Mohamed Yaccoubi

Electrical Manager

RESPONSIBILITY & KEY SKILLS

• Contract Management and control disputes (claims, payments and contract closeout)

• Review and approve project schedule and implementation strategy in various phases of project.

• Management of resources and time in accordance of project difficulties.

• Responsible and accountable of installation during execution phases.

• Lead/Supervise operational efforts during construction & commissioning phases

• Plan/schedule work in accordance with project interfaces and difficulties

• Prepare/approve work method statement procedure in accordance with Engineering and project specification

• Conducts meetings with construction team, commissioning team, vendors and clients.

• Attend and witness FAT’s & SAT’s and approval reports as necessary.

• Lead the teams to strategize, prepare, plan and execute the contractual scope.

• Coordinate with all stakeholders (Client, Project Management, Construction management, Vendors, Subcontractors and Third Parties) for the expedient and safe delivery of the scope above.

• Prepare system/sub-system break up for sequential commissioning of project.

• Prepare/review Pre-commissioning and commissioning procedures.

• Develop protocols/formats for taking over system/subsystem from Construction and further complete pre-commissioning and hand over system for commissioning.

• Interact with Consultant/Customer to ensure all protocols are timely accepted and system is handed over immediately after commissioning.

• Interact with Construction team and vendor representatives to clearly convey requirement in order to achieve commissioning of the project safely.

• Approves designs and verifies that facilities are built to the relevant specifications and standards.

Page 2/5

• Prepare/approve commissioning procedures in accordance with manufacturers’ recommendations and company guidelines.

• Prepare/approve work method statement procedure in accordance with Engineering and project specification.

• Provides structured Training and development for Electrical Team.

• Ability to work effectively in a multidisciplinary team environment.

• Sign /approve LOTO PTW in accordance with (Lock-out/ Tag-out) procedures.

• Installation and Commissioning of DCS Distribution control system

• Installation and Commissioning of ESD Emergency Shut Down

• Installation and Commissioning of F&G Fire & Gas

• Installation and Commissioning of HV, MV, LV installations Diploma:

2005: High Technician of Industrial Maintenance / High School of Industrial Maintenance EL WARDIA-TUNIS TUNISIA

1999: Technology bachelor / Technical School of Ibn Abi Dhiaf TUNISIA From 2017 to 2022: Electrical Manager at PSI Tunisia Main Tasks and responsibilities:

- Projects Management (Project Schedule, Project Progress and Forecast, Milestones, Procurement Schedule, Project Cost Control)

- Prepare and approve Scope of Work (SOW) during Construction and Commissioning Phases.

- Approves designs and verifies that facilities are built to the relevant specifications and Standards.

- Contract Management and control disputes (claims, payments and contract closeout)

- Management of resources and time in accordance to project difficulties

- Management of project interfaces (Overlap activities, SIMOS work)

- Conduct weekly meeting with all concerned departments to discuss projects difficulties And putting action and/or recovery plan if necessary

- Ensure the successfully achievement of project installation in accordance to the project Schedule and requirement

Projects:

- CONSTRUCTION AND START UP OF E&I PACKAGE OF NAWARA SOUTH TUNISIA DEVELOPMENT CENTRAL PROCESS FACILITY (CPF), FLOWLINES AND WELLPADS FOR OMV

- TEMPORARY MOBILISATION & CONSTRUCTION CAMP AND OFFICES FACILITIES

- CONSTRUCTION AND START UP OF E&I PACKAGE OF NAWARA SOUTH TUNISIA DEVELOPMENT PIPE LINE (PPL) FOR OMV

- CONSTRUCTION AND START UP OF E&I PACKAGE OF POWER PLANT 400 MW PROJECT RADES-C FOR STEG TUNISIA

- DESIGN AND FABRICATION OF 24 UNITS OF CHIMICAL INJECTION SKIDS FOR SONATRACH ALGERIA

- GAS COMPRESSORS REVAMPING AND CONTROL SYSTEM INSTALLATION LIBYA WORK EXPERIENCE

Education

Page 3/5

- INSTALLATION OF CARTRIDGE FILTER SYSTEM FOR MELLITHA OIL AND GAS LIBYA

- CONSTRUCTION OF 15 KM PIPE LINE 12” FOR MELLITHA OIL AND GAS LIBYA

- DESIGN AND FABRICATION OF 52 WELL HEAD CONTROL PANEL FOR SONATRACH ALGERIA

- CONSTRUCTION AND INSTALLATION OF 80 KM PIPE LINE36” FOR HARROUJ LIBYA

- MANAGEMENT OF MAINTENANCE CONTRACT OF NAWARA SOUTH TUNISIA DEVELOPMENT CENTRAL PROCESS FACILITY (CPF), FLOWLINES AND WELLPADS FOR OMV TUNISIA

- MANAGEMENT OF MAINTENANCE CONTRACT OF ENI GAS STATION WED ZAR SOUTH TUNISIA FOR ENI TUNISIA

From 2016 to 2017: Electrical & Instrument superintendent with ERET for OMV Main Tasks and responsibilities:

- Lead/Supervise operational efforts during construction phases

- Plan/schedule execution work in accordance with project interfaces and difficulties

- Preparation of installation procedures according to project specifications

- Follow the installation during the project execution phases

- Manage coordination meetings with different disciplines

- Prepare/approve work schedules and allocation of resources

- Management of electrical and instrument punch list clearance

- Follow-up the mechanical completion of electrical and I&C in accordance to the project Schedule

Project: NAWARA Gas Treatment Plant GABES Tunisia for OMV. From 2013 to 2016: Electrical Construction and Commissioning Manager at SNC – LAVALIN Main Tasks and responsibilities:

- Preparation of commissioning procedures and test & inspection reports

- Review and approval of project schedule / follow-up of commissioning planning

- Follow-up of the vendors planning and regular updating

- Coordinate and manage meetings with the construction team during all project phases

- Manage the coordination meetings with all project disciplines

- Preparation of work schedules and allocation of resources

- Authorized to sign LOTO PTW to ensure the safety of Employees and equipment’s

- Organize, monitor and assist vendors' activities during the SAT

- Testing and commissioning of the HV substation (Testing the control part of switch, circuit breakers and interlock system)

- Parameter setting of protection relays according to the project study

- Testing and starting of HV/HV and HV/MV power transformers

(Main Transformer and Auxiliary-Transformer)

- Testing and commissioning of UPS system (battery charging test, Discharge, Release test)

- Testing and commissioning of MCCs and low voltage boards (power and control)

- Testing and commissioning of medium voltage cells (primary injection on TPs and CTs, secondary injection on protection relays, verification and test of interlock system)

- As-built of project electrical drawings (Red Mark-up) Project: Power Plant combined cycle 400MW Sousse for STEG Tunisia. From 2013 to 2013: Electrical & Instrument Trainer of Operation & Maintenance team of Power Plant 1227 MW Hadjret Ennous Algeria at SNC – LAVALIN

Main Tasks and responsibilities:

- Training of electrical & instrument team on different systems such as:

* Seawater pumping station (Preventive maintenance of main and auxiliary ROTORK Valves)

* CEMS smoke analysis system of stack (preventive maintenance of analyzers)

* Gas station (preventive maintenance of valves, checking and adjustment of ramps)

* Auxiliary boiler (checking the ignition of the burner, checking the flame monitoring System, checking the limit parameters of the boiler)

- Attend and manage the coordination meetings with Operating and Maintenance team Page 4/5

From 2012 to 2013: I&C, F&G and Electrical Manager at SNC – LAVALIN Main Tasks and responsibilities:

- Preparation of commissioning procedures and inspection reports

- Participate in the project schedule / follow-up of commissioning planning

- Manage coordination meetings with different disciplines

- Preparation of work schedules and allocation of resources

- Organize, monitor and assist vendors' activities during the SAT

- Starting of MAN TURBO compressors for gas injection

- Testing and commissioning of the Honeywell F&G system

- Testing and commissioning of Anti-Surge system of Compression Gas Station

- Adjustment and setting of protection relays according to the project design

- Testing and commissioning of MCCs and low voltage boards (power, control and circuit Breakers)

- Testing and commissioning of medium voltage cells (primary injection on TP and CTs, secondary injection on protection relays, verification/testing of interlock system)

- As-built of project electrical and I&C drawings (Red Mark-up) Project: Duplication Gas Compression flash (LP-MP) for “SONATRACH /AGIP” Oil Treatment Center Bir Rabâa Nord ROD Algeria.

From 2011 to 2011: Electrical and I&C Construction and Commissioning Manager at SNC –LAVALIN Main Tasks and responsibilities:

- Testing and commissioning of MCCs and low voltage boards (power, control and circuit breakers)

- Testing and commissioning of medium voltage cells (primary injection on TP and CTs, secondary injection on protection relays, verification of interlock system)

- Testing and commissioning of DCS and ESD systems Invensys Foxboro (Cold loop, Hot loop, signals simulations, Instrument process commissioning, functional test of the ESD system)

Project: Rehabilitation of GPL factory Rhoud-Ennouss Algeria for “SONATRACH”. From 2010 to 2011: Electrical assembly and testing responsible at ALSTOM Transport Main Tasks and responsibilities:

- Installation, testing and commissioning of electrical substations

- Installation, testing and commissioning of Catenary communication system

- Installation, testing and commissioning of Catenary switch and circuit breakers

- Installation, testing and commissioning of Catenary control system (control room)

- Installation, testing and commissioning of Catenary signaling system

- Functional test of suburbs catenary protection system

- Start-up of electric catenary suburbs train tracks Project: Electrification “25KV” of southern suburbs trains of Tunis for SNCFT Tunisia. From 2009 to 2010: Electrical and I&C site engineer at ALSTOM POWER Main Tasks and responsibilities:

- Installation and testing of F&G detection system (F&G Control unit, Detectors, visual and sound signaling system and activation of manual buttons)

- Installation and testing of F&G protection system (Fire Water pumping station, Deluge system, RIA System, CO2 Rack, Sprinklers and Spear Cannons)

- Modification of execution plans if necessary (Red Mark)

- Functional test of F&G system with discharge (F&G cause & effect matrix) Project: Power Plant Combine cycle single shaft 400MW Gabes for STEG Tunisia. From 2008 to 2009: Commissioning site engineer Electrical and I&C at SNC – LAVALIN Main Tasks and responsibilities:

Page 5/5

- Testing and commissioning of the following systems: Sea water pump station Desalination station, Auxiliary Boiler, Electro-chlorination Station, GIS System

- Testing and commissioning of MCCs and low voltage boards (power, control and circuit-breakers)

- Testing and commissioning of medium voltage cells (primary injection on TPs and CTs, secondary injection on protection relays, verification of the inter-lock system)

- Testing and commissioning of DCS and ESD systems (cold and hot loop check, Signals simulations, process commissioning, operation test and start-up of DCS, ESD and F&G)

Project: Power Plant Combine cycle 1227 MW Hajret Nouss for SONELGAZ Algeria. From 2007 to 2008: Electrical, I&C and F&G commissioning coordinator at BENTINI Main Tasks and responsibilities:

- Testing and Commissioning of the 60Kv-6.6Kv Electrical transformer Substation

- Testing and commissioning of MCCs and low voltage boards (power, control and circuit-breakers)

- Testing and commissioning of medium voltage cells (primary injection on TPs and CTs, secondary injection on protection relays, verification of the Locking)

- Testing and commissioning of DCS and ESD systems (cold and hot loop check, Signals simulations, process commissioning, operation test and start-up of DCS, ESD and F&G)

- Testing and commissioning of F&G system (detection, Visual and sound signaling, CO2 rack vacuum testing, Protection system such as water pumping station, deluge valve, RIA and lance cannon)

Project: SP2-SP3 Two Fuel Pumping stations M’SILA and BISKRA for SONATRACH Algeria.

From 2007 to 2007: Electrical supervisor at Snamprogetti Main Tasks and responsibilities:

- Receipt and verification of electrical and instrumentation equipment delivered on site

- Monitoring of the electrical and instrument installation work of Turbo-compressors as : Cable tray installation, Cable pulling, low Voltage Cabinet assembly and medium voltage cells, lighting, earthing network, Assembly of process instruments, Instruments and junction boxes connection

- Follow-up and ensure the good installation and execution work of Electrical and Instrument in order to meets the project requirements and standards. Project: Increasing and revamping of gas plant compression GAZODUC for SCOGAT

« Gas TRANS-TUNISIAN transportation system » Tunisia. From 2005 to 2006: Industrial Maintenance responsible at VOLVO GROUP

- Prepare the annual and monthly Planning of preventive and curative interventions

- Prepare corrective and troubleshooting Action Plan MS office pack, Power BI, Primavera P6, MS project, ERP… Informatics Skills