Post Job Free

Resume

Sign in

Aramco Quantity Surveyor

Location:
Coimbatore, Tamil Nadu, India
Salary:
4500 USD
Posted:
January 15, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

R. THAMIZHSELVAN

aduoq3@r.postjobfree.com

Mobile: +919*********

CAREER OBJECTIVE

To pursue a professional career in a dynamic and challenging work environment that provides me

ample chance to work effectively and to be a valuable asset to organization.

EDUCATIONAL QUALIFICATION

B.E., in Mechanical Eng. from A.A.M. Eng. College, Bharathidasan University, April 2003 with 66.57% (First Class) of marks.

H.Sc., from D.B.T.R. National Hr. Sec. School, Mayiladuthurai March 1999 with 77.5% of marks.

S.S.L.C. from Govt. High School, Ennakudi April 1997 with 85.2% of marks.

PRESENTLY WORKING IN

Organization : Saipem india projects Ltd.

Role : Quantity surveyor (Mechanical)

Project : Home office (Preparing Daily Reports Manpower,equipment and weekly report for TCF)

Client : Aramco

Duration : July 2020 to Present

Location : Chennai.

EXPERIENCE PROFILE

Organization : Snamprogetti Saudi Arabia Co.LTD.,

Role : Quantity Surveyor (Mechanical)

Project : Home office (Preparing Daily Reports Manpower,equipment and weekly report for TCF)

Client : Aramco

Duration : April 2019 To July 2020

Location : Kingdom of Saudi Arabia.

EXPERIENCE PROFILE

Organization : Snamprogetti Saudi Arabia Co.LTD.,

Role : Quantity Surveyor

Project :Utility Off Site Packages (UOSP Project)

Client : Petro Rabigh

Duration : March.2018 To Dec 2018

Location : Kingdom of Saudi Arabia.

Area of Expertise:

Familiarity with Industry Standards such as ASME, API, ASTM, ISO

Provide Cost Estimates to support conceptual engineering project identification and option selection studies for new proposals.

Preparing monthly report on Cost Analysis, Value of Work Done and Projections for the coming month

Preparing Yearly Cost Escalation Report, Reward Calculations for completed projects.

Preparing Cost Estimate in accordance with Engineering Work Manual requirements and Scope of

Work for Process Piping and Flow line (CS, SS, GI, GRE) Projects, Maintenance of Piping, Rotary and Static Equipment, Refractory & Insulation works for Heaters.

Preparing Cost Estimating Methodology Statement.

Provide Support and Cost Engineering expertise to Site Design Office during project design phase.

Calculating the projected budget for the work and informing about the same to planning and Construction.

Obtain budget quotations from material and equipment vendors approved by Client, evaluate the cost and prepare inputs for Cost Containment Estimates.

Preparing final measurements from the supplied as built Drawing

Calculating final Invoice for the Project as per scope.

Allocating Jobs to Sub-Contractors as per Company Policy and track and manage the Work Order to Completion.

Preparing Daily Time for jobs done on Time-sheet basis according to the Daily Production Report from Construction.

Liaoning with Client and Construction for the initiation and completion of Projects.

Track Completion Milestones.

Maintaining a Structured Database of all cost information’s, estimates and costing data.

JOB RESPONSIBILITY

Preparing Cost Estimate for the proposed works and getting the same approved by the Client and receive the Purchase Order for the approved job and finally handing it over to Site Planning Engineering for Job Execution.

Preparing cost estimates for Preventive and Corrective Maintenance activities for static and rotary equipment’s (Beam pumps, PCP, ESP, Tanks, Heaters, Heat-Exchangers, Compressors, Vessels, Valves, Gas and Water Injection Wells, etc.)

Preparing the final measurements with all relevant back up documents for submission to Client QS.

Inputting the final measurement in the Client SAP based database for approval.

Collecting the approved measurement sheets from Client QS and informing about the same to HO.

Prepare final bill for all completed projects and getting the same signed off from PDO officials.

Preparing the monthly Value of Work done report for Client and HO information.

Obtain quotations for material, equipment and specialized services for preparation of cost estimates.

Issuing Job Callouts to Sub-Contract’s to include jobs in their scope as per the advice of Planning Engg.

Getting Final Project/Job Completion Certificates duly signed by Client Area Authority.

Maintaining records and documents as per Quality Management System.

PCOS Operator (Project completion system) and

Wits Operator (Welding inspection Tracking System)

Responsibility:

PCOS: 1. Quality Plan

2.Test Planning

3.Updation of Certificate Progress

4.PCOS Reports –Test Progress, Inspection Report Summary

Wits: 1. Daily Production -Fit Up Activity Progress Updation

2.Weld Execution Progress Updation

3.NDT-RT Reports updation

4.Spool Release for Erection

5.Spool Release for Painting

PROJECT DETAILS:

Organization : Saipem India projects Ltd.,

Role : Quantity Surveyor

Duration : Apr.2015 To Present

Location : Chennai.

PROJECT DETAILS:

Organization : Snamprogetti Saudi Arabia Co.LTD.,

Role : Quantity Surveyor

Duration : Oct.2014 To Dec 2015

Project : Wasit, Saudi Arabia

Responsibility:

1.Training given to site peoples for SICON, (PCOS) Activities.

1.PCOS Library Initialization (Quality Plan) According to the given QCP Like Sections,Sub Sections, Families, Tests, Forms, Teams, Documents, Form Index

2.Test Planning

3.Import Inspection Test Plan (ITP) by Manually.

4.PCOS Library Imports, Exports in Excel & PDF

5.Project Completion System (PCOS) Activities Like certificate progress, certificate Imports by

Manually and Import Methods.

6. Exports Reports in PDF Like Inspection Reports Summary, Test Progress, Item Vs Tests, Etc.,

7.Inputting Data’s import and export into the System.

7.QCT Training given for C.O.S.M.O Activities.

PROJECT DETAILS:

Organization : Saipem Kuwait (Site Based),

Role : Quantity Surveyor

Duration : Jan.2015 To Mar 2015

Project : BS171, Kuwait

Responsibility:

1.PCOS Library Initialization (Quality Plan) According to the given QCP Like Sections, Sub Sections, Families, Tests, Forms, Teams, Documents, Form Index

2.Test Planning

3.Import Inspection Test Plan (ITP) by Manually.

4.PCOS Library Imports, Exports in Excel & PDF

5.Project Completion System (PCOS) Activities Like certificate progress, certificate Imports by

Manually and Import Methods.

6. Exports Reports in PDF Like Inspection Reports Summary, Test Progress, Item Vs Tests, Etc.,

7.Inputting Data’s import and export into the System.

PROJECT DETAILS:

Organization : Saipem Abu Dhabi site based

Role : Quantity Surveyor

Duration : Oct.2012 To Jun 2014

Project : Shah Gas Development (SGD)

Client : Abu Dhabi Gas Development Company Ltd. (Al Hosn Gas)

Location : Shah Gas Field, Abu Dhabi.

PROJECT DESCRIPTION

The Shah Arab Field is a large anticline oriented along a NE-SW axis, the new Shah Gas Development (SGD) facilities will be designed to process approximately 1,000 MMSCFD of feed gas. The new facilities under the SGD project are planned to be executed under 10 separate EPC packages. SAIPEM is the responsible contractor for the process package EPC-2 and Sulphur Recovery Package-3 of the Project.

RESPONSIBILITIES

Established the Management Information System (MIS) of the entire project.

Interface with all the disciplines to get various deliverables.

Co-ordinate with all discipline QS to estimate the quantity for progress monitoring and accounting of subcontract

Follow up the project indicators such as, progress, quality certification, NCRs, on a weekly basis.

Monthly Submission of project indicators to client.

Preparing the manpower distribution suitable for the project.

Calculate the productivity and the cost at milestones of the project.

Plan resources and material.

Prepare the schedules and forecast of the project.

Coordinator of Management information and feasibility of the project

Project Progress and Accounts monitoring for subcontract.

KEY ACHIVEMENTS

Has successfully set up Saipem’s MIS for the SHAH GAS project.

Has planned the resources, such a way that it gives maximum productivity and Conserves a lot of time and money.

Effective creation of the work breaks down structure (WBS) for the Project.

EXPERIENCE PROFILE

Employer : F & K Ibrahim Al-Shuwayer & Partner

Position : Piping Engineer cum Quantity surveyor

Inclusive Dates : October 24, 2010 to September 2012

Venue : Kuwait

Job Description:

Joint operation project JO/HC092/FE09, Wafra Trunk lines Replacement. New pipelines 30”, 20”, 16”, 12” for Oil and water line. Handle of seven (7) MP from Sub-centers to Main Gathering Center. Implementation of site safety, Quantity & Quality work procedures. Instruction to ensure all construction activities followed as per approved drawing.

EXPERIENCE PROFILE

Organization : WORLEY PARSONS-ARABIAN INDUSTRIES(JV)

EMC Contractors (PDO, South Oman)

Designation : QUANTITY SURVEYOR-MECHANICAL

Duration : JAN 2009 TO FEB.2010

Venue : SULTANATE OF OMAN

EXPERIENCE PROFILE

Organization : INTEGRAL SERVICES CO.W.L.L.

Client : KUWAIT NATIONAL PETROLEOM CORPN., (KNPC)

MINA-AL -AHAMADHI

EQUATE PETROCHEMICAL COMPANY

(Fluor Daniel Consultants B.V), Kuwait

Designation : MAINTANANCE PLANNING SCHEDULER.

MECHANICAL SUPERVISOR(PIPING).

Duration : OCT.2006 to Dec.2006. (3 months)

Feb 2007 to Sep.2007. (7 months)

Venue : Kuwait.

JOB RESPONSIBILITY

Review of Hydro test Packages, Line checking & Punch listing.

Reviewing the Hydro test packages by means of Support details, As-built Isometric drawings, P&ID, Punch list, Weld map, Welding Report and Pipe internal cleaning Report.

Preparing “As-Built” drawing for the modified piping

To witness, inspect Penetrant and Magnetic particle testing.

To interpret Radiography films.

To witness of ultrasonic testing.

To prepare the Turnover package and checking for final approval.

To witness radiography of welding joints.

To Review of piping Test Isometric Index

To Review of Pressure test Certificate and Calibration Certificate

To witness of Flushing / Blowing Testing

To Review of NDE Report

To Prepare and Review of the Pre hydro test and Post hydro check list

Issuing of Non-Conformance Report (NCR) for the job which are deviating from construction standards.

Project of Modification and Expansion Scope of Wastewater Treatment Plant at Equate Petrochemical Company, Kuwait.

5. EXPERIENCE PROFILE

Organization : NASSER S AL HAJRI CORPORATION.,

Client : SPICHEM –JAC PROJECT

AL-JUBAIL.

(Fluor Daniel Consultants B.V), K.S.A

Designation : QA/QC Engineer

Duration : July 2008 nov.2008(4 months)

Venue : Kingdom of Saudi Arabia.

EXPERIENCE PROFILE

Organization : LEGG & TOWW CORPN.,

Designation : SHIFT ENGINEER FOR ELECTRICAL FORK

LIFITING MACHINES

Client : Chennai port trust (Chennai container terminal)

Duration : 24-June -2003 to 25-September- 2006(3+years)

Venue : Bharathi nagar (Head office), Chennai.

JOB RESPONSIBILITY

BREAKDOWN AND PREVENTIVE MAINTANANCE

To check the checklist from the operator

To check the break light, head light, break hydraulic oil, engine performance

While break down, the break down failure like contactor loose connection, hydraulic tube fault can be rectified.

Break drum seal kit can be changed.

SOFTWARE PROFICIENCY

Operating System : Ms-Dos, MS-office, Windows 2000/NT

Design tools : Auto CAD 2000

PERSONAL DETAILS

Father’s Name : R. RAMASAMY

Age & DOB : 40 Years, 19-10-1981

Sex : Male

Marital Status : Married

Nationality : Indian

Permanent Address : 2/27, Melaiyanargudi,

Mandhai(po),

Mayiladuthurai. (TK)

Language Known : English, Tamil

Passport No. : Z4931083

Place of Issue : Chennai

Date of Issue : 23/08/2019

Date of Expiry : 22/08/2029



Contact this candidate