Curriculum Vitae
PERSONAL INFORMATION
Surname KABDI
First Name: Mohamed Elhadi
Address: City silis Duplex D14
Ouargla 30000
Algeria
Tel. No. 002**-**-***-***
Mobile No 021*-***-***-***
E-mail: ********@*******.***
Date of Birth: July 26 1979
Place of Birth: Ouargla, Algeria
Nationality: Algerian
Marital Status: Married + 02 Children
Military Service: Clear
OBJECTIVE
Seeking a challenging position as Quality Engineer or Civil Engineer that offers a good opportunity for career development and professional enrichment.
EDUCATION / QUALIFICATIONS
1996-2001 Civil Engineering (Civil and Industrial Construction Option CCI),
University of Science and Technology Houyi Boumediene USTHB
2006-2008 mastery of dynamic structural University of ORAN
June 1996 Electronics Baccalaureate, Ouargla, Algeria
March 2011 Certified from OSHA center for completion satisfaction for construction industry
March 2012 Certified Auditor BS OHSAS 18001 VERSION 2007
Auditor certified 9001 2008 Management Quality
AUDIT REPORT QUALITY EXECUTION OF CIVIL WORKS AND STEEL STRUCTURE
WORK EXPERIENCE
Dec 2019 - to this day Construction Supervisor for CEPSA
RKF FIELD RE-DEVLOPMENT TENTATIVE Construction of drilling locations, roads, Logistics support facilities, etc.
Technical office engineer r for RKFSH CEPSA
To carry out the study and follow-up of temporary works for the construction site (laboratory, gas station, clinic, fake septic and WC, tanks, guard posts, massive concrete plant with capacity 100m3 / Of the life base ...
Octo 2018 – Dec 2019 QA/QC MANAGER QUALITY CONTROL FOR SARPI
satellite project realization of pipe rack and manifold and pipe line
Check mass excavations to ensure project trim (long profile and cross section).
- Check the compatibility of embankments by plate and gamma densimeter tests
- Implementation and follow-up of platform preparations
- Inspection of works (reinforcement, formwork, assembly, drilling ...).
- Control of concrete and multiplied the tests of conveniences.
- Ensure the application of procedures and ITPs.
- Coordination between the construction site, the design office and the owner of the structure.
- Topographic survey (As-built)
- Preparation of advancements and attachments of works and control of execution of the weekly & monthly schedules.
24/04/2016 to 30/10/2017 project manager at the National Agency for Housing Improvement and Development AADL OUARGLA
Control of the various tasks of the works
Aug 2013- Mar 2016 Construction Supervisor for CEPSA
- Rhourde er Rouni II Exploration phase – Construction of drilling locations, roads, Logistics support facilities, etc.
To carry out the study and follow-up of temporary works for the construction site (laboratory, gas station, clinic, fake septic and WC, tanks, guard posts, massive concrete plant with capacity 100m3 / Of the life base ... ..).
- Check mass excavations to ensure project trim (long profile and cross section).
- Check the compatibility of embankments by plate and gamma densimeter tests
- Implementation and follow-up of platform preparations
- Inspection of works (reinforcement, formwork, assembly, drilling ...).
- Control of concrete and multiplied the tests of conveniences.
- Ensure the application of procedures and ITPs.
- Coordination between the construction site, the design office and the owner of the structure.
- Topographic survey (As-built)
- Preparation of advancements and attachments of works and control of execution of the weekly & monthly schedules.
Apr 2011 - July 213 QA/QC MANAGER QUALITY - INSALAH GAS - SOUTHERN FIELD DEVELOPMENT PROJECT
Coordinate with civil departments in matters related to inspection
- Implementation of inspection and test plan including witness and
hold points
- Completing and close out of Requested Inspection reports.
- Inspection of earthworks including compaction tests and
materials
- Inspection of reinforcing rebar including embedded plates.
- Inspection of concrete works including checking sampling
process and testing
- Checking compression test results and curing process of
structural concrete
- Conducting final inspection of structural Concrete
- Familiarity with applicable code requirements (ACI Code and ASTM, ASME).
- Looking after all pipe line civil works ( 32’’, 42’’ and 13% chrome)
- Covering all the inspections related to pipe line construction
steps starting from :
- Survey works
- Grading of ROW.
- Stringing
- Trenches Excavation
- Pre-padding
- Lowering of pipe.
- Post-padding, FOC laying
- Backfilling of the trenches.
- Pre-pour and pouring of different size of Bloc Valves & Solar
panels and Anchor blocs.
- Pre-pour and pouring of concrete pipe coating for cross wed.
- Check the conformity of the holiday test with the designed
inspected pipe.
- Witness the Road inspections related to the Construction roads
cross the pipe line (Compaction test, CBR, Clegg hammer…etc).
- Monitoring all the Lab test regarding the analysis of the Borrow
pits
Sep 2009 – Mar 2011 QA/QC Engineer CSSI PROJECT, assurance of ISO 9001 version 2008 certification and management. AUDIT REPORT QUALITY EXECUTION OF CIVIL WORKS AND STEEL STRUCTURE
Monitor and assure the technical quality of construction
- Performs inspections of various installation activities for adherence
to Specifications and procedures.
- Generate reports of conditions found during inspection activities.
- Notifies the quality management of significant problems and reports
non-conforming items.
- Completes documentation to attest to satisfactory completion of
inspection and test activities.
- Interprets standards, specifications and drawings, as needed.
- Assist with documentation and data assembly for hand over
package.
Sep 2008 – Aug 2009 Engineering Technical assistant for project MEDGAZ GAS COMPRESSION station
Development of the base of life.
- Follow-up of the studies (user safety, control of project costs, respect of deadlines for studies and realization).
- Coordination between the engineering team and the construction team.
- Clarification and request for modification of plans.
- Preparation of sketches for site engineers.
- Receipt of inking rods and mechanical equipment in containers.
- Configure lists of the Update plans (revisions).
- Writing of daily, weekly and monthly reports.
Dec 2006 – Aug 2008 Quality Control Engineer - DSI International Gmbh 42km canal. Proposed Transfer sewage system from the city of Ouargla to the discharge area. Construction of 2 reinforced concrete channels and operation station.
Control of the different tasks of the works.
Control of formwork quality and reinforcement.
Quality control of the concrete delivered by the concrete plant.
Control of the quality of the concrete prepared on site by the subcontractors.
Ensure the quality of work execution.
Ensure that all rules and techniques of art are respected by the
Companies and subcontractors.
Preparation of final files for the various works and engineering works
civil.
Mar 2006 – Nov 2006 Technical supervisor for BONATTI. 20Km pipeline project - Welding and bleeding control of the pipeline between CIS and NIC HMD).
Conducting final inspection of structural Concrete
- Familiarity with applicable code requirements (ACI Code and ASTM, ASME).
- Looking after all pipe line civil works (16’and20’’)
- Covering all the inspections related to pipe line construction
Nov 2005 – Feb 2006 Technical assistant for BONATTI. Project - Fire and tank storage, platforms for pump station and the high duty pipeline.
Control of the different tasks of the works.
Control of formwork quality and reinforcement.
Quality control of the concrete delivered by the concrete plant.
Control of the quality of the concrete prepared on site by the subcontractors.
Ensure the quality of work execution.
Ensure that all rules and techniques of art are respected by the
Companies and subcontractors.
Preparation of final files for the various works and engineering works
civil.
May 2003 – Dec 2004 Civils supervisor monitoring Sarl BATISEURS the SOUTH - Completion of drilling locations. Monitor the disposition of all issued nonconformance reports.
• Control all achieve documentation upon the completion of the project.
• Review all special inspection and material testing perform by third parties.
• Arrange timely inspection and approval of all material/ equipment delivered / completed.
• Work to the Quality Engineers/inspectors on the project.
• Maintain controls on all the QA/QC related documentation and records.
• Check the Subcontractors Q.C. procedures to ensure they are consistent with client Q.C. procedure.
• Perform internal audits on subcontractor to personnel, to ensure they are working in compliance with
their approved working procedures.
• Manage the NCR issue and follow-up corrective actions to preclude internal.
• Ensure all necessary Quality construction records such as inspection and test documentation are filed and
maintained properly.
• Create, read, interpret and implement specifications, quality standards, work instruction and regulations.
2001 –2003 Internship at the research department of SET SOUTH monitoring and volume calculation.
To work in a multinational companies is a good opportunity to exchange a culture, experience, acknowledge between different nationalities, So even I have more than 17 years Experience in OIL & Gas and Power plant projects always am getting new lessons and learning new methods from a project to another,My target is to build a strong experience in the construction & Quality discipline during my carrier and I hope to transfer my know-how to a future colleagues or subcontractors as much as I can .
OTHER SKILLS
Languages: English: fairly good written and oral
French: Good written and oral
Arabic: Mother language
Others: Computer literate in Microsoft Office: Outlook, Word, Excel, Power Point ; AutoCAD
Driving License Category B (Light Vehicles)
Other interests and activities: Traveling, swimming and playing football.