Project Lead for new product development, product improvements and supply chain
process improvements through all the program phases. Control Account Manager for programs that sum over $1MM (Budget, forecast, EV) Schedule (IMS) and Rolling Action Item List coordinator for successful execution Hardware design and manufacturing process coordinator with supply chain/sub- contractors and Quality Assurance
Performance and Environmental tests coordinator per DO-160G and customer requirements, including Test Readiness Review
Safety of Flight Test coordinator and customer documentation submittal PDQA coordinator with Quality Assurance team
External customers effective communication and program/plan executive status Fault Tree, Root Cause and Corrective Actions coordination with cross-functional team Lead Design Reviews with Chief Engineers and Integrated Product Team Manage Hardware and Test Setup Conformities with QA Inspectors and FAA delegates Develop Test procedures and reports for customers
DFMEA/PFMEA coordinator with Quality Assurance and Manufacturing (ISC) team Flawless Launch & APQP tools (PPAP, PMAP, KC/CC, Pain Point Analysis, SPC-CpK/COV, Capacity Studies, Control Plan, Work Instructions, Risk Assessment) for ISC transitions Project Engineer for Mechanical Systems and Components and product transitions to Integrated Supply Chain (ISC)
Achievements:
Improved ISC manufacturing and test processes to reduce 25% field failures on existing products
$108K/year cost take out by replacing parts, suppliers and ISC manufacturability on existing mechanical components
Experience
Honeywell Aerospace November 2019 - February 2023
Advanced Project Engineer
Honeywell Aerospace July 2014- November 2019
Test Engineer
Test Lead for mechanical systems and components test programs that sum over $1M Work with external/internal test labs for environmental and performance tests estimates and execution
Test setup conformity inspections coordinator with FAA inspectors, TSOS and customer Engineering-Unit Member
Qualification Test Report submittal to customers
Integrated Master Schedule coordinator with IPT (Designers, Facility, Metrology and Technicians)
Project Management and Test Coordination based on AP-1152 standard, including projects in other US sites
Test stand and Mechanical/Electrical Interfaces design, fabrication and technical support coordinator
Control Account Manager for leading projects, including budget control Design Reviews coordination with Chief Engineer
Mentor to lower-level Engineers
Test Lead for Systems Integration Laboratory
Achievements:
From Jul/2014 to Nov/2019, 5 test programs successfully completed and test reports submitted to customers
From Jul/2014 to Nov/2019, saved an average of $121K/year while upgrading existing hardware and software available from previous programs Leadership
Project management
Cross-functional collaboration
Managing multiple projects
Analytical & problem solving skills
Risk analysis/assessment
New product development
Effective communication
Stakeholders and customer
engagement
JULIAN CONTRERAS
PROJECT ENGINEER
Contact
About Me
Skills
Phone
******************@*****.***
I’m an experienced Project
Engineer who loves the challenge of
developing technical knowledge, to
excel at my job and bring results to
the organization; by driving cross-
functional teams to develop and
launch products in complex
environments.
Education
Universidad Autónoma de
Baja California (2002-2007)
Bachelor in Electronic Engineering
CETYS Universidad (2017-2019)
Master in Engineering and Innovation
Address
24250 N 23rd Ave, Phoenix AZ,
85085
Masterwork Electronics August 2010- April 2014
Test Engineer
Root cause analysis and CPAR (8D) completion for production non-conforming and RMA assemblies
PPAP, PFMEA and Control plan completion for automotive and other products Workstation layout and line balancing, as well as approval of tools/equipment Gauge R&R for process validation
Technician supervisor, including trainings to operators on functionality for each product Remote communication with customers for updating/troubleshooting test equipment New Product Introduction projects, quotation and validation process to transfer to production line
Internal audits and feedback on every process for Quality improvements based on our daily metrics
Generate work instructions/procedures and apply ECO’s to the process Equipment, Fixtures and tools programmed/preventive maintenance Daily yield reports/charts, including feedback to responsible areas on non-conforming assemblies
Functional test leader, Technical support, Failure Analysis, Maintenance and Fixture design with the goal of reducing test times
Achievements:
From Jan/2013 to Mar/2014, 5 out of 5 CPAR’s were closed with no recurrences From Jan/2013 to Mar/2014, a total of 12 NPI’s were transferred to production test line meeting the required test times per customer’s requirement Experience