Post Job Free
Sign in

Piping Engineer Qc

Location:
Izki, Ad Dakhiliyah, Oman
Posted:
December 31, 2022

Contact this candidate

Resume:

JUAN A. JUCAR JR.

B-* L-** Tierra Sueno Subdivision

Bgy. Milagrosa Calamba City Laguna Philippines

Mobile number(Philippines):

+639*********

Mobile number (Oman): +968********

e-mail : *******@*****.***

skype : junjucar

CURRICULUM VITAE

CAREER OBJECTIVE:

To obtain a position for QA/QC Piping Engineer, Mechanical (rotating-static, Tank & HVAC Inspector)/Pre-commissioning Engineer (Completion & Turnover) / Field Piping Engineer that leverages my skills and experience as well as to provide a challenging environment that promotes growth and make a strong contribution to organizational goals.

PROFESSIONAL EXPERIENCE:

More than 20 years vast experience in installation, inspection and testing in construction of upstream/downstream Green & Brown Field Oil and Gas Industry, Mining & metals, Petrochemicals, Refineries, Power Plant Projects local and overseas.

Vast experience in underground piping inspections of RTR, GRV, GRE, HDPE and other fiber glass pipes installation and Hydro/Service testing.

Vast experience in underground carbon steel piping fabrication, installation and hydro/pneumatic/service testing.

Vast experienced of above ground piping (Fabrication/Installation) inspection and testing.

Vast experience in mechanical erection (Rotating & Static, Boiler assembly installation) and inspection.

Conversant with international codes and standards for structural / mechanical & piping.

Experienced in HVAC installation, testing and inspection.

Experienced in Tank installation, testing and inspection

Experienced in Steel Structure installations and inspection.

Experienced in pre-commissioning/completion-turnover inspection & testing.

Experienced in Pipe line installation, Inspection and testing.

Experience in Fire Fighting installation and testing.

Experience in Pre-commissioning/commissioning (Mechanical-Piping) functional test/trouble shoot and start-up.

DETAILED EXPERIENCE:

Position : Pre-commissioning Engineer (Mechanical-Piping)

Company : Petrofac LLC (EPC)

Project : OQ8 Petrochemicals Refinery Project (Duqm, Oman)

Date : May 16, 2022 to present

Responsibilities :

Final alignment inspection (ITR) of horizontal & vertical pumps/ motors at process & utility areas with client.

System walk down with client for mechanical package at unit 400 process area.

Final inspection of emergency diesel generator prior to RFSU.

Final inspection of chillers with the client at unit 400.

Final alignment of compressor pump.

Lube oil flushing of compressor pump.

Water flushing of chilled water pipe line return and supply at main control building at utility area.

Start-up of motors & pumps for central control building at utility area (HVAC system).

Functional test/trouble shoot of HVAC system at central control building and MCOB.

Monitoring of HVAC system for pumps, motors, AHU’s and chillers in operation at central control building at utility area.

Position : QC Piping Engineer

Company : GS Engineering & Construction Corporation (EPC)

Project : Liwa Plastic Industrial Complex (LPIC-3) Project Muscat Oman

Date : August 13, 2017 to August 12, 2019k

Responsibilities:

Review Method Statement, Inspection & Test Plan, Procedures

Resolving technical issues at site specifically for U/G and A/G piping.

Resolving NCR’s & Site surveillance issued by the client

Monitor/Control the daily inspection of QC inspectors.

Site surveillance during site erection of underground piping for the early stage of the project including steel structure.

Review material approval request (MAR).

Site surveillance during site erection for above ground piping and witness hydro/pneumatic and service test.

Witness Welders Qualification Test for HDPE pipe.

Witness valve seat leak test for manual valve & on-off control valve.

Witness bolt torque and tensioning.

Witness internal cleaning/pigging/filling & hydro test for Lean & Rich gas pipe line.

Witness hydro test for Lean and Rich gas pipe line.

Material receiving inspection of incoming materials from vendors and local purchase order.

Position : QC Piping Engineer

Company : JGCS Consortium (EPC)

Project : Nghi Son Refinery Complex Project (NSRP), Thanh Hoa Vietnam

Date : October 06, 2014 up to March 31, 2017

Responsibilities:

Review Method Statement, Inspection &Test Plan, Procedures.

Witness Welders Qualification Test (WQT)

Review Welding Procedure Specification (WPS)

Witness Welding Procedure Qualification Test (WPQT).

Review Project Quality Plan.

Review method statement installation of Piping/Structural/Mechanical

Review method statement of Painting/Wrapping and Temporary Facilities.

Witness fit-up and visual inspection of welding joint at site and fabrication shop for UG CS piping.

Witness hydro test of UG CS piping for cooling water and GRE/GRV/GRE for sewer lines.

Inspection of Quality Monitoring each sub-contractors.

Review method Statement of crude oil pipe line inspection and pigging.

Inspection/review of Quality Monitoring to each sub-contractor.

Review of hand over document from piping to civil for UG piping hydro test and leak test done prior to back filling.

Witness Hydro/Pneumatic Test for UG/AG steel & GRE piping.

Position : Mechanical Specialist (Piping & HVAC)

Company : SEPAM (EPC)

Project : SADARA Petrochemical Project, Jubail Saudi Arabia

Date : April 15, 2014 up to July 10, 2014

Responsibilities:

Witness hydro test for Chilled Water Supply and Return underground GRE piping.

Inspection of joint barcol hardness test lamination for GRE underground pipes prior to hydro test.

Witness Light Test of HVAC metal duct at ERB building.

Conduct material inspection of AHU/FSD/VAV and other components of HVAC.

Close out of issued NCR’s /Surveillance Reports by the client.

Inspection of metal duct installation and accessories.

Position : QC Piping Inspector

Company : Saipem eni (EPC)(Global Petro project Services-GPS)

Project : Shah Gas Development Project Package 2&3 (Abu Dhabi, UAE)

Date : March 23, 2013 up to December 22, 2013

Responsibilities:

Witness hydro testing for underground piping and bolt torque test inspection of riser spools prior to backfilling and witness also water flushing.

Surveillance during site erection/installation of above ground piping.

Witness bolt torque inspection for all lethal service line prior to hydro/pneumatic test.

Witness hydro & pneumatic test for above ground piping and underground GRE piping.

Position : Associate Commissioning Engineer (Piping/Mech’l.)Specialist II Company : Fluor Canada Ltd. (EPCM)

Project : Copper & Gold Mining Project Oyu Tolgoi, Mongolia

Date : April 25, 2012 to September 30, 2012

Responsibilities:

Lead in Piping &Mechanical daily Final System Walk Down of every system prior to hand over to the owner/company.

Lead in Piping & Mechanical daily walk down inspection of every sub-system.

Inspection/clearing of punch list (Mechanical/Piping/Electrical/Civil/Structural/Instrument &Telecom) raise during sub-system walk down prior to final close out and hand over prior to commissioning stage of the project.

Review of as-built drawings IFC (issued for construction).

Witness Pre Commissioning activities for piping and mechanical discipline.

Review of Sub-System Packages for interim turnover notice (ITN) prior submission to turn over of custody and control certificate (TCCC) (Turnover/Completion) acceptance.

Witness of Heat Tracing Panel (HTP) functional acceptance and Electrical Heat Tracing (EHT) functional acceptance and energize of the system.

Review ITR of all test completed of system leak test, Loop check test, air blowing and other test during the pre-commissioning phase of the project.

Position : QC Piping Engineer

Company : GS Engineering & Construction Company (EPC)

Project : Ruwais Refinery Expansion Project (Takreer), Ruwais Abu Dhabi, UAE

Date : June 02, 2011 to March 24, 2012

Responsibilities:

Representative for Materials & Vendor equipment inspections.

Additional areas of responsibilities handle the Alkylation and Olefins Conversion area for piping & mechanical inspections and hydro/pneumatic/service for above ground & underground piping.

Assigned & handles at RFCC-Unsaturated LPG Treating & Whole Cracked Naptha Hydro treating with 3.6 billion US dollar project for supervision/inspection of mechanical-piping erection and testing.

Performing piping inspection at fabrication shop during the early stage of the project.

Coordinates with other departments for any related work activities to resolve some technical issues.

Witness hydro/pneumatic testing for underground and above ground piping performed by sub-contractors.

Perform final line checking /approval of test package of underground GRE line and above ground piping prior to hydro/pneumatic testing.

Position : QC Engineer - Piping/Welding /Mechanical

Company : GS Engineering & Construction Company (EPC)

Project : Green Diesel Project (Takreer), Al Ruwais Abu Dhabi, UAE

Date : January 21, 2010 to April 30, 2011

Responsibilities:

Assigned and handle process area 803 and 801 vacuum Tower with 1.6 billion US Dollar project.

Witness WQT/PQR testing of sub-contractors at fabrication shop.

Witness inspection/testing particularly on piping work, hydro/pneumatic testing, aside from piping inspection also mechanical inspection like rotating & static inspection.

Handles also structural inspections.

I'm also do commissioning turn over punch list during the pre-commissioning period of the project.

Line checking of test packages prior to hydro/pneumatic testing.

Final inspection of piping to be coupled with mechanical equipment, pumps and motors prior to pre-commissioning/commissioning of the project.

Close out of non-conformance report (NCR) raised by the PMC/client for some issues.

Perform final line checking /approval of test package of underground GRE line and above ground piping prior to hydro/pneumatic testing

Position : Field Piping Engineer

Company : Eastern Bechtel Company Ltd. (EPC)

Project : Onshore Gas Development-III Project, Habshan, Abu Dhabi

Date : August 13, 2007 to July 30, 2009

Responsibilities:

Performs engineering works, prepares field change notice as per actual site condition.

Review and as-built of isometric drawings as per site condition during the site installation of above & underground piping.

Witness quality control inspection and site surveillance during installation works of above ground & underground piping works.

Line checking of test packages prior to hydro/pneumatic testing.

Witness hydro/Pneumatic testing of low & high pressure lines together with the client.

Review and approved test package of underground GRE pipe and above ground steel piping prior to hydro/pneumatic testing

Involved in system walk down during pre-commissioning stage of the project.

Position : Piping Engineer / Inspector

Company : Chiyoda Technip Joint Venture (CTJV) (EPC)

Project : Qatar Gas, ConocoPhillips & Shell (QG3 & 4), Ras Laffan, Doha State of Qatar

Date : October 01, 2006 to May 30, 2007

Responsibilities:

Handles fabrication of underground pipe line 114" dia. main water supply.

Responsible of all underground hydro/pneumatic/service testing.

In charge in fabrication of riser pipes.

Witness holiday test for the underground piping prior to backfilling.

Supervise fabrication of GRE pipes up to site installation and witness hydro test prior to back filling of the line.

Position : Mechanical - Piping Engineer

Company : EEI Corporation

Project : P20-2 Refinery Project, Pilipinas Kao Inc. Jasaan Mindanao Philippines

Date : February 06, 2006 to September 10, 2006

Responsibilities:

Review/line checking of test packages prior to hydro/pneumatic testing.

Prepares/review as-built of isometric drawing as per actual site condition.

Witness hydro/pneumatic test of a certain test packages of piping together with client.

Prepares materials/equipment in preparation of hydro/pneumatic testing.

Line checking of test packages prior to hydro/pneumatic testing.

Position : Piping Engineer/ Inspector

Company : EEI Corporation

Project : Expansion Project Ethylene Plant Boiler 7 & 8, Jubail KSA

Date : August 15, 2005 to January 03, 2006

Responsibilities:

In charge in the fabrication of spools at fabrication shop and doing visual & dimensional inspections.

Witness hydro/pneumatic testing at site together with the client.

Review/tracking of welder’s rejection rate of each spools fabricated.

Perform final line checking /approval of test package of underground GRE line and above ground piping prior to hydro/pneumatic testing.

Position : Mechanical – Piping Engineer

Company : EEI Corporation

Project : Air Fluidized Bed Boiler Project (AFBB), Nestle Philippines

Date : January 16, 2005 to August 01, 2005

Responsibilities:

Prepares rigging plan prior to erection of mechanical equipment.

Supervise the assembly of fire tube boiler for the expansion of the existing company.

Review of test packages for piping prior to hydro/pneumatic testing.

Responsible as project engineer for the execution of the project in all discipline.

Supervise the installation of insulation for piping & mechanical equipment.

Perform final line checking of test packages prior to hydro/pneumatic/service testing.

Witness hydro/pneumatic/service testing.

Position : Field Piping Engineer

Company : EEI Corporation

Project : De-bottle neck Project, Yanbu KSA

Date : January 03, 2004 to December 27, 2004

Responsibilities:

Prepares/review as-built of isometric drawing as per actual site condition.

Supervise actual site installation/erection of mechanical equipment.

Prepares of field change notice/site instruction and technical query.

Calculation/material take-off of isometric drawing prior to purchase of materials to be used in the project.

Line checking of test packages prior to hydro/pneumatic testing.

Position : Piping Engineer

Company : Al Rushaid Construction Company

Project : Ethylene Plant Project, Jubail kingdom of Saudi Arabia

Date : December 20, 2002 to December 20, 2003

Responsibilities:

Prepares schedule of activities and review of test packages.

Review isometric drawings & making as-built with latest revisions prior to issue for construction.

Supervise at site installation/erections of piping and mechanical equipment.

Prepares as-built of isometric drawing as per actual site conditions.

Position : Piping/Welding Engineer/Inspector

Company : Al Rushaid Construction Company

Project : Ethane Recovery Project (Berri Gas Plant), Jubail kingdom of Saudi Arabia

Date : June 17, 2001 to November 04, 2002

Responsibilities:

Reviewing isometric drawings with the latest revisions prior to issue for constructions.

Review WPS and witness WQT.

Prepares field change notice and design/material take-off/calculate of additional materials.

Supervise at site installation of piping and erection of mechanical equipment.

Line checking of test packages prior to hydro/pneumatic testing.

Perform final line checking /approval of test package of underground GRE line and above ground piping prior to hydro/pneumatic testing

Position : Mechanical –Piping Engineer / Inspector

Company : Al Rushaid Construction Company

Project : Ghazlan II 4 x 600 MW Power Plant Project, Juaymah kingdom of Saudi Arabia

Date : February 04, 2001 to June 16, 2001

Responsibilities:

Supervise and handle the chlorination building for the installation of piping (GRE, PVC, CS & SS) materials and tanks, pumps & motors.

Witness hydro/pneumatic of underground GRE piping from intake Area going to chlorination building.

Supervise the fabrication of GRE pipes and installation.

Line checking of test packages prior to hydro/pneumatic testing.

Witness hydro/Pneumatic test of underground & above ground piping.

Position : QC Engineer Piping/Inspector

Company : EEI Corporation

Project : Petron Refinery Expansion Project (CCRU & SRU) Bataan Philippines

Date : February 24, 1999 to December 28, 2000

Responsibilities:

Witness/inspection of visual and dimensional of spools fabricated at fabrication shop.

Supervise at site installation/erection of piping and mechanical equipment.

Line checking of test packages prior to hydro/pneumatic testing.

Witness hydro/pneumatic testing of a certain test packages.

Witness water flushing and air blowing.

Witness hydro & pneumatic test for above ground piping and underground GRE piping.

Position : QC Engineer Piping/Inspector

Company : EEI Corporation

Project : Petron Bataan Refinery Expansion Project (PBR) Bataan, Philippines

Date : June 15, 1998 to February 02, 1999

Responsibilities:

Inspection of visual/dimensional of spools fabricated at fabrication shop.

Line checking of test packages prior to hydro/pneumatic testing.

Witness of hydro/pneumatic test of a certain test packages together with the client.

Witness water flushing/air blowing after testing of a certain test packages.

SCOPE OF TRAINING:

Position : Mechanical Draftsman

Company : Bacnotan Cement Corporation (BCC), Bacnotan, Philippines

Project : Maintenance (Engineering Department)

Date : November 1997 to March 1998 (Contractual)

COMPUTER SKILLS:

Microsoft Word and Microsoft Excel

Power point

Auto CAD (basic)

CHARACTER REFERENCES:

Paul Grimwood Liwa Plastic Industrial Complex Project (EPC-3)

Construction Lead, Bechtel OG&C, Orpic Liwa EPC Pkg 3 Muscat Oman

Song Ju Ryong Liwa Plastic Industrial Complex Project (LPIC-3)

Field Quality Manager Fahud Muscat Oman

Hurless Clouatre Fluor Canada Ltd.

Pre-operation Manager Vancouver Canada

Randy Clouatre Fluor Canada Ltd.

Turnover Coordinator Vancouver Canada

Newlito Limuel Diaz Fluor Canada Ltd.

Completion Manager Fluor Philippines

Engr. Cliff Greer Eastern Bechtel Company Ltd.

Engineering Manager United Kingdom, London

Engr. Efren Ibanez Bechtel Construction Operations, Inc. (BCOI)

Technical Welding Representative 12/F 6750 Ayala Avenue, 1226 Makati City Philippines

EDUCATIONAL ATTAINMENT:

Bachelor of Science in Mechanical Engineering

Don Mariano Marcos Memorial State University (SY 1993~1998)

San Fernando City, La Union

Bachelor of Science in Industrial Technology (Major in drafting)

Don Mariano Marcos Memorial State University (SY 1988~1993)

San Fernando City, La Union

Secondary Curriculum

Don Mariano Marcos Memorial State University (SY-1983~1987)

San Fernando City, La Union

PERSONAL INFORMATION:

Name : Juan A. Jucar Jr.

Birth date : October 23, 1969

Address : B-1 L-48 Tierra Sueno Subdivision Bgy. Milagrosa Calamba City, Laguna

Age : 52

Civil Status : Married

Citizenship : Filipino

Mother’s Name : Mrs. Milagros A. Jucar

Father’s Name : Mr. Juan A. Jucar Sr.

Language spoken: English

Person to contact in case of emergency : John A. Jucar

Cell Phone number: +639*********

Professional Driver’s License: K02-08-003547 (restriction code – 1&2)

Passport number: P5868025A



Contact this candidate