Jaime C. Garcia

SENIOR ELECTRICAL ENGINEER

Education:

B.Sc. in Electrical Engineering, Manuel L. Quezon University, Manila, Philippines Certifications/Licenses:

Registered Electrical Engineer (REE) (0014364, Philippines) Summary: Total of 38 years’ experience in EPC of onshore oil & gas facilities

(including LNG compressor plants, Process Plants, Utility Plants, wellpads, Desalination plants, HV/LV infield Substation, refineries, infield equipment skids/platforms, Tank farms, pipelines, overhead HV power distribution lines, RTU sites, cross country pipeline network); oil & gas offshore platforms and jackets (including Processing platforms, Production platforms, Compressor platforms, Drilling platforms, Gas Treatment platforms, Water Disposal platforms, Substation platforms, Living Quarter platforms with helideck, connecting bridges and Flare Stacks); petrochemical plant utilities, facilities, and infrastructures; industrial, commercial, medical, hotel, residential buildings, sports complex and facilities; rapid transport system, telecommunication facilities and mining facilities including its infrastructures. The projects worked on were located in Queensland, Australia; Abu Dhabi, UAE; Copiapó, Chile; Hai Phong City, Vietnam; Al Khor, Qatar; Jakarta, Indonesia; Doha, Qatar; Kuala Lumpur, Malaysia; Bahia Blanca, Argentina; Kertih, Malaysia; Batu Hijau, Indonesia; Kingdom of Saudi Arabia and Metro Manila, Philippines. Area of particular expertise included the following:

- Project Management as well as Consultancy (PMC)

- Lead Engineering and Management

- Safety Engineering and Hazard Analysis of Process Plane & equipment

- Construction and Fabrication Management

- Site Management

- Plant Start-up

- Conceptual, FEED, Detailed, Construction Drawings Production

- Quality Assurance

Work involved FEED (greenfield and brownfield project), detailed engineering/design and construction work for EPC projects. The project deliverables completed included the following: Technical specifications & datasheets (for HV & LV Transformers, LV Switchgear/MCC, HV Switchgear/Controlgear, Emergency Diesel Generators, LV Bus Ducts, HV

& LV power & control cables, Subsea Cables, PF Capacitors, AC UPS, DC UPS, HV/LV VSD, Wellpad Electrical Skids, Power Management System, Bird Deterrent System, AC/DC Distribution boards, MOV Actuators, HV & LV Motors, CCVT, NavAids System, Supply of Electrical Equipment for Hazardous Areas, Hazardous Area Classification Dossiers, Cable Tray and Ladder, Installation and construction work, Automatic Transfer System, NER, AC & DC Distribution Boards, Earthing and Lightning Protection system, Solar Panel System, Process Electric Heater, Lighting and small Power System, RMU, Equipment Package, LER/Substation, Bulk Materials); 2D drawings (for Overall Single Line Diagrams, HV and LV Single Line Diagrams, Schematic Diagrams, Interconnection Diagrams, Living Quarter and Accommodation drawings, General Notes, Legend, Lighting & Small Power Layouts, Cable Tray & Raceways Layouts, Earthing Layouts, Distribution Board Schedule, HV & LV cable routing and underground system facilities layout, substation & misc. plant’s lighting & small power layout, Installation Details of Lighting, Power, Cable Tray System, earthing, Electrical Room Equipment Layouts, Heat Tracing System, LER & Living Quarter equipment layout, Hazardous Area Classification, Telephone Systems, Fire Fighting Services (including PA system, Fire Alarm System and Firemen's Switch and Intercom System), Building Management Services (including Security System), Lift Services, Earthing and Lightning Protection System); List (for MTO, Load List, Equipment List, cable schedule, Lighting fixture schedule, Tie-In Schedule); Documentations (for Design Basis, Lighting Philosophy, Cable Sizing Philosophy, Load Shedding and Black Start Philosophy, Operating Procedure & Philosophy, Electrical Control System Function. Technical Report such as: Adequacy Report, Load Flow Report, Motor Starting Report, Short Circuit Report, Transfer Strategies); Calculations (for cable sizing, Overcurrent Protection Device Sizing, Cable Tray Sizing, VD, Voltage Drop calculations, Illumination calculations) and coordination for design packages, including electrical, mechanical (Static equipment, Rotating equipment, HVAC) & Instrumentation system in LER/Substations. Quality review and checking of 3D models using SPR, datasheets, drawings, diagrams, lists and specifications.

Familiar with following industry Codes and Standards: International Electrotechnical Committee (IEC); British Standards Institution (BS); NFPA 70 (NEC); American National Standards Institute (ANSI) standards; American Petroleum Institute (API); Engineering Equipment & Material Users Association (EEMUA) Publication; IEEE; International Organization for Standardization (ISO); Australian Standard (AS); Malaysian Standard

(MS); ATEX and Philippine Standard (PS). Familiar with following automation tools Computer-Aided Design and Drafting (CADD), 3D modeling software (PDMS), MS Office Software, Electrical Engineering Software (ETAP), lighting calculation software (Luxicon and Chalmlite); Lotus Notes Software and system completion management computer program (WinPCS).

Specific Experience:

Senior Electrical Engineer

Transfield Services WorleyParsons Maintenance and Engineering Services Contract with Shell Philippines Exploration

12/2015- 07/2016 Alabang, Muntinlupa City, Metro Manila The company had been awarded to do Maintenance and Engineering Services Contract (MESC) for the Malampaya offshore platforms (SWP) and its’ Onshore Gas Plant (OGP). Most of our works were brown field projects. The work packages were produced by means of a gated procedure and phases (namely, IDENTIFY, SELECT, DEFINE, EXECUTE and CLOSEOUT) using Shell DEP. My electrical work involved the following: OGP Solar Upgrade of Control System; Electrical Console Module HVAC Phase 2; Replace Solar Generator Set Panels to EXd type; Mercury Removal Skid. The engineering work involved preparation of project initiation documents like CTR; input to PEP; input to Scope of Work; Project Deliverable Checklist; Project Deliverable Register. Production of fast track engineering deliverables like Isolation Plan; LV Single Line Diagram; LV Schematic and Connection Diagram; AC & DC Distribution Board Schedule; Substation & Misc. Plant Lighting Plan; Power Plan; Cable Ladder Layout; Earthing Layout; Cable Schedule; Load List; Installation Details, Hazardous Area Classification and MTO. Supervised calculation of the following: LV Cable Sizing; Lighting Illumination; Overcurrent Protection Device Sizing; VD; Cable Tray fill. Prepare Purchase Requisition and Purchase Order package for long lead items. Perform TBE and Technical Clarification formality. Perform engineering support, data gathering during site survey and field coordination. QA checking of engineering documents and Vendor documents. Coordinated & regular meeting with PMT and fabrication team resulting to less construction re-work. Carried out and facilitated the Client- Consultant joint Design Review Meetings. This had resulted to quicker turn-around of project deliverables. Attended to HAZOP and constructability review. Senior Electrical Engineer

Fluor Encana Cutbank Ridge Program

04/2015- 09/2015 Dawson Creek, BC, Canada

Encana Cutbank Ridge Program Project (Train 1 and Train 2) were intended as Detailed Design scope of work for onshore Gas Plant (Greenfield & Brownfield) complete with in-plant access roadways, Tank farm, loading bays and modularized type Process System Unit, Utility System Unit, Pipe Racks and Flare System Unit.

Checked and reviewed the datasheets for Mechanical Packages Purchase Requisitions and the Vendor Document deliverables for Mechanical Packages. Completed the early work Purchase Requisitions for Precast Trench, Duct Bank and Manhole. Quality checking of 3D model using SPR for 3rd Gen SP3D. Senior Electrical Engineer

Fluor Santos Gladstone LNG (GLNG)

08/2012 – 02/2015 Queensland, Australia

Phase 2, Santos Gladstone LNG (GLNG) Project was intended as FEED for onshore Upstream Gas field (Greenfield & Brownfield) complete with Wellhead Sites, Infield Pipelines, Process & Utilities Plants, Compressor Hubs, Desalination Plant. Completed the technical specifications, data sheets and Material Requisitions for LV MCC; LV Motors; AC & DC Distribution Boards; AC & DC UPS; LV VSD; Solar Panel and Batteries; Bulk Materials. Prepared the philosophy for Load Shedding and Black Start documentation. Peer checked specifications and data sheets. Completed and engineering review formality of various RO Water Desalination Package vendor documents and drawings. Senior Checker Abu Dhabi Marine Operating Company

Fluor NASR Full Field Development Project

01/2012 - 07/2012 Abu Dhabi, UAE

The NASR Full Field Development Project was intended as FEED for Super Complex platforms

(Greenfield & Brownfield) complete with Wellhead Towers, subsea infield pipelines, Process & Utilities Platforms, Accommodation Platforms, Connecting Bridges, Flare Towers, Subsea Flare Line & Oil export Pipeline.

Completed quality checking of project topside deliverables for technical specifications for HV Switchgear & Controlgear; HV/LV/Subsea Cables; LV Transformers; LV Switchgear /MCC; NER; ATS; LV Bus Ducts; AC & DC Distribution Boards; AC & DC UPS; Navaid System; Solar Panel and Batteries; Lighting & Small Power System; Heat Tracing; Bird Deterrent system; Bulk Materials; Cable Trays system; MOV Actuator; Distribution Boards and Capacitors. Completed quality checking of project topside deliverables (for 2D drawing & lists for HV & LV Cable Schedule, Lighting & Small Power Layouts, Cable Tray & Raceways Layouts, Earthing Layouts, Distribution Board Schedule, MTO and calculations for Illumination calculations, Voltage Drop calculations).

Completed quality checking of project 3D PDMS.

Electrical Engineer Minera Lumina Copper Chile

Fluor Caserones EPCM

08/2011 - 12/2011 160 km South East of the city Copiapó, Chile The Minera Lumina Copper Chile, Caserones Copper Plant Project ($13. Billion), Chile was a mining project. The project was intended to construct an extraction plant for copper and molybdenum.

Completed quality checking of 2D drawing, 3D PDMS models & document project deliverables

(namely, Lighting Layouts, Raceways Layouts, Earthing Layouts, Voltage Drop calculations, Distribution Board Schedule and calculations, Illumination calculations and MTO). Lead Electrical Engineer (PMC) PetroVietnam Company WorleyParsons PetroVietnam Engineering JSC Dinh Vu Polyester Plant Project 9/2010 - 6/2011 DVIZ Hai Phong City, Vietnam

Performed as lead and managed the EPC Contractor, EPC equipments delivery and Construction.

Quality checked EPC deliverables onsite and Pre-Commissioning activities Coordinated with PMT and EPC contractor design packages to ensure compliance to the project’s contract, procedure and specification and resolved engineering issues during construction.

Completed the Site Acceptance Test for HV & LV Substations, LV & HV Transformers; LV Switchgear /MCC; HV Switchgear & Controlgear; LV & HV Cables; AC & DC UPS; NER; ATS; LV Bus Ducts; AC & DC Distribution Boards; LV Diesel Engine Generator; LV Motors; Various Mechanical and Electrical Package Systems.

Carried-out EPC contractor’s production of project deliverables output progress monitoring. Assisted the PMC discipline Manager in proper coordination of project. Lead Electrical Engineer (PMC) PetroVietnam Company Energy Resources Singapore (seconded to Dinh Vu Polyester Plant Project WorleyParsons Australia) Seoul, South Korea

10/2009 - 9/2010

Performed management of the EPC Engineers, EPC deliverables and Material Requisition packages completion.

Quality checked EPC deliverables and ETAP calculations. Coordinated with PMT and EPC contractor design packages to ensure compliance to the project’s contract, procedure and specification and resolved engineering issues during FEED & Detailed Engineering stage.

Completed quality checking of project 3D PDMS.

Facilitated the quality check, constructability review and approval of EPC design packages (LV & HV Transformers; LV Switchgear /MCC; HV Switchgear & Controlgear; AC & DC UPS; NER; ATS; LV Bus Ducts; AC & DC Distribution Boards; LV Diesel Engine Generator; LV Motors; LV & HV Cables; Various Mechanical and Electrical Package Systems); electrical, mechanical (Static equipment, Rotating equipment, HVAC) & Instrumentation system including HV & LV Substations.

Carried-out EPC contractor’s production of project deliverables output progress monitoring. Back-up function for the Lead Instrumentation Engineer. Assisted the Procurement Engineer in new Vendor evaluation and short listing formalities. Electrical Commissioning Technician (PMC) Qatar Gas Company Brunel Energy, Qatar (seconded to Common Sulfur Project Qatar Gas) Al Khor, Qatar

3/2009 - 9/2009

Completed and reviewed the EPCC design packages for constructability. Reviewed & commented on the latest Construction and As Built Drawings and E&I System Mechanical Completion packages using system completion management computer program

(WinPCS). Assisted the Turn Over team in quality review of MC Packages to fast track turn around dates.

Liaise with field engineers on construction engineering matters and issue Field Change Notices. Investigated & developed construction engineering techniques required to solve design discrepancies.

Carried-out inspections for PMT HSE team in conducting regular construction site safety surveillance.

Senior Electrical Engineer Total E&P Indonesie Company PT Nippon Steel Construction Indonesie Peciko 5 Project 12/2006 - 8/2007 Jakarta, Indonesia

Duties and responsibilities as Lead Electrical Engineer for Peciko Field Development EPC project

(Phase 5b):

Prepared & developed Material Requisitions Index, specifications & datasheets (for HV/LV Transformers; HV Switchgear & Controlgear; LV Bus Ducts; LV MCC; Power Management System; NER; ATS; AC & DC Distribution Boards; AC & DC UPS; LV VSD; HV/LV Motors; Navaid System; HV/LV Cables and subsea cables; Solar Panel and Batteries; Lighting & Small Power System; Heat Tracing; Bird Deterrent system; Bulk Materials & Electrical Package System).

Completed quality checking of 2D drawing project deliverables (for Lighting & Small Power Layouts, Cable Tray & Raceways Layouts, Earthing Layouts, Voltage Drop calculations, Distribution Board Schedule and calculations, Illumination calculations and MTO). Facilitated the quality check, inter-discipline coordination, interfacing and constructability review and approval of EPC design (HV/LV Single Line Diagrams, Schematic Diagrams, Interconnection Diagrams, HV/LV cable schedule, LER & Living Quarter equipment layout, cable routing, lighting & small power layout, earthing layout, Installation Details of Lighting, Power, MCT, Cable Tray System, Hazardous Area Classification of platform jacket, Living Quarter, Helideck, Bridge Linkages) & vendor packages, including electrical, mechanical (Static equipment, Rotating equipment) & Instrumentation system.

Supervised the automated & manual calculation of lighting illumination, HV/LV cable schedule, cable sizing, Overcurrent Protection Device Sizing, Cable Tray Sizing, VD. Coordinated & regular meeting with PMT/PMC and fabrication team resulting to less construction re-work.

Completed the Material Requisitions of Major Long lead items to Procurement for RFQ placement. This resulted to timely delivery of equipment at site. Prepared vendor TBE & facilitated Bidder’s technical clarifications coordination formalities for major electrical items.

Carried-out timely completion, detailed design production by subcontractors and vendors document approval.

Carried out and facilitated the Client-Consultant joint Design Review Meetings. This had resulted to quicker turn-around of project deliverables.

Accomplished the task of interfacing with other discipline & progressive QA checking in detailed design package production (cable routing, lighting & small power layout, earthing layout, cable schedule, Single Line Diagrams, Schematic Diagrams, Interconnection Diagrams, Installation Details of Lighting, Power, MCT, Cable Tray System, earthing, Hazardous Area Classification, & issuance of Drawing and Technical documents.

Liaise with Client’s representative & PMT/PMC to resolves design issues & change management formalities.

Provided technical assistance to procurement engineers for inspection & witnessing of tests for major electrical equipments and facilitate procurement formalities. Supervised the periodic monitoring and control of the design team’s activities to meet the project’s goals, progress and set deadlines. Formulated recovery plans. Conducted site coordination and facilitate fabrication and survey for data gathering, verification and coordination which shall serve as input to design team. This resulted to higher design accuracy. Liaise with field engineers on construction engineering matters and completed Field Change Notice formalities.

Performed design and construction interface and coordination work. Facilitated work in the completion, coordination, quality procedures, checking and conformance of Electrical work packages to Client’s requirement. This involves detailed design of Wellhead Platform located in Peciko field, Kalimantan, Indonesia Senior Electrical Engineer ConocoPhillips Indonesia Inc., Ltd PT Nippon Steel Construction Indonesie North Belut Project 8/2007- 9/2008 Jakarta, Indonesia

Duties and responsibilities as Senior Electrical Engineer for North Belut EPC project: Assisted the Lead Engineer and formulate recovery plans. Backed up the Lead Engineer to facilitate the completion, coordination, quality procedures & conformance of Electrical work packages to Client’s requirement. This involves detailed design of Wellhead Platform located in North Belut, Indonesia. Assisted the Lead Engineer manage the timely completion and detailed design production by subcontractors and vendors.

Quality Assurance checking of detailed design production by subcontractors and vendors. This resulted to higher client approval.

Assisted the Lead Engineer to expedite & supervise electrical design team to complete engineering & production of Long Lead material requisition formalities (for HV/LV Transformers; LV Switchgear/MCC; HV Switchgear & Controlgear; NER; ATS; LV Bus Ducts; AC & DC Distribution Boards; AC & DC UPS; LV VSD; LV Motors; LV & HV Cables; Solar Panel and Batteries; Lighting & Small Power System; Navaids System; PAGA System; Heat Tracing; Bulk Materials & Electrical Package System). Detailed Bulk Material MTO. This resulted to minimum delay in delivery of equipment at site.

Coordinated & participated in regular meeting with PMT and fabrication team resulting to less construction re-work.

Issued Material Requisitions and Major Long lead items to Procurement for RFQ placement. This resulted to timely delivery of equipment at site.

Prepared vendor TBE & facilitated Bidder’s technical clarifications coordination formalities for major electrical items.

Conducted site coordination and facilitate fabrication and survey for data gathering, verification and coordination which shall serve as input to design team. This resulted to higher design accuracy.

Carried-out automated & manual calculation of lighting illumination, cable sizing, Overcurrent Protection Device Sizing, Cable Tray Sizing, VD calculation. This resulted to higher client approval.

Accomplished the task of interfacing with other discipline & progressive QA checking in detailed design package production (LER & Living Quarter equipment layout, HV/LV cable schedule, Single Line Diagrams, Schematic Diagrams, Interconnection Diagrams, cable routing, lighting & small power layout, earthing layout, Installation Details of Lighting, Power, MCT, Cable Tray System, earthing, Hazardous Area Classification & issuance of Drawing and Technical documents. This had resulted to quicker turn-around of project deliverables. This resulted to higher client approval to output.

Liaise with other discipline on PDMS model interference checking & coordination. This resulted to minimum installation re-work.

Facilitated the quality check, inter-discipline coordination, interfacing and constructability review and approval of EPC design & vendor packages, including electrical, mechanical (Static equipment, Rotating equipment) & Instrumentation system. Completed the Site Acceptance Tests and the Motors/Electrical Equipments/system Pre- Commissioning formalities. These included completion & compilation of test forms and reports) & Electrical System Mechanical Completion packages & Dossiers. Senior Electrical Engineer Qatar Petroleum

WorleyParsons Qatar WLL Control System Upgrade for NGL1 & 2 Project 7/2006 - 12/2006 Doha, Qatar

Duties and responsibilities as Senior Electrical Engineer for FEED project: Conduct onshore site survey at Messaieed Industrial plant complex for data gathering, verification and coordination which shall serve as input to design team. This resulted to higher design accuracy.

Expedited Bulk Material Take-Off, Material Requisition and Long Lead material specifications and requisitions formalities (for HV/LV Transformers; LV Switchgear/MCC; HV Switchgear & Controlgear; HV & LV Cables; NER; ATS; LV Bus Ducts; AC & DC Distribution Boards; AC & DC UPS; LV Motors; Lighting & Small Power System; Heat Tracing; Bulk Materials & Electrical Package System).

Carried-out QA procedure, safety and engineering checking. This resulted to higher client approval.

Carried-out the following calculations: lighting system illumination, cable sizing, overcurrent protection device sizing, Cable Tray Sizing, and Voltage Drop Calculations. Facilitated the quality check, inter-discipline coordination, interfacing and constructability review and approval of detailed design & vendor packages, including electrical, mechanical (Static equipment, Rotating equipment) & Instrumentation system. Facilitated Client-Consultant joint Design Review Meetings. This resulted to higher client approval ratio.

Accomplished the task in detailed design package production (HV & LV cable routing and underground system facilities layout, Central Control Room lighting & small power layout, External Lighting layout, earthing layout, cable schedule, Single Line Diagrams, Schematic Diagrams, Interconnection Diagrams, Installation Details of Lighting, Power, cable duct, Cable Tray System, earthing, Electrical Room Equipment Layouts) & issuance of Drawing and Technical documents.

Alignment meetings and harmonized the Client’s comment. This resulted to higher client approval.

Performed design and construction interface work.

Senior Electrical Engineer Overseas Bechtel International WorleyParsons Qatar WLL New Doha International Airport Project 4/2006- 7/2006 Doha, Qatar

Assisted the lead engineer (for EPC Project) in carrying out routine engineering work such as: Carried-out QA procedure, safety and engineering checking. Conduct onshore site survey at proposed airport complex & existing airport substation facilities for data gathering, verification and coordination which shall serve as input to design team. Expedited detailed Equipment Purchase Requisition and Long Lead material specifications and datasheets for material requisitions formalities (for HV/LV Transformers; LV Switchgear/MCC; HV Switchgear & Controlgear; NER; Emergency Diesel Generator & ATS; LV Bus Ducts; AC & DC Distribution Boards; AC & DC UPS; LV VSD; LV Motors; LV & HV Cables; Solar Panel and Batteries; Lighting & Small Power System; Navaids System; PAGA System; Heat Tracing; Bulk Materials). This resulted to timely delivery of equipment at site. Carried-out automated & manual calculation for lighting illumination, cable sizing, Overcurrent Protection Device Sizing, Cable Tray Sizing, VD calculation. This resulted to higher client approval.

Accomplished the task in detailed design package production (HV & LV Single Line Diagrams, Schematic Diagrams, Interconnection Diagrams, cable routing and underground system facilities layout, substation & misc. plant’s lighting & small power layout, earthing layout, cable schedule, Installation Details of Lighting, Power, Cable Tray System, earthing, Electrical Room Equipment Layouts) & issuance of Drawing and Technical documents. Carried-out alignment meetings and harmonized the internal and external Client’s comment. This resulted to higher client approval to project deliverables. Supervised & organised the design team member.

Senior Electrical Engineer Occidental Petroleum Qatar Ltd WorleyParsons Qatar WLL Misc. Engineering Service Contract Project 8/2005- 4/2006 Doha, Qatar

Facilitated completion of Electrical work packages (for EPC Project). This involves various lump sum & reimbursable projects under an engineering services contract agreement. This resulted to more project accomplishments under limited manpower resources & demanding schedules. Prepare Weekly Task Planner for team members.

Facilitate & conduct site survey for data gathering, verification and coordination which shall serve as input to design team. This resulted to higher design accuracy. Expedited detailed Material Take-Off, Material Requisition and Long Lead material specifications and requisitions formalities (for Emergency Generator; HV/LV Transformers; LV Switchgear/MCC; HV Switchgear & Controlgear; HV/LV Cables; HV/LV Motors; PLC interconnection, NER; ATS; AC & DC Distribution Boards; AC & DC UPS; Solar Panel and Batteries; Lighting & Small Power System; Navaids System; PAGA System; Heat Tracing; Bulk Materials & Electrical Package System). This resulted to timely delivery of equipment at site. Manage the timely completion of detailed design production by subcontractors and vendors. Performed QA procedure, safety and engineering checking. Carried-out automated & manual calculation of lighting illumination, cable sizing, Overcurrent Protection Device Sizing, Cable Tray Sizing, VD calculation. Prepared detailed engineering & design of brown field design package in modules (HV/LV Single Line Diagrams, Schematic Diagrams, Interconnection Diagrams, HV/LV cable schedule, LER & Living Quarter equipment layout, cable routing, lighting & small power layout, earthing and lightning protection system, Installation Details of Lighting, Power, MCT, Cable Tray System, Hazardous Area Classification of platform jacket, Living Quarter, Helideck, Bridge Linkages). Prepared vendor TBE & facilitated Bidder’s technical clarifications coordination formalities for major electrical items.

Facilitated completion, coordination, regular meeting with PMT, fabrication team and team building meetings.

Trained new team members to be aligned with project expectations. This resulted to increase team efficiency.

Monitored and controlled the design team’s activities to meet the project’s goals, progress and set deadlines. This resulted achievement to reach the company target profit & accomplishments. Performed design and construction interface work.

Senior Electrical Engineer Sarawak Shell Berhad

Perunding Ranhill Worley Misc. Engineering Service Contract Project 8/2001- 8/2005 Kuala Lumpur, Malaysia

Facilitated the completion of Electrical design packages Accomplished the task in detailed design package production & issuance of Drawing Packages and harmonized the Client’s comment together with the Scope of Work inclusion or exclusion. Facilitate & conduct site survey for data gathering, verification and coordination which shall serve as input to design team. This resulted to higher design accuracy. Expedited detailed engineering packages using Shell DEP for Material Take-Off and Long Lead material specifications and requisitions formality (for HV/LV Transformers; LV Switchgear/MCC; HV Switchgear & Controlgear; NER; ATS; LV Bus Ducts; AC & DC Distribution Boards; AC & DC UPS; LV VSD; LV Motors; LV & HV Cables; Solar Panel and Batteries; Lighting & Small Power System; Navaids System; PAGA System; Heat Tracing; Bulk Materials & Electrical Package System). This resulted to timely delivery of equipment at site. Performed quality checking of detailed design package using Shell DEP for (for HV/LV Single Line Diagrams, Schematic Diagrams, Interconnection Diagrams, HV/LV cable schedule, LER & Living Quarter equipment layout, cable routing, lighting & small power layout, earthing & lightning protection system, Installation Details of Lighting, Power, MCT, Cable Tray System, earthing, Hazardous Area Classification).

Carried-out automated & manual calculation of lighting illumination, cable sizing, Overcurrent Protection Device Sizing, Cable Tray Sizing, VD calculation. This resulted to higher client approval.

Facilitated the Client-Consultant joint Design Review Meetings. Completed the inter-discipline coordination prior to the detailed design formalities of these offshore production & drilling platforms

Facilitated the issuance of Meeting Minutes and other project communications. This resulted to timely design alignment.

Performed FEED projects, Detailed Engineering & Design projects. This resulted to more company profit & accomplishments.

Prepared detailed engineering & design of brown field design package in modules (platform jacket, Living Quarter, Helideck, Bridge Linkages, processing platform and drilling platforms) Principal Electrical Engineer Saudi Aramco Company Lummus Alireza Ltd., Co Khuff Condensate Project (KCS) Project 7/2000 - 8/2001 Kingdom of Saudi Arabia

Performed EPC Project Proposal and Detailed Engineering & Design for Khuff Condensate Project (KCS), Located in Ras Tanura Refinery, KSA. Performed as the interim Design Team Leader. Attended the various alignment meetings with client in-kingdom to