ALI ABDEL GHANI
Construction Manager
OBJECTIVE
To obtain a challenging position in a professional environment, whereby I can enhance my knowledge and gain more practical experience needed for my career path.
Furthermore, to be part of a working team that is motivated and driven through achievements of realistic and measurable objectives. I have skills and competences to work through a team since I believe in the spirit of teamwork. Thus, I believe in coordination, cooperation& support and effective assistance concepts.
CONTACT
PHONE:
EMAIL:
adv1ai@r.postjobfree.com
AREA OF EXPERTISE
- Site control
- Exceptional performance under pressure
- leader at site
- Good communicating skills with consultants and clients.
- Good in AutoCAD
- I can achieve the targets within the time frame.
- Planning and delivering results
- ordering material as per approved shop-drawings.
- Following and pushing for material deliveries to site.
- Discuss and change design with design manager and consultants based on site conditions.
- Following with office and paper works to expedite INR and commercial papers.
- Study implement and coordinate with HSE and site team for the flow of work.
- Implementing Traffic diversions with HSE team.
EDUCATION
Beirut Arab University
2008 - 2013
Bachelor degree in Civil engineering.
National Evangelic Institute for Girls and Boys
2005 - 2008
Baccalaureate in General Science
WORK EXPERIENCE
(July 2021 – Present) BOOM CONSTRUCTION CO. In Qatar: Beautification of central Doha project:
Infrastructure project consisting of, Traffic signals, Water, TSE. SWD
(+ chambers and manholes) and road works
Electrical ducts (street light ducts, DSSS ducts and chambers, q-tel, UGN
and chambers)
Project client: Ashgal
Position: Senior Engineer, Construction Manager
Main contractor: boom construction company
Consultant: Parsons
Regarding our work in this project (Beautification of central
Doha):
1.infrastructure:
a.storm water lines and manholes
b.Foul water lines and manholes
c.Water lines, chamber, fittings and shutdowns
d.TSE (treatment sewer effluent) lines, manholes and
shutdowns
e.Including all kind of pipes (HDPE, DI, VC, GRP and
concrete pipes)
f.Qtel lines and chambers
g.UGN, traffic signals, and DSSS
h.Electrical ducts (EN6, type H, street lightings)
i.All kind of ducts from excavation till finishing
(pipes laying, concrete surround, manholes
construction, installation also street light foundations)
j.Irrigation work and landscaping.
2.Road works:
a.Backfill and compaction for road layers
b.Subbase works
c.Road diversions
d.Asphalt works (including tie in of diversion on existing live road) and concrete barriers
Aco drain, curbstone (concrete and granite interlock
3.Office works:
a.Paper works (INR, MIR, MAR) following with
QA/QC on recent submission and re-submission
of INR’s to get them Code A
b.Cooperating with QS and commercial team to expedite
the invoices submission.
c.Negotiating with consultant managers about
commercial invoices and site instructions and how was work executed to preserve our commercial rights.
(October 2018 – July 2021) BOOM CONSTRUCTION CO. In Qatar: Aring project:
Infrastructure project consisting of, Traffic signals, Water, TSE. SWD
(+ chambers and manholes) and road works
Electrical ducts (street light ducts, DSSS ducts and chambers, q-tel, UGN
and chambers)
Project client: Ashgal
Position: Senior Engineer
Main contractor: boom construction company
Consultant: ITAl consult
Regarding our work in this project (Aring road):
1.infrastructure:
a.storm water lines and manholes
b.Foul water lines and manholes
c.Water lines, chamber, fittings and shutdowns
d.TSE (treatment sewer effluent) lines, manholes and
shutdowns
e.Including all kind of pipes (HDPE, DI, VC, concrete pipes)
f.Qtel lines and chambers
g.UGN, traffic signals, and DSSS
h.Electrical ducts (EN6, type H, street lightings)
i.All kind of ducts from excavation till finishing
(pipes laying, concrete surround, manhole construction,
installation also street light foundations)
j.Irrigations work and landscaping.
2.Road works:
a.Backfill and compaction for road layers
b.Subbase works
c.Road diversions
d.Asphalt works (including tie in of diversion on existing live road) and concrete barriers
e.Aco drain, curbstone (concrete and granite interlock)
(April/10/2014 – 2018) BOOM CONSTRUCTION CO. In Qatar: Lusail express way project:
Infrastructure project consisting of Bridges, underpasses, Traffic signals,
Water, TSE. SWD (+ chambers and manholes) and road works
Electrical ducts (street light ducts, DSSS ducts and chambers, q-tel, Vodafone ducts and chambers)
Project client: Ashgal
Position: Site Engineer
Main contractor: Hyundai
Consultant: CDM smith
Regarding our work in this project (Lusail express way):
1.infrastructure:
a.storm water lines and manholes
b.Foul water lines and manholes
c.Water lines, chamber, fittings and shutdowns
d.TSE (treatment sewer effluent) lines, manholes and
e.shutdowns
f.Including all kind of pipes (HDPE, DI, VC, concrete pipes)
g.Vodafone and Qtel lines and chambers
h.ITS, traffic signals, and DSSS
i.Electrical ducts (EN6, type H, street lightings)
j.All kind of ducts from excavation till finishing
(pipes laying, concrete surround, manholes
construction, installation also street light foundations)
2.Road works:
a.Backfill and compaction for road layers
b.Subbase works
c.Road diversions
d.Asphalt works (including tie in of diversion on existing life road) and concrete barriers
e.Aco drain, curbstone (concrete and granite interlock)
SKILLS
1)Computer skills: Microsoft Office (Power Point, Word and Excel), AutoCAD.
Soft skills: Specialties management skills, Leadership, highly organized,
Team leader, Presentation skills, Tendering, strong relationship with
Clients and consultants, Able to learn quickly and work any other
profession beside my basic one
REFERENCES
John Karam (Project Director in Boom Construction Company)
adv1ai@r.postjobfree.com
Ali Banjak (Senior Project Manager in Boom Construction Company)
adv1ai@r.postjobfree.com
Ehssan Sharaf el Din (Senior Design Manager in Boom Construction Company)
adv1ai@r.postjobfree.com
LANGUAGES
-Arabic (Native Language)
-English (Spoken, Written & Listening)