Jeff Haltiwanger
*** ********* ****, **********, ** 29016 C: 803-***-**** adufjk@r.postjobfree.com
PROFESSIONAL SUMMARY
Focused welder adept at welding and fitting stainless steel and carbon steel short pipes, flanges and couplings. Fast learner who is highly result-driven. Welder extensively trained in MIG/TIG, flux and stick welding. 20+ years experience in fire protection installation and repair. SKILLS
Certified Welder
Forklift and Aerial lift certified
Tool repair and maintenance
Pipe fabrication
Valve repairs
WORK HISTORY
Installer 3/15/2021 - Present
Crawford Sprinkler
Installed fire protection systems
Inspections of systems
Conducted hydrostatic water testing
Repaired and tested fire hydrants
Set ladders, scaffolds and hoists in place for taking supplies to job site Assigned crews, coordinated materials and drawings to complete jobs in a timely manner.
Foreman 04/30/2018 to 03/01/2021
Palmetto Automatic Sprinkler Co. – West Columbia, SC Inspections of systems
Conducted hydrostatic water testing
Repaired and tested fire hydrants
Set ladders, scaffolds and hoists in place for taking supplies to job site Applied chemical solutions and used polishing machines to clean all installation surfaces, equipment, tools, work sites and storage areas. Assigned crews, coordinated materials and drawings to complete jobs in a timely manner.
Maintenance & repair 02/06/2018 to 03/31/2018
Koyo Bearings USA, LLC.
Repair & maintain machinery through out plant
Pipe Welder/Fabricator 09/2016 to 01/2018
Mundy Company – Gaston, SC
Worked during outage to rebuild reactor
Assembled structural forms such as boiler parts and pressure vessels Installed pipe, valves, and fittings
Operated hoists, cranes and power tools to dismantle equipment to find and remove defective parts
Foreman 01/2016 to 08/2016
Aspire Fire Sprinkler
Completed tear-down of existing structures and prepared for new construction Conducted hydrostatic water testing
Requisitioned new supplies and equipment
Repaired and tested fire hydrants
Consistently assumed additional responsibilities and worked extended hours to meet project deadlines
Loaded and unloaded building materials used for construction Set ladders, scaffold and hoist in place for taking supplies to construction area Operated equipment such as threading machine, drills, and forklifts Foreman 10/2012 to 12/2015
Lifeguard Fire Protection
Installed fire protection systems
Inspections of systems
Conducted hydrostatic water testing
Repaired and tested fire hydrants
Set ladders, scaffolds and hoists in place for taking supplies to job site Assigned crews, coordinated materials and drawings to complete jobs in a timely manner
Construction Maintenance-Combination Pipe Welder 09/2011 to 10/2012 International Paper – Eastover, SC
Installed pipe, valves, and fittings
Assembled structural forms such as boiler parts and pressure vessels Clamped, held, tack-welded, heat-bent, ground and bolted component parts to achieve required configurations and positions
Skilled with gas tungsten arc, gas metal arc, flux-cored arc, plasma arc, shielded metal arch, resistance welding and submerged arc welding Foreman 02/2004 to 08/2011
Palmetto Automatic Sprinkler Co. – West Columbia, SC Inspections of systems
Conducted hydrostatic water testing
Repaired and tested fire hydrants
Set ladders, scaffolds and hoists in place for taking supplies to job site Applied chemical solutions and used polishing machines to clean all installation surfaces, equipment, tools, work sites and storage areas. Assigned crews, coordinated materials and drawings to complete jobs in a timely manner.
References upon request