JUAN A. JUCAR JR.
B-* L-** Tierra Sueno Subdivision
Bgy. Milagrosa Calamba City Laguna Philippines
Mobile number(Philippines):
Mobile number (Oman): +968********
e-mail : *******@*****.***
skype : junjucar
CURRICULUM VITAE
CAREER OBJECTIVE:
To obtain a position for QA/QC Piping Engineer, Mechanical (rotating-static, Tank & HVAC Inspector)/Pre-commissioning Engineer (Completion & Turnover) / Field Piping Engineer that leverages my skills and experience as well as to provide a challenging environment that promotes growth and make a strong contribution to organizational goals.
PROFESSIONAL EXPERIENCE:
More than 20 years vast experience in installation, inspection and testing in construction of upstream/downstream Green & Brown Field Oil and Gas Industry, Mining & metals, Petrochemicals, Refineries, Power Plant Projects local and overseas.
Vast experience in underground piping inspections of RTR, GRV, GRE, HDPE and other fiber glass pipes installation and Hydro/Service testing.
Vast experience in underground carbon steel piping fabrication, installation and hydro/pneumatic/service testing.
Vast experienced of above ground piping (Fabrication/Installation) inspection and testing.
Vast experience in mechanical erection (Rotating & Static, Boiler assembly installation) and inspection.
Conversant with international codes and standards for structural / mechanical & piping.
Experienced in HVAC installation, testing and inspection.
Experienced in Tank installation, testing and inspection
Experienced in Steel Structure installations and inspection.
Experienced in pre-commissioning/completion-turnover inspection & testing.
Experienced in Pipe line installation, Inspection and testing.
Experience in Fire Fighting installation and testing.
Experience in Pre-commissioning/commissioning (Mechanical-Piping) functional test/trouble shoot and start-up.
DETAILED EXPERIENCE:
Position : Pre-commissioning Engineer (Mechanical-Piping)
Company : Petrofac LLC (EPC)
Project : OQ8 Petrochemicals Refinery Project (Duqm, Oman)
Date : May 16, 2022 to present
Responsibilities :
Final alignment inspection (ITR) of horizontal & vertical pumps/ motors at process & utility areas with client.
System walk down with client for mechanical package at unit 400 process area.
Final inspection of emergency diesel generator prior to RFSU.
Final inspection of chillers with the client at unit 400.
Final alignment of compressor pump.
Lube oil flushing of compressor pump.
Water flushing of chilled water pipe line return and supply at main control building at utility area.
Start-up of motors & pumps for central control building at utility area (HVAC system).
Functional test/trouble shoot of HVAC system at central control building and MCOB.
Monitoring of HVAC system for pumps, motors, AHU’s and chillers in operation at central control building at utility area.
Position : QC Piping Engineer
Company : GS Engineering & Construction Corporation (EPC)
Project : Liwa Plastic Industrial Complex (LPIC-3) Project Muscat Oman
Date : August 13, 2017 to August 12, 2019k
Responsibilities:
Review Method Statement, Inspection & Test Plan, Procedures
Resolving technical issues at site specifically for U/G and A/G piping.
Resolving NCR’s & Site surveillance issued by the client
Monitor/Control the daily inspection of QC inspectors.
Site surveillance during site erection of underground piping for the early stage of the project including steel structure.
Review material approval request (MAR).
Site surveillance during site erection for above ground piping and witness hydro/pneumatic and service test.
Witness Welders Qualification Test for HDPE pipe.
Witness valve seat leak test for manual valve & on-off control valve.
Witness bolt torque and tensioning.
Witness internal cleaning/pigging/filling & hydro test for Lean & Rich gas pipe line.
Witness hydro test for Lean and Rich gas pipe line.
Material receiving inspection of incoming materials from vendors and local purchase order.
Position : QC Piping Engineer
Company : JGCS Consortium (EPC)
Project : Nghi Son Refinery Complex Project (NSRP), Thanh Hoa Vietnam
Date : October 06, 2014 up to March 31, 2017
Responsibilities:
Review Method Statement, Inspection &Test Plan, Procedures.
Witness Welders Qualification Test (WQT)
Review Welding Procedure Specification (WPS)
Witness Welding Procedure Qualification Test (WPQT).
Review Project Quality Plan.
Review method statement installation of Piping/Structural/Mechanical
Review method statement of Painting/Wrapping and Temporary Facilities.
Witness fit-up and visual inspection of welding joint at site and fabrication shop for UG CS piping.
Witness hydro test of UG CS piping for cooling water and GRE/GRV/GRE for sewer lines.
Inspection of Quality Monitoring each sub-contractors.
Review method Statement of crude oil pipe line inspection and pigging.
Inspection/review of Quality Monitoring to each sub-contractor.
Review of hand over document from piping to civil for UG piping hydro test and leak test done prior to back filling.
Witness Hydro/Pneumatic Test for UG/AG steel & GRE piping.
Position : Mechanical Specialist (Piping & HVAC)
Company : SEPAM (EPC)
Project : SADARA Petrochemical Project, Jubail Saudi Arabia
Date : April 15, 2014 up to July 10, 2014
Responsibilities:
Witness hydro test for Chilled Water Supply and Return underground GRE piping.
Inspection of joint barcol hardness test lamination for GRE underground pipes prior to hydro test.
Witness Light Test of HVAC metal duct at ERB building.
Conduct material inspection of AHU/FSD/VAV and other components of HVAC.
Close out of issued NCR’s /Surveillance Reports by the client.
Inspection of metal duct installation and accessories.
Position : QC Piping Inspector
Company : Saipem eni (EPC)(Global Petro project Services-GPS)
Project : Shah Gas Development Project Package 2&3 (Abu Dhabi, UAE)
Date : March 23, 2013 up to December 22, 2013
Responsibilities:
Witness hydro testing for underground piping and bolt torque test inspection of riser spools prior to backfilling and witness also water flushing.
Surveillance during site erection/installation of above ground piping.
Witness bolt torque inspection for all lethal service line prior to hydro/pneumatic test.
Witness hydro & pneumatic test for above ground piping and underground GRE piping.
Position : Associate Commissioning Engineer (Piping/Mech’l.)Specialist II Company : Fluor Canada Ltd. (EPCM)
Project : Copper & Gold Mining Project Oyu Tolgoi, Mongolia
Date : April 25, 2012 to September 30, 2012
Responsibilities:
Lead in Piping &Mechanical daily Final System Walk Down of every system prior to hand over to the owner/company.
Lead in Piping & Mechanical daily walk down inspection of every sub-system.
Inspection/clearing of punch list (Mechanical/Piping/Electrical/Civil/Structural/Instrument &Telecom) raise during sub-system walk down prior to final close out and hand over prior to commissioning stage of the project.
Review of as-built drawings IFC (issued for construction).
Witness Pre Commissioning activities for piping and mechanical discipline.
Review of Sub-System Packages for interim turnover notice (ITN) prior submission to turn over of custody and control certificate (TCCC) (Turnover/Completion) acceptance.
Witness of Heat Tracing Panel (HTP) functional acceptance and Electrical Heat Tracing (EHT) functional acceptance and energize of the system.
Review ITR of all test completed of system leak test, Loop check test, air blowing and other test during the pre-commissioning phase of the project.
Position : QC Piping Engineer
Company : GS Engineering & Construction Company (EPC)
Project : Ruwais Refinery Expansion Project (Takreer), Ruwais Abu Dhabi, UAE
Date : June 02, 2011 to March 24, 2012
Responsibilities:
Representative for Materials & Vendor equipment inspections.
Additional areas of responsibilities handle the Alkylation and Olefins Conversion area for piping & mechanical inspections and hydro/pneumatic/service for above ground & underground piping.
Assigned & handles at RFCC-Unsaturated LPG Treating & Whole Cracked Naptha Hydro treating with 3.6 billion US dollar project for supervision/inspection of mechanical-piping erection and testing.
Performing piping inspection at fabrication shop during the early stage of the project.
Coordinates with other departments for any related work activities to resolve some technical issues.
Witness hydro/pneumatic testing for underground and above ground piping performed by sub-contractors.
Perform final line checking /approval of test package of underground GRE line and above ground piping prior to hydro/pneumatic testing.
Position : QC Engineer - Piping/Welding /Mechanical
Company : GS Engineering & Construction Company (EPC)
Project : Green Diesel Project (Takreer), Al Ruwais Abu Dhabi, UAE
Date : January 21, 2010 to April 30, 2011
Responsibilities:
Assigned and handle process area 803 and 801 vacuum Tower with 1.6 billion US Dollar project.
Witness WQT/PQR testing of sub-contractors at fabrication shop.
Witness inspection/testing particularly on piping work, hydro/pneumatic testing, aside from piping inspection also mechanical inspection like rotating & static inspection.
Handles also structural inspections.
I'm also do commissioning turn over punch list during the pre-commissioning period of the project.
Line checking of test packages prior to hydro/pneumatic testing.
Final inspection of piping to be coupled with mechanical equipment, pumps and motors prior to pre-commissioning/commissioning of the project.
Close out of non-conformance report (NCR) raised by the PMC/client for some issues.
Perform final line checking /approval of test package of underground GRE line and above ground piping prior to hydro/pneumatic testing
Position : Field Piping Engineer
Company : Eastern Bechtel Company Ltd. (EPC)
Project : Onshore Gas Development-III Project, Habshan, Abu Dhabi
Date : August 13, 2007 to July 30, 2009
Responsibilities:
Performs engineering works, prepares field change notice as per actual site condition.
Review and as-built of isometric drawings as per site condition during the site installation of above & underground piping.
Witness quality control inspection and site surveillance during installation works of above ground & underground piping works.
Line checking of test packages prior to hydro/pneumatic testing.
Witness hydro/Pneumatic testing of low & high pressure lines together with the client.
Review and approved test package of underground GRE pipe and above ground steel piping prior to hydro/pneumatic testing
Involved in system walk down during pre-commissioning stage of the project.
Position : Piping Engineer / Inspector
Company : Chiyoda Technip Joint Venture (CTJV) (EPC)
Project : Qatar Gas, ConocoPhillips & Shell (QG3 & 4), Ras Laffan, Doha State of Qatar
Date : October 01, 2006 to May 30, 2007
Responsibilities:
Handles fabrication of underground pipe line 114" dia. main water supply.
Responsible of all underground hydro/pneumatic/service testing.
In charge in fabrication of riser pipes.
Witness holiday test for the underground piping prior to backfilling.
Supervise fabrication of GRE pipes up to site installation and witness hydro test prior to back filling of the line.
Position : Mechanical - Piping Engineer
Company : EEI Corporation
Project : P20-2 Refinery Project, Pilipinas Kao Inc. Jasaan Mindanao Philippines
Date : February 06, 2006 to September 10, 2006
Responsibilities:
Review/line checking of test packages prior to hydro/pneumatic testing.
Prepares/review as-built of isometric drawing as per actual site condition.
Witness hydro/pneumatic test of a certain test packages of piping together with client.
Prepares materials/equipment in preparation of hydro/pneumatic testing.
Line checking of test packages prior to hydro/pneumatic testing.
Position : Piping Engineer/ Inspector
Company : EEI Corporation
Project : Expansion Project Ethylene Plant Boiler 7 & 8, Jubail KSA
Date : August 15, 2005 to January 03, 2006
Responsibilities:
In charge in the fabrication of spools at fabrication shop and doing visual & dimensional inspections.
Witness hydro/pneumatic testing at site together with the client.
Review/tracking of welder’s rejection rate of each spools fabricated.
Perform final line checking /approval of test package of underground GRE line and above ground piping prior to hydro/pneumatic testing.
Position : Mechanical – Piping Engineer
Company : EEI Corporation
Project : Air Fluidized Bed Boiler Project (AFBB), Nestle Philippines
Date : January 16, 2005 to August 01, 2005
Responsibilities:
Prepares rigging plan prior to erection of mechanical equipment.
Supervise the assembly of fire tube boiler for the expansion of the existing company.
Review of test packages for piping prior to hydro/pneumatic testing.
Responsible as project engineer for the execution of the project in all discipline.
Supervise the installation of insulation for piping & mechanical equipment.
Perform final line checking of test packages prior to hydro/pneumatic/service testing.
Witness hydro/pneumatic/service testing.
Position : Field Piping Engineer
Company : EEI Corporation
Project : De-bottle neck Project, Yanbu KSA
Date : January 03, 2004 to December 27, 2004
Responsibilities:
Prepares/review as-built of isometric drawing as per actual site condition.
Supervise actual site installation/erection of mechanical equipment.
Prepares of field change notice/site instruction and technical query.
Calculation/material take-off of isometric drawing prior to purchase of materials to be used in the project.
Line checking of test packages prior to hydro/pneumatic testing.
Position : Piping Engineer
Company : Al Rushaid Construction Company
Project : Ethylene Plant Project, Jubail kingdom of Saudi Arabia
Date : December 20, 2002 to December 20, 2003
Responsibilities:
Prepares schedule of activities and review of test packages.
Review isometric drawings & making as-built with latest revisions prior to issue for construction.
Supervise at site installation/erections of piping and mechanical equipment.
Prepares as-built of isometric drawing as per actual site conditions.
Position : Piping/Welding Engineer/Inspector
Company : Al Rushaid Construction Company
Project : Ethane Recovery Project (Berri Gas Plant), Jubail kingdom of Saudi Arabia
Date : June 17, 2001 to November 04, 2002
Responsibilities:
Reviewing isometric drawings with the latest revisions prior to issue for constructions.
Review WPS and witness WQT.
Prepares field change notice and design/material take-off/calculate of additional materials.
Supervise at site installation of piping and erection of mechanical equipment.
Line checking of test packages prior to hydro/pneumatic testing.
Perform final line checking /approval of test package of underground GRE line and above ground piping prior to hydro/pneumatic testing
Position : Mechanical –Piping Engineer / Inspector
Company : Al Rushaid Construction Company
Project : Ghazlan II 4 x 600 MW Power Plant Project, Juaymah kingdom of Saudi Arabia
Date : February 04, 2001 to June 16, 2001
Responsibilities:
Supervise and handle the chlorination building for the installation of piping (GRE, PVC, CS & SS) materials and tanks, pumps & motors.
Witness hydro/pneumatic of underground GRE piping from intake Area going to chlorination building.
Supervise the fabrication of GRE pipes and installation.
Line checking of test packages prior to hydro/pneumatic testing.
Witness hydro/Pneumatic test of underground & above ground piping.
Position : QC Engineer Piping/Inspector
Company : EEI Corporation
Project : Petron Refinery Expansion Project (CCRU & SRU) Bataan Philippines
Date : February 24, 1999 to December 28, 2000
Responsibilities:
Witness/inspection of visual and dimensional of spools fabricated at fabrication shop.
Supervise at site installation/erection of piping and mechanical equipment.
Line checking of test packages prior to hydro/pneumatic testing.
Witness hydro/pneumatic testing of a certain test packages.
Witness water flushing and air blowing.
Witness hydro & pneumatic test for above ground piping and underground GRE piping.
Position : QC Engineer Piping/Inspector
Company : EEI Corporation
Project : Petron Bataan Refinery Expansion Project (PBR) Bataan, Philippines
Date : June 15, 1998 to February 02, 1999
Responsibilities:
Inspection of visual/dimensional of spools fabricated at fabrication shop.
Line checking of test packages prior to hydro/pneumatic testing.
Witness of hydro/pneumatic test of a certain test packages together with the client.
Witness water flushing/air blowing after testing of a certain test packages.
SCOPE OF TRAINING:
Position : Mechanical Draftsman
Company : Bacnotan Cement Corporation (BCC), Bacnotan, Philippines
Project : Maintenance (Engineering Department)
Date : November 1997 to March 1998 (Contractual)
COMPUTER SKILLS:
Microsoft Word and Microsoft Excel
Power point
Auto CAD (basic)
CHARACTER REFERENCES:
Paul Grimwood Liwa Plastic Industrial Complex Project (EPC-3)
Construction Lead, Bechtel OG&C, Orpic Liwa EPC Pkg 3 Muscat Oman
Song Ju Ryong Liwa Plastic Industrial Complex Project (LPIC-3)
Field Quality Manager Fahud Muscat Oman
Hurless Clouatre Fluor Canada Ltd.
Pre-operation Manager Vancouver Canada
Randy Clouatre Fluor Canada Ltd.
Turnover Coordinator Vancouver Canada
Newlito Limuel Diaz Fluor Canada Ltd.
Completion Manager Fluor Philippines
Engr. Cliff Greer Eastern Bechtel Company Ltd.
Engineering Manager United Kingdom, London
Engr. Efren Ibanez Bechtel Construction Operations, Inc. (BCOI)
Technical Welding Representative 12/F 6750 Ayala Avenue, 1226 Makati City Philippines
EDUCATIONAL ATTAINMENT:
Bachelor of Science in Mechanical Engineering
Don Mariano Marcos Memorial State University (SY 1993~1998)
San Fernando City, La Union
Bachelor of Science in Industrial Technology (Major in drafting)
Don Mariano Marcos Memorial State University (SY 1988~1993)
San Fernando City, La Union
Secondary Curriculum
Don Mariano Marcos Memorial State University (SY-1983~1987)
San Fernando City, La Union
PERSONAL INFORMATION:
Name : Juan A. Jucar Jr.
Birth date : October 23, 1969
Address : B-1 L-48 Tierra Sueno Subdivision Bgy. Milagrosa Calamba City, Laguna
Age : 52
Civil Status : Married
Citizenship : Filipino
Mother’s Name : Mrs. Milagros A. Jucar
Father’s Name : Mr. Juan A. Jucar Sr.
Language spoken: English
Person to contact in case of emergency : John A. Jucar
Cell Phone number: +639*********
Professional Driver’s License: K02-08-003547 (restriction code – 1&2)
Passport number: P5868025A