BERNARD M. AGDA
# *** ******* **. *** ****** Diliman Quezon City
Mobile: 094********
Email Address: ***********@*****.***
PERSONAL BACKGROUND:
AGE : 42 Years Old
BIRTHDAY : March 27, 1980
BIRTH PLACE : Lawigan Tubay Agusan Del Norte
CIVIL STATUS : Married
SPOUSE : Editha P. Agda
RELIGION : Catholic
EDUCATIONAL BACKGROUND
SECONDARY EDUCATION
1995 – 1998 Tinigbasan National High school
Tinigbasan Agusan Del Norte
Elementary
1988 - 1993 Lawigan Elementary School
BUILDING ELECTRICIAN
WORK EXPERIENCE
DURATION : February 18, 2019 – February 23, 2020
COMPANY : Anel Emirates General Contracting LLC
POSITION : ELECTRICIAN
PROJECT : ABU DHABI INTERNATIONAL AIRPORT
JOB DESCRIPTION
1.Responsible in any electrical works and equipment troubleshooting.
2.Responsible in electrical installations, maintenance and repair works.
3.Perform other related tasks as required by management.
4.Assemble and prepare circuits and components.
5.Identify and effectively troubleshoots hazards, malfunctions and defects.
6.Set up electrical wiring, often includes networks and connections.
7.Able to read and interpret electrical diagrams.
8.Cable and pipe laying and other roughing in works.
9.Good workmanship specially for control wiring and panel works.
10.Good house keeping mindset specially for tools and equipment.
DURATION : April 24, 2012 – June 16, 2014
COMPANY : AL HASOUN SEJONG ELECTRO MECHANICAL EST.
POSITION : Electrician
PROJECT : Ruwais Refinery Expansion Project Package #2
Al Ruwais Abu Dhabi U.A.E
MAIN CONTRACTOR: GS ENGINEERING AND CONSTRUCTION CORP.
DURATION : October 29, 2014 – February 28, 2017
COMPANY : HYUNDAI
POSITION : ELECTRICIAN
PROJECT : Kuwait Oil Company KOC1 Pipe Line
JOB DESCRIPTION
1.Installation of cable tray and lighting support.
2.Termination of cable and lighting panel.
3.Termination and troubleshooting of electrical problems.
4.Low voltage cable and control cable pilling.
5.Perform layout and wiring installation.
6.Installation of lighting fixtures and circuit breakers.
DURATION : February 10, 2009 – February 2011
COMPANY : Geostar Philippine Incorporation
POSITION : ELECTRICIAN
PROJECT : Egle Cement Corp. at Barangay Akle San Ildefonso Bulacan
JOB DISCRIPTION
1.Installation of lighting fixture and termination of all wiring devices.
2.Layout and expose layout of PVC, RSC, IMC, PIPE and box setting.
3.Installation of cable trays.
4.Low voltage cable and control cable pulling.
DURATION : May 12, 2008 – March 28, 2009
COMPANY : AV Garcia Power System Corp.
POSITION : ELECTRICIAN
PROJECT : CDO Toll Packing Plant p3 Brgy. Bulihan Malvar Batangas
JOB DISCRIPTION
1.Layout and wiring of lighting such us three way and four way.
2.Wiring of fire alarm and smoke detector/
3.Responsible to energize panels and its load circuit.
4.Performs troubleshooting, live wire testing of panels and load circuit troubleshooting of lighting wires and convenient outlet.
5.Installation of cable trays.
6.Termination of low voltage cable, control cable and lighting panels.
DURATION : May 5, 2007 – April 30, 2008
COMPANY : Mans Work Trading and Construction
POSITION : ELECTRICIAN
PROJECT : ANSON Store Pasong Tamo Ext. Makati City
JOB DISCRIPTION
1.Termination and splicing of wires and cables.
2.Testing and energizing power and lighting conduit.
3.Perform electrical works such as conduit layout.
4.Installation of boxes fitting wiring and panel board.
5.Installation of cable trays.
DURATION : August 15, 2006 – February 22, 2007
COMPANY : G and L Electro Mechanical
POSITION : ELECTRICIAN
PROJECT : HBC Store Congressional Avenue Quezon City
JOB DISCRIPTION
1. Installation of panel board lighting fixture and circuit breaker.
2.Installation of boxes for convenience outlet.
3. Installation of cable trays.
4. Attend troubleshooting for some electrical problems.
DURATION : November 8, 2003 – July 10, 2004
COMPANY : Powerline Electrical Supply and Services Inc.
POSITION : ELECTRICIAN
PROJECT : Department Store Mall of ASIA Baclaran
JOB DISCRIPTION
1.Installation of panel board, lighting fixtures and circuit breakers.
2.Perform pipping, wiring and conduit layout.
3.Installation of cable trays.
4.Low voltage cable and control cable pulling.
5.Termination of low voltage cable, control cable and lighting panels.
6.Work safety to the assign duty.
DURATION : May 5, 2002 – October 25, 2002
COMPANY : CIC CONSYSTECH International Corporation
POSITION : ELECTRICIAN
PROJECT : NAIA IPT3 Villamore Airbase Pasay City
JOB DISCRIPTION
1.Perform layout and wiring installation.
2.Termination and troubleshooting on electrical problems.
3.Installation of boxes and panel board for convenience outlet.
4.Installation of cable trays.
5.Low voltage cable and control cable pulling.
6.Termination of low voltage cable, control cable and lighting panels.
CHARACTER REFERENCES
Engr. Marlon Martinez Paranaque City
I hereby swear that the above information is true and correct to the best of my knowledge and abilities.
BERNARD M. AGDA
Applicant Signature
DESCRIPTION OF WORK