LUIS C MARIN
Mechanical Engineer
Houston TX ****4
Cell: 832-***-****
Cell: 832-***-****
*********@*****.***
SUMMARY
Diversified experience within the Petro-Chemical industry, including pressure vessel manufacturing, Green Card USA Holder available for Company Direct or Contract Assignments, Bilingual English, and Spanish.
Knowledge of ASME, API, TEMA and ANSI requirements, B31.1, B31.8 and valve inspections.
Design and Calculation of Pressure Vessels by ASME VIII Div1.
Use of software for pressure vessel/tower calculation - COMPRESS.
Design and Calculation of atmospheric tanks under (American Petroleum Institute) API Code 650
(American Petroleum Institute), and API-620.
Development of basic technical specification that defines the minimum requirements for the design, construction, inspection, testing, preparation, and shipment for mechanical equipment.
Request for quotation, bid tabulation of proposals and technical recommendation for mechanical equipment purchase.
Entry level AUTOCAD experience.
EDUCATION
Seminar of pressure Vessel Design / Hartford Steam Boiler - COMPRESS Pressure Vessel Design software.
(June-9-2007)
Bachelor of science/Mechanical Engineer – Fundación Universidad America (March-11-1988) English Diploma – English as a second language / Colombo – Americans institute (Dec-15-1979) High School Diploma / Exchange Student at Midland Michigan USA Herbert Henry Dow High School
(June-7-1978)
January 2017 – Present - NOBLE INSPECTIONS / TEKNACORP Quality Product Engineer
JOB DESCRIPTION AND WORK ACCOMPLISHED
Coordinate and accomplished materials site inspection supplied according to client specifications and international standards (API, ASTM, ASME) for pipeline, flanges, elbows, Tee.
- Witness and performing dimensional inspection, (API 5L, ASME B16.5, B16.9, B.16.47)
- Review Non-Destructive Testing (NDT) Report supplied by vendor to meet Client Technical Standards
- MTR - Material Test Report compliance evaluation to international standards, verify chemical and strength properties.
- Document and Physical Material Release per Purchase Order check quantities and technical compliance requirements per manufacture and design codes.
- Perform or approve ITP (inspection and Test Plans), from custom vendor fabrication parts. January – 2020/Client Bonatti- CUSTOMER: Puebla Fuel Storage Terminal A Mexico/ ROJECT/UNIT: TPP TRASVASE PROJECT
Material to be inspected: Description / Brand Amerex-Model-944: Quantity (4) Four units: Premixed Foam Station, 500 gal. Capacity. Carbon steel tank, 2 discharge outlets, 4 nitrogen cylinders, 250 PSI PSV pressure reliever. Scope of Inspections at BURNER-FIRE-CONSTRUCTION Supplier: JOB DESCRIPTION AND WORK ACCOMPLISHED
- Manufacturing progress monitoring and verification, Verify the progress in the production line for all Four (4) Units, also include photographic report.
- Revision of documents (Missing to be issued by BURNER-FIRE-CONSTRUCTION) March – 2018/Client Bonatti-Transportadora de Gas Natural de la Huasteca Material to be inspected: 48" ANSI 900 HORIZONTAL SENTRY Horizontal Hinge - Right Hand Design Code: ASME B31.8 Design Pressure: 2220 psi Design Temperature: -20 F to 250 F Corrosion Allowance: 0.000'' Materials of Construction:
Scope of Inspections at NOV (National Oilwell Varco) Supplier:
- Final Acceptance Test/Final Inspection
- Witness to Bonatti and TransCanada Magnetic Particle Testing
- Witness to Bonatti and TransCanada Seal Heads Testing JOB DESCRIPTION AND WORK ACCOMPLISHED
Closured Head is visually verified that the elements comply with the marks required by the Specification and what is requested in the Purchase Order; Casting, Purchase Order, Serial Numbers, Material Certifications, Size, Rating, Measurement, Design Conditions, Data Plate Dimensional Inspection: Dimensionally Verified obtaining satisfactory results. (S). Documentary Inspection: Certificates comply in accordance with the specific standard required in the purchase order, traceability of Casting, Origin, Manufacturer, Dimensions, Steel Grade, Exams, Mechanics and Chemicals is verified.
Seal and Magnetic Particle Test: Seal Test procedure is verified with satisfactory results, grease applied around the gasket installed in the Door marks on the entire periphery of the fixed face that will be joined to the pipe. With the magnetic particle test, welds and materials of the finished part were checked.
February – 2018/Client Bonatti-Transportadora de Gas Natural de la Huasteca/Vandor EN- FAB, Inc.
Material to be inspected: One (1) EN-FAB, Inc. Gas Fired Indirect Water Bath Heater, as per attached En- Fab standard P&ID drawing, sized 108" OD x 34’ -6" long x 1/2" wall thickness, designed with heat absorbed duty of 10.33 MMBTU/Hr, mounted on welded carbon steel saddles. Scope of Inspections at EN-FAB Supplier:
- Final Acceptance Test/Final Inspection
JOB DESCRIPTION AND WORK ACCOMPLISHED
Each of the commands indicated in the test document was cold tested. Visual, Documentary, January – 2018/Client Bonatti- MX0204 SDTT Los Higueros Tamiahua - PO 17000540 NOV End Closures (QTY 3 Units)
- End Closures Diameter inspected 42” x 600#, 48” x 600#, 48” x 900# JOB DESCRIPTION AND WORK ACCOMPLISHED
- Follow up fabrication schedule status for stage, raw material NDT Testing /MTR verification machining process, photographic project report, confirm vendor forecast for final delivery to job site. Components Dimensional and tolerance inspected for assembly, (HUB), Door, Locking Ring February – 2018/Client Bonatti- CUSTOMER: MX0005: RV: TVDR: PO 17000509 - QUARTER TURN RF Assembly valve + actuator + extension
TVDR - PO 17000509 - QTR - Functional Test (QTY-12 Units) Scope of Inspections at QUARTERTURN Supplier – VALVETALIA 36" 600 WE (.750) JOB DESCRIPTION AND WORK ACCOMPLISHED
- Revision of documents (Missing to be issued by QTR)
- Verify the progress in the production line for all 12 twelve the valves also include photographic report.
- Verify the fulfillment of the fabrication Schedule.
- Witness Torque application assembly
- Witness Hydrostatic & Pneumatic Test
- Witness Actuator Functional Test / Operation Test. January – 2017/Client Bonatti-Sur the Texas TUXPAN Pipeline Project (QTY – 20 Units) JOB DESCRIPTION AND WORK ACCOMPLISHED
- Review Report supplied by vendor / Certificate of Compliance to meet Client Technical Standards, Physical inspections for High- and Low-Pressure Gauges Pressure Type: Dial: diameter 4.5", color: white with black numbers, case: phenol, ring: screwed, blow-out protection: back, lens: glass (shatterproof), nominal accuracy required: 0.5 % full scale, press element: bourdon, element Mtl: steel 316SS, socket Mtl: steel 316SS, process connection 1/2" NPT bottom, movement: SS
Previous Jobs Experience in United States as a Mechanical Engineer: S&B Engineers and Constructors April 2015 – April 2016 Mechanical Engineer (Level MS5-Mechancial Specialist 5) JOB DESCRIPTION AND WORK ACCOMPLISHED
Performs Mechanical Design activities for all phases of mechanical development and equipment design, performing all conventional aspects of Mechanical or Piping Design and application of independent judgment for the evaluation, adaptation, and modification for Static Equipment. Project: Marathon Petroleum Corporation – (Galveston Bay Refinery) – ASME Pressure Vessel Validation
Verification of engineering modification, alteration, repair and rerate of existing ASME pressure Vessel, Fitness for Service calculation for high pressure tanks conforming with the latest requirement and regulations per OSHA and ASME code. Worley Parsons 01 - Jan 2015 – April -2015
Refinería del Pacífico (RDP) – Refinery and Petrochemical Complex of the Ecuadorian Pacific Project, Manabi, Ecuador.
Mechanical Engineer (Static Equipment Principal Engineer) JOB DESCRIPTION AND WORK ACCOMPLISHED
Periodic evaluation of work done by less experienced engineers or specialists is required (Total Engineer under evaluation and guideline 3). Assignments require knowledge and understanding of Project Management requirements including staffing and scheduling. Refinería del Pacífico (RDP) – Refinery and Petrochemical Complex of the Ecuadorian Pacific Project, Manabi, Ecuador PHASE -1 The scope of the facilities involves the construction of a Updated capacity 200,000 BPSD refinery and implementation of process units with deep conversion technology required for the production of gasoline, distillates, for the FEED stage. Worley Parsons 23 - Aug 2013 – 30 Dec 2014
CELANESE – Fairway Project, Houston, TX. Clear Lake 3700 MTPD Methanol Plant. JOB DESCRIPTION AND WORK ACCOMPLISHED
In charge of develop Request of Purchase, develop Data Sheets for pressure vessels carbon Steel, Stainless Steel and Cladded Type, bid tabulation, ER (responsible engineer) for pressure vessel static equipment purchase orders, verification of vendor documents and coordination with other disciplines for equipment fabrication.
Worley Parsons 23 - Jan 2012 – Aug 20, 2013,
Refinería del Pacífico (RDP) – Refinery and Petrochemical Complex of the Ecuadorian Pacific Project, Manabi, Ecuador.
JOB DESCRIPTION AND WORK ACCOMPLISHED
Responsible for evaluation of the basic engineering and specifications generated by South Korean engineering company for the Refineria del Pacifico to assess the technical Project involves refinery and petrochemical plant to satisfy the Ecuadorian market demand for fuel and export the surplus to strategic markets. The scope of the facilities involves the construction of a 300,000 BPSD refinery and implementation of process units with deep conversion technology required to produce gasoline, distillates, LPG, and petrochemical bases, including associated facilities. adequacy and consistency between documents and project specifications. S&B Engineers and Constructors 23 May 2011 – Jan 15, 2012 Project: BP – TCR (Texas City Refinery) – ASME Pressure Vessel Validation Mechanical Engineer (Level MS5-Mechancial Specialist 5) JOB DESCRIPTION AND WORK ACCOMPLISHED
Performs Mechanical Design activities for all phases of mechanical development and equipment design, performing all conventional aspects of Mechanical or Piping Design and application of independent judgment for the evaluation, adaptation, and modification for Static Equipment. Verification of engineering modification, alteration, repair and rerate of existing ASME pressure Vessel, Fitness for Service calculation for high pressure tanks conforming with the latest requirement and regulations per OSHA and ASME code REF-CHEM Pasadena, TX 6 - Oct. 2006 – 10 January 2010 Mechanical Engineer (Static Equipment Engineer)
Performs Mechanical Design Calculation, mechanical development, and equipment design, Under the guile line of a Senior Mechanical Engineer.
JOB DESCRIPTION AND WORK ACCOMPLISHED
Projects: Patriot Operating Company, LLC – COATING PLANT, Sibley LA Request for quotation of Process pumps and Specialty items (Flex hoses, safety showers, “Y” Strainers, Temporary Strainers, adaptors, Double Check Detector Assembly). Projects: AIR PRODUCTS - ACID RECOVERY PLANT PASADENA TX Dec 2007 – June 2009 Request for quotation of Pressure Vessels and pumps, bid tabulation of proposals and technical recommendation for mechanical equipment.
Projects: VALERO *DEMOLITION BIDS COOLING Nov 2007 - Dec 2007 Elaboration of the basic estimate for engineering and evaluation of pump proposals Projects: PASADENA REFINERING SYSTEM, INC - 60392 - DEMOLITION BIDS Jun 2007 - Nov 2007
Bid tabulation, and evaluation of different proposal for the DEMOLITION OF PASADENA PULP PLANT AND PAPER. Bid recommendation and clarifications control. Projects: PENNZOIL - ETHYL BLEND HOUSTON PLANT Oct 2006 – Dec 2006 Development the GENERAL MATERIAL TRACKING data base, for the materials to be purchased By REF-CHEM, indicating specifications for each item, TAG, Technical description, source P&ID, quantities required, line location.