CAROLYN LEBLANC
SEABROOK, TEXAS **586
**********@*********.***
PROFESSIONAL EXPERIENCE MOMENTIVE, TEXAS CITY. TEXAS
Piping Designer
Complete as-built of Plant P&ID's from walk down,utilizing autocad plant. Created utilility P&ID's for entire plant. Maintained projects.
PROFESSIONAL EXPERIENCE TELLEPSEN INDUSTRIAL, PASADENA TEXAS
11/18 to 06/19
Piping Designer
Athlon
Walked down and updated P & ID’s for Lone Sar College using Autocad. Checked and revised P& ID’s, Isos, Plot Plans using Cadworks/Navisworks 2015,.
11/14 to 11/2015 REF-CHEM ENGINEERING, HOUSTON, TEXAS
Sr. Piping Designer
Modeled layout of tank farm piping for Odjfell, and layout of slug catchers for Williams using cadworks.
2013 to 10/14 PREFERRED ENGINEERING, NASSAU BAY, TEXAS
Sr. Piping Designer
Lyondell
Utilized Cadworks for field routing pipe to existing equipment. Isometrics, Autocad,plans and sections for various small projects at various Lyondell plants.
8/2012 to 8/2013 VENTECH ENGINEERS,INC. PASADENA, TEXAS
Sr. Piping Designer
Responsible for checking piping models, arrangement drawings and isometric drawings for modularized refinery units for KAR III Unit of ERBIL Refinery. Modeled utility stations and safety shower stations and managed the issue process for isometric piping drawings for Cryogenic Unit of Lone Star Refinery.
1/2012 to7/2012 BIS TEPSCO ENGINEERING, DEER PARK, TX.
Sr. Piping Designer
Formosa,Enterprise and Odjfell
Responsible for various projects,which included, field investigation, surveying, piping design, creating Plans and Sections, with Isometric construction documents. Utilizing AutoCad r.2014 and CadWorx r.2012
10/2010 to 1/2012 BIS FRUCON ENGINEERING, DEER PARK, TX.
Sr. Piping Designer
Enterprise, and Formosa
Responsible for various projects,which included, field investigation, surveying, piping design, creating Plans and Sections, with Isometric construction documents. Utilizing AutoCad r.2014 and CadWorx r.2012
10/2005 to 10/2008 DOW CHEMICAL CO., TEXAS CITY, TX.
Sr. Piping Designer
Responsible and managed various small and large projects upon completion which included. Layouts design, field design, elevation surveys, pipe design, drawing creation and isometric creations on 3D – Pasce Cad System. Duty’s also included design of piping plan, detail drawing, vessel detail drawings and P&IDS modification on 2D Microstation Cad System. Duty’s includes file managing and creation of tie-point location drawing, line-tie-point-test schedules, estimating, material take off and ordering on PowerPoint, and Excel programs. Interface with management, vendors, engineers and designers.
4/2004 to 10/2005 FOSTER WHEELER, CORP.
Piping Estimator
Piping estimator for project estimating. Acquired and updated piping unit cost and updated piping specifications per different projects. Experienced in Word And Excel.
2/2003 to 4/2004 SPECTRUM DESIGN SERVICES, INC.
Piping Designer
Working in-house for BP using CadPipe for inspection isometric’s. Responsible for service reports including runout reports with machine and rotor CAD drawings. Pipe Design and Layouts. P&ID checks
1/2002 to 2/2003 BEI ENGINEERS
Piping Designer
Shell Deer Park Refinery - Cat Gasoline Hydrotreater
Routed rack piping of several lines, fieldwork and isometrics for each. Maintained P&ID’s, line list and tie in list for CGHT project.
Valero Texas City - SRU-3 Revamp, Marathon Pipeline
Using AutoPlant 2002 Rebis drew isometrics, P&ID’s and Plans and Sections. Field survey and design with P&ID walkdown.
6/2000 to 1/2002 INDUSTRIAL ELECTRICAL SERVICES
Piping Designer
Drawings for bid packages and O&M manuals for MCC units and lift stations. Performed material check for Control Panels.
2/1998 –11/1999 PRODUCTION OPERATORS-Houston
Piping Designer
Inemaka, Venezuela - Kaki, and Maulpa
P&ID from bid to completion for gas compression plant. Responsible for concrete layout drawings and details. Complete electrical layouts, conduit schedules, and detail drawings for complete site. Electrical drawings and details for Guara Venezuela jobsite.
3/1997-2/1998 McDERMOTT ENGINEERING-Houston
Piping Designer
Sakhalin II Project, - Sakhalin, Russia
Offshore platform, redesign of process module. Annotated piping plans and sections using PDMS, draft mode. Flowsheet checked PDMS Isos. Designed & detailed pipe support on AutoCAD. Isometric spool coordinator
4/1995-2/1997 S&B ENGINEERING & CONSTRUCTION
Piping Designer
Chevron - Marietta, Ohio
Polystyrene Expansion Project - from conception to completion. Front-end estimate of Rubber Syrup and styrene. Responsible for completion and all changes for 174 AutoCAD flowsheets. Fieldwork and tie-ins. Revised Isos - tabulated punch list on Isos to do.
08/1993 - 3/1995 CDI-STUBBS OVERBECK, Houston, TX
Piping Designer
Union Carbide
Upgraded cycle water system throughout entire plant. Scope of work included replacement of five cooling towers and upgrading of four existing ones, revised associated cooling water pumps and did underground piping to upgrade the valving system of plant cycle water loops. Work included fieldwork, demolition piping plans and isometrics.
Exxon
Revised plans and sections. Revised AutoCAD flow sheets.
3/1988 - 2/1993 JACOBS ENGINEERING GROUP, INC.
Piping Drafting
Chevron - FCCU Unit
Plans, sections and isometrics for Chevron, El Paso.
Lyondell Petrochemical - Channelview
(Field Assignment) Plans, sections and isometrics for boiler upgrade.
Koch Refinery - Corpus Christi
MSTDP: Plans, sections and isometrics. Toluene fractionation: Plans, sections and isometrics.
Marathon Oil - Robinson, Illinois
Plans, sections and isometrics. Some field work required.
Firestone/Bridgestone, Inc.
Synthetic Butadiene Rubber Plant - Revamp:
Helped complete definitive estimate with development of layout studies and isometrics. Some field work required.
Koch Refining Company - FCCU Revamp
Did field work at plant site requiring walk down of existing lines for tie-ins. Created isometrics from sketches on AutoCAD-CADPIPE-ISO. Made revisions of P&ID's and isometrics.
Nalco Chemical Company
Oxyalkylization Modernization
Process pipe drafting of plans, sections and isometrics.
3/1986 - 3/1988 MONTEREY PIPELINE COMPANY
Drafter
EXXON GAS SYSTEM, INC.
Design and drafting of company sales stations, meter skids and hot taps. As-builts of existing stations.
Maintained system maps and drawings. Prepared R.O.W. and road crossing drawings.
One year AutoCAD - Flow sheets, isometrics and single line piping. Used to update system Risk Management and Dispatch drawings.
4/1984 - 3/1986 TECHSTAFF, INC.
Drafter
Bethlehem Steel
Design and detail in the piping, civil and electrical disciplines. Coordinating and checking of piping and civil drawings. Detailed area classification plans, power and grounding, instrument loops and other electrical drawings.
Good Hope Refineries
Layouts of major gas gathering system in West Texas, consisting of compressor stations and transmission pipelines.
DuPont DeNemours
LeRoying of alignment sheets and property plats.
2/1983 - 3/1983 CREST ENGINEERING
Drafter
Aramco Crude Oil Treatment
Drafting of flow sheets and P&ID’s for crude oil treatment.
3/1981 - 1/1983 GULF INTERSTATE ENGINEERING COMPANY
Drafter
Tennessee Gas Pipeline
Drafting of yard piping dehydration platforms, water disposal platform and process pump platform from study drawings. Cut section from finished plans and sections. Familiar with piping specifications flow sheets and job standards.
3/72 - 3/81 CAMERON IRON WORKS, INC.
Drafter
Mechanical Design Group - Plant Engineering
Layouts, assemblies and sections of machine and equipment drawings, hydrostatic testers, 20,000-ton press and furnaces.
Civil Plant Engineering
Located slabs, fences, buildings, etc., plant wide from field measurements. Put in lift station and did area drawings on expansion program at Cypress plant. In charge of reproduction department for Plant Engineering for four years. Helped with switchboard on an as needed basis.