Post Job Free

Resume

Sign in

Electrician NCCER Journeyman - Communication- Instrumentation- Sola

Location:
Monroeville, PA
Salary:
1
Posted:
March 30, 2023

Contact this candidate

Resume:

Resume

Josh Brooks

251-***-****

adv8pt@r.postjobfree.com

*** ****** ***.

Monroeville, Al. 36460

Electrician – NCCER Journeyman - Communication- Instrumentation- Solar - Control - Fiber

Certifications; First Aid, AED, CPR, Fork Lift, Signal, Confined Space Competent Person, Man Lifts up to 135 ft., Trac Hoe, Skid Steer, and most other equipment ; 10 hour OSHA, 10 Hour Electrical OSHA, H2S, Megger, and HIPOT

MMR

Microsoft Project Leesburg, Va.

02/20/2022- Previous

Supervisor

Previous Duties Included; Responsible for Daily Production, Time, Material, and the Safety of a Large Crew. Temp Power and Underground Utilities

GREAT Southwestern Construction (MYR)

Duke Energy Substation (Multiple Locations)

06/27/2021- 02/18/2022

Field Superintendent

Duties Included; Following Quality Standards to Ensure the Safety and Security of the Job Site, Planning Completion, Building and Maintaining up to 345KV Substations, Reporting to the PM, Filing, Spending Reports, Safety, Hiring, Setting Structures and Skids, Forming and Finishing Concrete, Installing Bus Bar/String Bus, Insulators, Transformers, Cooler, Switches, Breakers, Locating, Civil, Equipment Operating. All projects were completed safely and on time.

HADEN POWER

SDI(Steel Dynamics Inc.) Corpus Christi

Q/A Q/C.

03/12/2021 - 6/25/2021

Duties Include; Built a 345KV Substation, Reading Blue Prints, Stress Cones, Installing Bus, Installing and Terminating AC and DC panels, (Siemens) SVC Cabinets, Battery Chargers, 345KV Dirty Bus Differential and Tie Overcurrent Protection Cabinets, Lighting, HVAC, and Transformers.

WOOD (AMEC/FOSTER WHEELER)

YCI Chemical Plant St. James, LA. 05/12/2020- 03/05/2021

Duties Include; Supervisor, Permit Writer, Lock Out/Tag Out Coordinator

Previous Duties Included; Responsible for Daily Production, Time, Material, and the Safety of a Large Crew. Installed Rigid Conduit, Motors, NLP, ELP, UDP panels, Instrumentation, Reading Blue Prints, Cable Tray, Low to Medium Voltage(24V-15KV), Splicing, Start/Stop Switches, Hand Stations, Grounding. Responsible for Organizing, Interrupting, and Executing Day to Day Task. Each Task was Completed Safety and Efficiently.

MMR

Various Locations 05/17/2018 - 05/10/20

Florida Gas, Entergy, Irvin Paper, VT Halter Marine, Shintech, Sasol Chemical plant: Supervisor/Forman-

Previous Duties Included; Responsible for Daily Production, Time, Material, and Safety up to a Seventeen Man Crew. Rigid and Plasti Bond Conduit, 1HP-4500HP Motors, LP Panels, ELP Panels, PP Panels, UDP Panels, Instrumentation, Shooting Loops, Reading Blue Prints, 2”-36”Cable Tray, Low Voltage,15KV-35KV Voltage Stress Cones, Start/Stop Switches, Grounding. These Projects were Executed Safety and Efficiently.

G.A. West

Various Locations B.A.S.F., Kimberly Clark:

02/16/2018 – 5-15-2018

Previous Duties Include: Terminating Transformers, Switchgear, Panels, Motors, Low Voltage, DC/AC, Start/Stop Switch’s, and PLC Cabinets. 3/4”-2” Plasti Bond Conduit, 12”-36”Cable Tray, HVAC,Duct Bank, Grounding, Temporary Power and Instrumentation.

Summit Racing

Arlington, Tx.

11/17/2017 - 02/15/2018

Previous Duties Included; Maintenance on a Conveyor System which includes Motor, PLC/Controls, Belts, Bearings, alignments, Installing New Lighting and Receptacles, 1/2”-2” EMT Conduit as well as all other Maintanance that occurred. Maintaining a Clean and Safe Work Area. Ordering Material and Equipment. I was the only Electrician on Site.

R.A.I️.

Nissan Plant, Decherd, Tennessee,

Mission Food Plant, Arlington, Texas.

June 2017 - November 17,2017

Previous Duties Included; Added a Production Line at each Facility. It Required Maintaining a Safe and Clean Work Area, Terminating and Installing 2Hp-1500Hp Motors, Transformers and Switchgear. 480, 277, 120 AC, 24-48 DC Low Voltage, Siemens and Mitsubishi PLC, HVAC(Trane Units), Reading Blue Prints,, Installing Instruments, and Start/Stop Switches.

G.A. West

Williams Pipeline:

Wilkes Barre, Pa.

2015 – June 2017

Previous Duties Included; Built a 5625HP Compressor Station. It Required Terminating and Installing Transformers, Switchgear, Panels, Motors, 24v-480v Low Voltage, Start/Stop Switch’s, and PLC Cabinets. 3/4”-6” Conduit, 12”-36” Cable Tray, Instrumentation, Duct Bank, 3/4”-4” Rigid, IMC, and Plasti Bond Conduit, Grounding, and Temporary Power.

Jesco/Yates

Mobile, Al. Airbus

2015 -2015

Previous Duties Included: Terminating and Installing Transformers, Switchgear, AC and DC Panels,Motors, Low Voltage, Start/Stop Switch’s, Lighting, and PLC Cabinets. 1/2”-2” PVC and EMT Conduit, 12”-36” Cable Tray, Duct Bank, Grounding, and Temporary Power.

MMR

Dow Chemical Freeport Tx.

2014-2015

Dow Chemical

Previous Duties Included: Testing, Splicing, Terminating, and pulling Fiber Optic Wire. Punch Down Cat 5 and Cat 6. Lashing Cable on Power Lines. Operating Bucket

Truck and Man lifts.

G.A.West

Mobile, Al.

Williams Pipeline,Thyssen Krump, SSAB, Lenzing, Alter, Evonic, Ingals, International Paper, Alabama River Celulos, Ascend:

2011 – 2014

Previous Duties Included: Installing and Terminating Transformers, Switchgear,

AC and DC Panels, 2HP-1500HP Motors, Low Voltage, 115KV high Voltage, Start/Stop Switch’s, and PLC Cabinets. 3/4”-6” Conduit, 6”-36” Cable Tray, Duct Bank, Grounding, Temporary Power.

Jesco/ Yates

LSA Plant Thomasville, Al

2011 - 2011

Previous Duties Included: Building a Steel Mill; Installing and Terminating Transformers, Switchgear, Panels,

Motors, Low Voltage, DC/AC, Start/Stop Switch’s, Lighting, and PLC

Cabinets. 3/4”-4” Rigid and PVC Conduit, 12”-36” Cable Tray, Duct Bank, Grounding, Temporary Power.

ITS

Thomasville High School Thomasville, Al

2011 - 2011

Previous Duties Included: Demo and Replace all Lighting and Receptacles, Installed 480V Transformers and Panels, Fire alarm, Lighting, Low voltage.

MMR

Chevron Pascagoula, Miss

2011 - 2011

Previous Duties Included: Terminating Transformers, Switchgear, Panels,

Motors, Low Voltage, High Voltage, DC/AC, Start/Stop Switch’s, Lighting, and PLC

Cabinets. All size Conduit, Cable Tray, Duct Bank, Grounding, Temporary Power.

Tarrant Hydrolic

Thyssen Krupp Steel Mill Calvert, Al.

2011 - 2011

Foreman

Previous Duties Included: Responsible for Daily Production, Time, Material, and Safety for a Large Crew, Installing and Terminating Transformers, Switchgear, Panels,

Motors, Low Voltage, DC/AC, Start/Stop Switch’s, Lighting, and PLC

Cabinets. 3/4”-2” Rigid Conduit, 12”-36” Cable Tray, Grounding, Temporary Power.

KBR/ BE&K

Jackson, AL. 2010 - 2011

Previous Duties Included: Boise Cascade: Installing 3/4”-4” Plasti-bond Conduit, 12”-36”Cable Tray, Lighting. Terminating Motors and Panels.

Gaylor

Thyssen Krupp Steel Mill Calvert, AL.

2010 - 2010

Supervisor

Previous Duties Included: Responsible for a Large Crews Safty and Production on lines Two and Four in the HDGL Building. Daily

Safety Meetings, Time, and Meeting our Daily Production Criteria. The Project was Completed Safely and Efficiently.

Brooks Construction

Pensacola, Fl. 2004 – 2008

Previous Duties included: Owner/Operator. Commercial and Residential Electrical and Plumbing, Roofing, Fence Erection, All Non-Structural Carpentry. Estimating, Hiring, Licensing, Permits, Material, Equipment, and Completion.

G.A. West

Thyssen. Krupp Steel Mill, Inglas Ship Yard Calvert, AL., Pascagoula, Ms.

2009 - 2009

Previous Duties Included: Installing and Terminating Transformers, Switchgear, A/C and D/C Panels, Motors, Low Voltage, Start/Stop

Switch’s, Lighting, and PLC Cabinets. 3/4”-2”Conduit, 4”-30” Cable Tray, Duct Bank,

Grounding, Temporary Power.

TCSI

Melbourne, Fl. 2006-2009

Supervisor

Previous Duties Included: Responsible Installing and Terminating, Transformers, Switchgear, A/C and D/C Panels, Instruments, Motors, Low Voltage, Start/Stop Switch’s, Lighting, and PLC Cabinets. 1/2-2” EMT Conduit, 4”-24” Cable Tray, Duct Bank, Grounding, Temporary Power.

Barroco Electric

Pensacola, FL. 2003-2006

Previous Duties Included: Installing and Terminating Transformers, Switchgear, DC/AC Panels, Motors, Low Voltage, Start/Stop

Switch’s, Lighting, and PLC Cabinets. All 3/4”-2” Rigid Conduit, 12”-36” Cable Tray, Duct Bank,

Grounding, Temporary Power.

Armstrong Electric

Pensacola, FL. 2001-2003

Previous Duties Included: Installing and Terminating Transformers, Switchgear, A/C and D/C Panels, Motors, Low Voltage, Start/Stop Switch’s, Lighting, and PLC Cabinets. 3/4”-4” Rigid and PVC Conduit, 12”-30” Cable Tray, Duct Bank, Grounding, Temporary Power.

Smith Electric

Pensacola, FL. 2000-2001

Previous Duties Included: Residential, Commercial and Industrial: Helper

Lassiter Electric

Monroeville, AL. 1998-2000

Previous Duties Included: Commercial and Residential: Helper

Asberry Electric

Monroeville, AL. 1996-1998

Previous Duties Included: Commercial and Residential: Helper

I would like an opportunity to work with a company that could test my

capabilities and safe work ethics to which I can achieve productive work habits. I am very reliable and work hard daily to increase productivity. I am also extremely motivated to stay busy and perform to my highest capability.



Contact this candidate