Post Job Free

Resume

Sign in

Equipment Operator Construction Jobs

Location:
Hollywood, FL
Posted:
March 27, 2023

Contact this candidate

Resume:

Statement of Qualifications

Paul Kaczkin

I have over 30 years’ experience in the heavy construction industry, as well as extensive field experience and managerial skills in all phases of construction.

My job positions have been using these honed skills:

•Site Supervisor

•Estimating

•Heavy equipment operator

•Computer Skills / MS Word/ Excel / MS Project

•Proficient Carpenter

•40-hour Hazmat Supervisory Certifications

You will note in the attached timeline of my work that my experience supports these heavy construction jobs:

•Highway roads and bridges– new or refurbish

•Concrete forms and structures and paving

•Pile-driving and sheeting

•Line and grade

•Pump stations (sewer / water treatment)

•Large pipe utility work – water and sewer

•Commercial buildings and enclosures

Including but not limited to:

•Develop, maintain, and enforce all project site logistics plan and temporary facilities plan.

•Assure implementation and continuous maintenance of corporate safety program requirements in day-to-day operations on all projects.

•Confirm all required paperwork from subcontractors and suppliers is completed on timely basis throughout project.

•Communicate with all suppliers and subcontractors to be certain they understand performance standards related to predetermined schedules or plans and specifications.

•Serves as liaison with labor representatives and community where project is being performed.

•Manage and process submittals for review by owners for their approval and returned to subcontractor, as well as manage the process by which all additional cost are received.

Career Timeline

Paul Kaczkin

973-***-****

Highlights:

03/16 to Current:

Raised Infrastructure in Jersey City which included Watermain tie-in to existing lines, Installation of storm drain, catch basins and Sanitary lines, Extensive dewatering and sheeting. $ 300,000.00

Ripped out existing sidewalks and parking areas for Bank of America in Newark to facilitate new federal ADA mandates. $ 38,000.00 (Gregor Industries.)

Constructed concrete foundation 30 x 230 ft building in Wharton NJ, including installation of all storm drain, water main and sewer lines, as well installation of wet tap crossing of, county road. $ 250,000.00 (West Essex Joe Bonanno)

Provided location and installation of deep 16 x 6 Wet tap for future connections to a future facility in Sayreville, NJ. $ 35,000.00 (West Essex Joe Bonanno)

08/13 to 12/15

•Provided estimating services for wastewater and freshwater treatment plants as well as various large-scale Housing and Condo sites. (DMR Construction) Contract based mgt.

•Supervised all labor as well as overseeing all coordination site work for two 5000 sf. homes at two different locations which included operating heavy equipment, installation of septic fields, installed 8000 sf mass rubble walls as well as 4000 sf of Keystone retaining walls, all driveways, and street hookups.

08/12 - 08/13 Site Work and Foundation:

•Excavate and establish grade for entire site distributing 15,000 cy soil.

•Layout and excavate foundation for Two 30,000 sf. warehouses

•Layout and Install 800 lf. forms for footings and install concrete for each

•Install 4000 lf. storm drain. (West Essex Joe Bonanno) $300,000.00

11/11- 08/12 Constructed 4000 sf. home in lake community.

$500,000.00 Privet owner $ 340,000.00

•Install foundation into 20 % rock slope which included hand drilling and cracking

•Framed and sided entire house which was comprised of 4 levels

•Installed finish interior and exterior door and window components

09/2011- 11/2011 Passaic Valley Sewer Commissioners (Public 375,000)

•Demolished two 25 ft high, by 125 ft diameter tanks with 10 ft concrete interior fill.

2008-2010: Caldwell Wastewater Treatment Plant Upgrades (Public $11,350,000)

Position: Project Management / Superintendent / Estimator

(Contract based mgt.) Maple Construction

•Installed 700 lf. 42 In Dia. Ductile Iron Bypass pipe as well as 3000 Lf. yard pipe

•Constructed Concrete Grit Chamber and Headwork’s Building

•Sewage Pumps and instrumentation

•Buy-out & Procurement

•Reconstruct and decommission digesters /Remove Sludge & Grit

2006-2008:

•Personal family obligations due to mother’s illness and passing

•Downturn in construction business.

2004-2006: Site Prep Infrastructure – various sites (Private $8,000,000)

Position: Superintendent, Field Manager, (Contract based mgt.)

•600 car parking lot including all Bulk Heads, Docks, and Piers

•Low-income housing Infrastructure and utilities

•Privet development roads … grading … foundation prep….

2003-2004: Satellite Monitoring Systems (Public $7,000,000)

Position: Project Manager / Superintendent (Brocon Petroleum)

Job Description: Installation of Satellite Monitoring Systems which encompassed seven sites at various Passaic Valley Sewer Commissioners’ locations

•Cofferdams

•Deep wells

•Instrumentation

•Sewage pumps

•Building enclosures

•Extensive dewatering

1994-2002: Subcontract- West Point Stony Lonesome Housing Project (Public)

Position: (Owned and operated site utility company) 2,500,000

•Installed 30,000 feet various pipe

•Blasted and crushed 400,000 CY. rock

•Crushed rock material used to facilitate 40-foot fills

•Completed 40,000 sq. ft of Geo-Grid retaining walls

1991-1994: Owned and operated small excavating company (various sites)

•West Hill Road Boonton Twp. 3000 ft Road / Including all infrastructure

•Independence Twp. 5000 ft road / Including all infrastructure. Sunny Hill Road, Rockaway Including all infrastructure NJ / Pasha Court Rockaway NJ Including all infrastructure

I may be contacted at 973-***-**** if you wish to discuss references regarding my work experience.



Contact this candidate