

Zemarc Corporation/Fec International, Los Angeles, CA Nov 04 – Feb 06

Purchasing/Technical Sales/Export Documentation

Responsibilities:

Familiarity of a myriad of industrial and mobile motion control products including hydraulics, pneumatics, accumulators, fittings and hoses merged into an MRP environment in which I was the Purchasing Manager.

It was incumbent to keep this international distributor with a cadre of sales personnel, aware of forward monthly quantitative demands of product lines, logistics, and usage history.

Responsibilities of this position expanded to encompass international sales which required a technical acumen to research and recommend industrial motors, hydraulic pumps, valves and cylinders as they integrated as a module into an existing system or stand-alone configurations.

Used mathematical aptitude for converting specifications such as torque, pump capacity, and psi, to a pre-dominantly Asian market measurement system.

A large aftermarket demand was met for filters, hoses, seals, and fittings which permitted great exposure to fluid viscosities and particulate properties of fluids and filtering materials.

Exacting preparation of Export Documentation to include identification of Harmonized Codes, Hazardous Materials, Bills of Lading and Shipment Manifests.

Focus Industries, Inc., Lake Forest, CA Mar 04 – Oct 04

Assistant Product Manager

Responsibilities:

Responsible to construct and compile Bills of Material in an Access database for this architectural and landscape lighting manufacturer.

This consisted of building a large database of sub-assemblies, components, and raw materials from a dynamic consortium of suppliers for transformer and lighting assemblies.

Real-time vigilance of inventory levels, moderate purchasing and expediting.

Schedule testing of lighting assemblies to comply with EIA and Underwriters Laboratories specifications for renewal and implementation.

Understanding of Underwriters Laboratories specifications in regard to installation and material requirements for underwater lighting, allowed me to become an important reference as a subcontractor contact.

Magnetic Metals, INC., Anaheim, CA Oct 02 – Sep 03

Contract Hire

Responsibilities:

Multi-tasking was essential in this contract-temporary position where involved in Production Planning for this electronic transformer core manufacturer.

Constant interface with customer service to schedule various transformer production processes via A/S 400 and Metashop scheduler for all production phases from pre-planning, production set-up, tooling specifications, processing, testing and inspection.

As a production planter in this transformer core job shop, interface with the Plant Manager regularly for lead-time and availability of machining, forming, baking, set-up and material availability to avoid conflict or bottleneck at any stage of the manufacturing process.

This is achieved by issuing Work Orders / Manufacturing Tickets that initiate the manufacturing process and all production processes involved.

Consult with Quality Engineers to disposition rework/defective material and product rework.

Southern California Gas Co., Los Angeles, CA May 01 – Oct 02

Georgraphic services, Quality assurance

Responsibilities:

Performed quality assurance reviews of Gas Company Transmission and Distribution maps in concert with map drafting engineers.

Implementation of Geometric and Trigonometic principles for dimensioning in regard to placement of upgraded construction in relation to existing facilities/infrastructure.

Extensive use of Geographical Information Systems computer aided drafting techniques as they related to drafting of mapping principles.

Ensured that ‘As-Built’ installation modifications and upgrades to the various residential and distribution sites where implemented per CPUC guidelines as viable reference documentation.

This encompassed ready identification of gas main and supply pipeline material properties, pressure capacities, and protection devices.

Developed awareness of certain municipal public planning mandates in regard to rights of way of public and private property domains.

Assisted in design and implementation of an automated ‘Track-IT’ system that provides visibility of the status of a construction project to all entities of a construction project.

‘Track IT’ allowed all the concerned functions the ability to view the phase of a project on-line from kick-off to percentage complete.

This ‘heads-up’ tracking software was critical to on-time scheduling completion and resource allocation.

Federal Express Corporation, Los Angeles, CA Jan 96 – Apr 98

Field Service Technical Representative

Responsibilities:

Installed, troubleshoot, upgrade and maintain desktop computer systems, peripheral printers and scanners.

Maintenance and troubleshooting of company TCP/IP telecommunications systems, including multiplexers, modems, protocol converters, data/voice cabling.

Installed and maintained of workstations and Client/server LAN/WAN configurations, Cisco routers, switches, hubs, network Interface cards.

Provided level 1 and 2 tier technical help desk interface.

It is Incumbent for technicians to stay abreast of technical updates and implement them accordingly, eg beta updates and software roll-outs.



Contact this candidate