Resume
Josh Brooks
************@*****.***
Monroeville, Al. 36460
Electrician – NCCER Journeyman - Communication- Instrumentation- Solar - Control - Fiber
Certifications; First Aid, AED, CPR, Fork Lift, Signal, Confined Space Competent Person, Man Lifts up to 135 ft., Trac Hoe, Skid Steer, and most other equipment ; 10 hour OSHA, 10 Hour Electrical OSHA, H2S, Megger, and HIPOT
MMR
Microsoft Project Leesburg, Va.
02/20/2022- Previous
Supervisor
Previous Duties Included; Responsible for Daily Production, Time, Material, and the Safety of a Large Crew. Temp Power and Underground Utilities
GREAT Southwestern Construction (MYR)
Duke Energy Substation (Multiple Locations)
06/27/2021- 02/18/2022
Field Superintendent
Duties Included; Following Quality Standards to Ensure the Safety and Security of the Job Site, Planning Completion, Building and Maintaining up to 345KV Substations, Reporting to the PM, Filing, Spending Reports, Safety, Hiring, Setting Structures and Skids, Forming and Finishing Concrete, Installing Bus Bar/String Bus, Insulators, Transformers, Cooler, Switches, Breakers, Locating, Civil, Equipment Operating. All projects were completed safely and on time.
HADEN POWER
SDI(Steel Dynamics Inc.) Corpus Christi
Q/A Q/C.
03/12/2021 - 6/25/2021
Duties Include; Built a 345KV Substation, Reading Blue Prints, Stress Cones, Installing Bus, Installing and Terminating AC and DC panels, (Siemens) SVC Cabinets, Battery Chargers, 345KV Dirty Bus Differential and Tie Overcurrent Protection Cabinets, Lighting, HVAC, and Transformers.
WOOD (AMEC/FOSTER WHEELER)
YCI Chemical Plant St. James, LA. 05/12/2020- 03/05/2021
Duties Include; Supervisor, Permit Writer, Lock Out/Tag Out Coordinator
Previous Duties Included; Responsible for Daily Production, Time, Material, and the Safety of a Large Crew. Installed Rigid Conduit, Motors, NLP, ELP, UDP panels, Instrumentation, Reading Blue Prints, Cable Tray, Low to Medium Voltage(24V-15KV), Splicing, Start/Stop Switches, Hand Stations, Grounding. Responsible for Organizing, Interrupting, and Executing Day to Day Task. Each Task was Completed Safety and Efficiently.
MMR
Various Locations 05/17/2018 - 05/10/20
Florida Gas, Entergy, Irvin Paper, VT Halter Marine, Shintech, Sasol Chemical plant: Supervisor/Forman-
Previous Duties Included; Responsible for Daily Production, Time, Material, and Safety up to a Seventeen Man Crew. Rigid and Plasti Bond Conduit, 1HP-4500HP Motors, LP Panels, ELP Panels, PP Panels, UDP Panels, Instrumentation, Shooting Loops, Reading Blue Prints, 2”-36”Cable Tray, Low Voltage,15KV-35KV Voltage Stress Cones, Start/Stop Switches, Grounding. These Projects were Executed Safety and Efficiently.
G.A. West
Various Locations B.A.S.F., Kimberly Clark:
02/16/2018 – 5-15-2018
Previous Duties Include: Terminating Transformers, Switchgear, Panels, Motors, Low Voltage, DC/AC, Start/Stop Switch’s, and PLC Cabinets. 3/4”-2” Plasti Bond Conduit, 12”-36”Cable Tray, HVAC,Duct Bank, Grounding, Temporary Power and Instrumentation.
Summit Racing
Arlington, Tx.
11/17/2017 - 02/15/2018
Previous Duties Included; Maintenance on a Conveyor System which includes Motor, PLC/Controls, Belts, Bearings, alignments, Installing New Lighting and Receptacles, 1/2”-2” EMT Conduit as well as all other Maintanance that occurred. Maintaining a Clean and Safe Work Area. Ordering Material and Equipment. I was the only Electrician on Site.
R.A.I️.
Nissan Plant, Decherd, Tennessee,
Mission Food Plant, Arlington, Texas.
June 2017 - November 17,2017
Previous Duties Included; Added a Production Line at each Facility. It Required Maintaining a Safe and Clean Work Area, Terminating and Installing 2Hp-1500Hp Motors, Transformers and Switchgear. 480, 277, 120 AC, 24-48 DC Low Voltage, Siemens and Mitsubishi PLC, HVAC(Trane Units), Reading Blue Prints,, Installing Instruments, and Start/Stop Switches.
G.A. West
Williams Pipeline:
Wilkes Barre, Pa.
2015 – June 2017
Previous Duties Included; Built a 5625HP Compressor Station. It Required Terminating and Installing Transformers, Switchgear, Panels, Motors, 24v-480v Low Voltage, Start/Stop Switch’s, and PLC Cabinets. 3/4”-6” Conduit, 12”-36” Cable Tray, Instrumentation, Duct Bank, 3/4”-4” Rigid, IMC, and Plasti Bond Conduit, Grounding, and Temporary Power.
Jesco/Yates
Mobile, Al. Airbus
2015 -2015
Previous Duties Included: Terminating and Installing Transformers, Switchgear, AC and DC Panels,Motors, Low Voltage, Start/Stop Switch’s, Lighting, and PLC Cabinets. 1/2”-2” PVC and EMT Conduit, 12”-36” Cable Tray, Duct Bank, Grounding, and Temporary Power.
MMR
Dow Chemical Freeport Tx.
2014-2015
Dow Chemical
Previous Duties Included: Testing, Splicing, Terminating, and pulling Fiber Optic Wire. Punch Down Cat 5 and Cat 6. Lashing Cable on Power Lines. Operating Bucket
Truck and Man lifts.
G.A.West
Mobile, Al.
Williams Pipeline,Thyssen Krump, SSAB, Lenzing, Alter, Evonic, Ingals, International Paper, Alabama River Celulos, Ascend:
2011 – 2014
Previous Duties Included: Installing and Terminating Transformers, Switchgear,
AC and DC Panels, 2HP-1500HP Motors, Low Voltage, 115KV high Voltage, Start/Stop Switch’s, and PLC Cabinets. 3/4”-6” Conduit, 6”-36” Cable Tray, Duct Bank, Grounding, Temporary Power.
Jesco/ Yates
LSA Plant Thomasville, Al
2011 - 2011
Previous Duties Included: Building a Steel Mill; Installing and Terminating Transformers, Switchgear, Panels,
Motors, Low Voltage, DC/AC, Start/Stop Switch’s, Lighting, and PLC
Cabinets. 3/4”-4” Rigid and PVC Conduit, 12”-36” Cable Tray, Duct Bank, Grounding, Temporary Power.
ITS
Thomasville High School Thomasville, Al
2011 - 2011
Previous Duties Included: Demo and Replace all Lighting and Receptacles, Installed 480V Transformers and Panels, Fire alarm, Lighting, Low voltage.
MMR
Chevron Pascagoula, Miss
2011 - 2011
Previous Duties Included: Terminating Transformers, Switchgear, Panels,
Motors, Low Voltage, High Voltage, DC/AC, Start/Stop Switch’s, Lighting, and PLC
Cabinets. All size Conduit, Cable Tray, Duct Bank, Grounding, Temporary Power.
Tarrant Hydrolic
Thyssen Krupp Steel Mill Calvert, Al.
2011 - 2011
Foreman
Previous Duties Included: Responsible for Daily Production, Time, Material, and Safety for a Large Crew, Installing and Terminating Transformers, Switchgear, Panels,
Motors, Low Voltage, DC/AC, Start/Stop Switch’s, Lighting, and PLC
Cabinets. 3/4”-2” Rigid Conduit, 12”-36” Cable Tray, Grounding, Temporary Power.
KBR/ BE&K
Jackson, AL. 2010 - 2011
Previous Duties Included: Boise Cascade: Installing 3/4”-4” Plasti-bond Conduit, 12”-36”Cable Tray, Lighting. Terminating Motors and Panels.
Gaylor
Thyssen Krupp Steel Mill Calvert, AL.
2010 - 2010
Supervisor
Previous Duties Included: Responsible for a Large Crews Safty and Production on lines Two and Four in the HDGL Building. Daily
Safety Meetings, Time, and Meeting our Daily Production Criteria. The Project was Completed Safely and Efficiently.
Brooks Construction
Pensacola, Fl. 2004 – 2008
Previous Duties included: Owner/Operator. Commercial and Residential Electrical and Plumbing, Roofing, Fence Erection, All Non-Structural Carpentry. Estimating, Hiring, Licensing, Permits, Material, Equipment, and Completion.
G.A. West
Thyssen. Krupp Steel Mill, Inglas Ship Yard Calvert, AL., Pascagoula, Ms.
2009 - 2009
Previous Duties Included: Installing and Terminating Transformers, Switchgear, A/C and D/C Panels, Motors, Low Voltage, Start/Stop
Switch’s, Lighting, and PLC Cabinets. 3/4”-2”Conduit, 4”-30” Cable Tray, Duct Bank,
Grounding, Temporary Power.
TCSI
Melbourne, Fl. 2006-2009
Supervisor
Previous Duties Included: Responsible Installing and Terminating, Transformers, Switchgear, A/C and D/C Panels, Instruments, Motors, Low Voltage, Start/Stop Switch’s, Lighting, and PLC Cabinets. 1/2-2” EMT Conduit, 4”-24” Cable Tray, Duct Bank, Grounding, Temporary Power.
Barroco Electric
Pensacola, FL. 2003-2006
Previous Duties Included: Installing and Terminating Transformers, Switchgear, DC/AC Panels, Motors, Low Voltage, Start/Stop
Switch’s, Lighting, and PLC Cabinets. All 3/4”-2” Rigid Conduit, 12”-36” Cable Tray, Duct Bank,
Grounding, Temporary Power.
Armstrong Electric
Pensacola, FL. 2001-2003
Previous Duties Included: Installing and Terminating Transformers, Switchgear, A/C and D/C Panels, Motors, Low Voltage, Start/Stop Switch’s, Lighting, and PLC Cabinets. 3/4”-4” Rigid and PVC Conduit, 12”-30” Cable Tray, Duct Bank, Grounding, Temporary Power.
Smith Electric
Pensacola, FL. 2000-2001
Previous Duties Included: Residential, Commercial and Industrial: Helper
Lassiter Electric
Monroeville, AL. 1998-2000
Previous Duties Included: Commercial and Residential: Helper
Asberry Electric
Monroeville, AL. 1996-1998
Previous Duties Included: Commercial and Residential: Helper
I would like an opportunity to work with a company that could test my
capabilities and safe work ethics to which I can achieve productive work habits. I am very reliable and work hard daily to increase productivity. I am also extremely motivated to stay busy and perform to my highest capability.