Asfar Sadiq is SAP Basis Consultant with nearly ** years experience in SAP Implementation, Support and Enhancement projects. Experience includes Implementation, Migration, Upgrade, Production support for various Sap Components, system configuration, Migration, system testing, user training, documentation and post go live support.
Experience Summary
SAP Basis Technical Solution Architect with nearly 14 years of experience in SAP BASIS & Netweaver Technology. I have worked on various projects in BASIS Technology which includes SAP Upgrade & Unicode Conversion, SAP Implementation, OS/DB Migration (DISTMON, MIGMON), Cloud Migration, S/4HANA Conversion, DR Implementation, Database Upgrade, Performance Tuning.
Worked as lead in PBF SAP Instance migration to cloud with degree of recognition. Currently Supporting PBF SAP Instances on cloud infrastructure. Worked as Project lead in Johnson & Johnson Migration / Upgrade projects
Single owner of Solution manager 7.1, 7.2 technical activites and issue resolution. ChaRM coordinator for Weekly CAB.
Experience on HANA 2.0 administration with replication on Azure Cloud.
Experienced in HANA DB - HSR replication setup for HA & DR on AWS and Azure cloud using pacemaker.
Lead in archiving project for System consolidation for PBF.
Excellent communication skills, interpersonal skills, adaptive and self-learner
Analysing and promoting understanding of users and system requirements for business including build plan, test cases, business scenarios, daily communication with business, defect tracking and overall daily status report
Prepared Installation Checklist/design document for System replication, High Availability, Installation, Upgrade, OS-DB Migration, Solution Manager, SLD, etc.. and implemented it successfully
Migrations and Upgrade of SAP Net weaver Systems, GRC and ECC systems. Worked on DR setup (Disaster Recovery) and Solution Manager ChaRM, EWA setup and SMD Wily Installation in J&J ITS Systems along with other Migration activities and solution manager upgrade.
Upgrade SAP systems including ECC, BI, PI, EP, SLD,SCM and Solution Manager
Complex Migration scenarios in SAP Landscape with Table/Package splitting, parellal export/import, Distribution monitoring.
Heterogeneous System copy (OSDB Migration) from AIX/DB2 environment to Red-HAT Linux/Oracle 11g/12c Environment
GRC 10 implementation for full Landscape, integrating with Corporate LDAP and setup the SAML2 authentication
Proficient SAP Solution Manager Implementation and Configuration for Operations. Expertise in Solution Manager Setup, Configuration for Operations, System Monitoring, Technical Monitoring, BPM setup, SMD Agent installation and configuration for System Monitoring, BPM, Technical monitoring, setting up EWA reports for ABAP & Non-ABAP systems, maintenance optimizer configuration for Solution Manager, installation and configuration of CA Wily Introscope and EP Manager, Service desk and CHARM configuration, system monitoring, and performance tuning. Implemented ChaRM in J&J and HDS FM and Supported go-live of FICO, PM, MM module in PBF Energy.
Experienced with Normal operations activities including Database backups and kernel upgrades, System upgrades Client Administration like Client copy, Client Export, Import, Remote Client copies, applying Notes, Support packages, and Add-Ons. Experience on performing SPAM/SAINT, Printers setup with Print Queus.
Strong teamwork orientation with peers and management.
Skills Summary
Domain
Information Technology
Programming Languages
Python
Cloud Technology
Microsoft Azure, AWS
Operating System / ERP Version
Windows (2003 and 2008, 2016, 2019), HP-UNIX, Linux (RHEL & SUSE), AIX
Tools / DB / Packages / Framework / ERP Components
SWPM for OSDB Migrations, SUM for Upgrade and DMO, Solution Manager 7.2 complete configuration, HANA Installation and Administration, HANA Studio, S4Hana maintenance,SAP MaxDB, Content Server, MS SQL 2019, 2008 R2 & 2012 R2, Oracle 10g, 11 and 12c, 19c, IBM DB2, live Cache,, BRTOOLS, ORACLE/SQL, DB400, TIVOLI(Batch job tool), Ticketing Tool (ServiceNow ), SAP MDM, PUTTY, WinSCP, Download Manager
Educational Qualification
Education & Credentials
Bachelor of Technology in Information Technology
Achievement and Certification
Sap Netweaver 7.4 OSDB Certification.
SAP S4 Hana conversion certified.
Received exceptional employee pertaining to Successful cloud migration project for PBF Energy (Torrance Refining company)
PBF SAP Implementation –Team Performance Award
Award for continuous, error free support on GRC N+1 landscape. Appreciation gift from client, Centre of excellence award in JnJ
Project 1
Project Name
PBF SAP Implementation Support (Torrance Refining Company)
Team Size
15
Start Date
Feb’ 2018
End Date
Current
Project Description
SAP Implementation and Support for PBF Energy
Role & Contribution
Role: On-Site Project Lead.
Contribution:
Migrate SAP Instances to Azure Cloud. Lead role in migration project. Cloud Migration of ECC, BW, GRC systems with parellal migration techniques to cloud.
Built and configure Solution Manager 7.2 on cloud for Torrance refining company.
Lead archiving activity in consolidation project of SAP systems.
Built SAP Hana instances with blackfield implementation. Installed S4Hana instance on SAP HANA SPS 04.
System administration, Password manager onboarding to make systems cyber security compliant.
SAP R3 and BoBJ Administration with different landscapes connected with Natted IPs.
Production Refresh and Support Porduction activities.
Manage SAP System and Server and manage all Integration with interfaces.
Support activities including, Business Function Activate, BC Set Activate, Track tranport requests, Backup/Restore on Purescale, Trace analysis.
Manage team activities adhering to Support and bring out prone area critical for the project.
Worked as UC4 Administrator for Background job administration with administering R3 SAP Jobs and OS NT Jobs.
Managed and modified the design of Job Workflows to meet customer requirement and Mentored the Team, Subrdinates in performing the same.
Fine Tuning on Sap system performance.
Managed System Configuration, Early Watch Configuration and Diagnostic agent setup.
Technology & Tools
SAP HANA SPS 04, SAP S4Hana, SAP ECC 6.0 EHP7, BPC 10.5, GRC 10.1, BW 7.0, EP 7.4,Solution Manager 7.2, IBM DB2 11.1, RHEL
Work Experience
Project 2
Project Name
CICP Sap Implementation
Team Size
4
Start Date
May’ 2017
End Date
Jan’2018
Project Description
SAP Implementation for CICP Indian Army
Role & Contribution
Role: On-Site Project Lead.
Contribution:
Installation and Configurationof SAP systems including SAP ECC, BI, PO, SCM, SRM,Portal, BOBJ, Solman, Trex, Content Server and TDMS.
IBM PureScale DB2 Implementation for Production Databases. Install IBM DB2 database with PureScale configuration enabled. Database Encryption and Backup/Restore with compression.
Support activities including Support package/Patches update, Business Function Activate, BC Set Activate, Track tranport requests, Backup/Restore on Purescale, Trace analysis.
Install DB2 Database on MSCS Cluster in Windows Environment.
SNC configuration on all QA/Prod Systems with Secure Client setup. Integration of all SAP systems in landscape .
Implement DFPS ADD-ON in R3 systems.
Troubleshooting problems, change management, escalating open issues, implementing solutions, monitoring of systems, prevention of outages, and optimize the system for maximum performance, resolve complex problems and risks to the environment.
Fine Tuning on Sap system performance.
Managed System Configuration, Early Watch Configuration and Diagnostic agent setup.
Prepare and execute Project plan as lead role for ECC Upgrade for ADTi Project.
ECC System upgrade/GST Notes implementation for ADTi Project.
System Refresh on MS SQL Server for ADTi.
Technology & Tools
SAP ECC 6.0, SCM 7.0, EP 7.4,Solution Manager 7.2, IBM DB2 11.1, AIX 7.1
Work Experience
Project 3
Project Name
Johnson & Johnson (TLM and Crossroad Migration)
Team Size
4
Start Date
Nov’ 2016
End Date
Apr’2017
Project Description
Project for SAP Systems OSDB migration for TLM landscape.
Role & Contribution
Role: On-Site Project Lead.
Contribution:
Lead role in Migration of TLM system
Silent installation with automation of 14 ABAP and 14 Java Systems.
Creation of ICL for the team to perform SAP Silent installation.
F5 Configuration for external load balancing with Web Dispatcher.
Migration of SAP Systems with parellal Export/Import with Table splitting and package splitiing to minimize the downtime.
Submission of NAS/SAN requests for server provisioning and ensure cost effective Server Sizing.
Utilize Advance Migration techniques to disctribute CPU load during migration on different Application Servers.
Troubleshooting problems, change management, escalating open issues, implementing solutions, monitoring of systems, prevention of outages, and optimize the system for maximum performance, resolve complex problems and risks to the environment.
Single Sign on between ECC and Portal with SSL and SNC activation.
Migration with Backup – Restore method for ECC and EP
Solution manager On Boarding of systems.
Optimized downtime with Parallel migration use
Managed System Configuration, SLD Configuration, Maintaining SLD and LMDB as Data Sources for SAP Solution Manager, Early Watch Configuration and Diagnostic agent setup
Lead role in Migration of Crossroad systems
Crossroads Migration of ECC and Enterprise Portal Systems
F5 Configuration for external load balancing with Web Dispatcher
Single Sign on between ECC and Portal with SSL and SNC activation.
OS Migration of SAP system on Linux from UNIX.
Solution manager On Boarding of systems.
Interface handling including Web Methods / Informatica
Direct Database connections handling
Integration with Web Method and Informatica and resolving related issues.
Configure Print Queues and migration of Print queues on SDDC server.
Configure and maintenance/configuration of RF Devices
Optimized downtime with Parallel migration use
Technology & Tools
SAP R/3 4.7, ECC 6.0, Solution Manger 7.1, Net Weaver 7.1, 7.3, HP UNIX, Oracle11g, 12c, SCM 5.0, BI 7.3, Linux RHEL, Linux SUSE
Project 4
Project Name
Johnson & Johnson, Fiori Implementation and Oursource/Solar SDDC Migration
Team Size
6
Start Date
Mar’2016
End Date
Oct’16
Project Description
Solar migration and Fiori implementation
Role & Contribution
Role: Lead
Contribution:
Participating in the technical discussions with Application stake holders
Deeply analyzing the technical issues and preparing Root Cause Analysis.
Manage & support large and complex ERP (Basis & Netweaver) Production Support environment systems.
Applying support packages for various components of SAP systems.
Configure EWA for the satellite systems, download EWA reports and implement as suggested.
Plan, design and execute projects like installations, support pack upgrade/update and System refreshes
Migration of ECC 4.7 from Windows to Linux RHEL
Table Splitting for optimized downtime
Migration between 2 DCs (Brazil and Raritan US) for Solar Systems
Solman Integration migration activities.
Backup/Restore with both Export/Import, DB Restore method.
ECC Localization, Pre-upgrade checks
Fiori implementation built of new systems as Netweaver Gateway
SAML configuration for Single signs on between F5 Network component and Fiori and backend systems.
Single Sign on between ECC, BI and NGW Abap.
SSL configuration for all systems in landscape with J&J roots ca.
SNC activated on all systems.
OS Migration of SAP system (ECC, BI and NGW) on SDDC and perform localization.
Solman Integration migration activities Installation of Solution Manager 7.1 CHARM,CTS+, Monitoring, Early Watch, Landscape Management configuration, Implementation of Industry Solutions
Week end activities like Changing the Database archive mode ON & OFF, SAP systems restart, Resizing database and log files in Sybase database systems
Installation of SAP system with HANA database, Performed SLT configuration from Source to SLT to HANA system.
Performing HANA Backups using HANA Studio as well as scheduling backups from DBACOCKPIT,
Performing HANA database Restore/Recovery using command line and HANA Studio.
Settings parameters as per SAP Standard recommendations for HANA database.
Java administration Java user administration and parameter setting using config-tool, visual administration, UME
Technology & Tools
SAP HANA, SLES 11.02, SLT, SAP R/3 4.7, ECC 6.0, Solution Manger 7.1, EHP 7 ECC 6.0, SAP BI 7.0, SAP, SAP HANA studio, Windows 2003
Project 5
Project Name
Johnson & Johnson, Solution Manager POC and GRC N+1 Landscape
Team Size
6
Start Date
Jun’15
End Date
Feb 2016
Project Description
HANA Appliance and Database operations
Role & Contribution
Role: Lead.
Contribution:
Completed RFC Harmonization with Demo.
Performed end to end POC on technologies like SEA (Sequential analyzer) and TEA (Transport execution analyzer)
Configured QGM for selected satellite systems.
Configured ccts on solution managers with clustering ECC and BI landscapes.
Configured CTS Plus on HANA, BOBI and Portal systems
Buffer management, database table space monitoring, finding hardware bottlenecks.
Check DB growth, archive directory and adding data files.
Performed Kernel upgrade, SPAM/SAINT version upgrade and applied support Packages,
Extensively worked with config tool, visual admin tool and Configure JCO-RFC connections.
System copy from Dev and QA to Newly built Dev/QA systems.
Maintenance of systems with activation of GRC components.
Decommision old GRC system 5.3
Day to Day support from Basis perspective.
SNC configuration, SSl configuration on ABAP systems with GRC comp.
Setup of standalone web dispatcher.
Basic configuration on GRC setup.
ADS configuration on GRC ABAP systems
Hooking up satellite systems with Solution Manager.
Web Dispatcher Kernel Upgrades.
Scheduling of background jobs and spool administration.
Configured Central User Administration (CUA) to create and manage users centrally.
Setting up of Operation Modes & maintaining for a better performance of the systems and configuring log on load balancing.
SAP R/3 System Performance Monitoring & Fine tuning through Instance Profile parameters.
Configured and maintained RFC connection between the systems.
Cordinate Importing the change requests between the systems in the landscape and other systems which are not in the landscape..
Client Administration - Local, Remote copies, client import & export at SAP.
Technology & Tools
ECC6.0, Net-Weaver, BI, EP, HANA, Solution Manager
Project 6
Project Name
Johnson & Johnson, Global Solution Manager Upgrade
Team Size
3
Start Date
Nov’14
End Date
May’15
Project Description
Global Solution Manager Upgrade and Migration
Role & Contribution
Role: Onsite-Lead.
Contribution:
Solution Manager upgrade with SUM tools
Migration of DEV and QA solman to build N+1 environment.
Upgrade Dev / QA Solution manager systems with SUM tool.
Solman_setup wizard after import.
Perform post import activities.
Onboarding around 15 SAP instance for Charm configuration on solution manager.
Portal Backup/Restore with both Export/Import and DB Restore method.
SSO configuration in solution manager required.
Creation of Installation checklists (ICL) to onboard the satellite system in solution manager.
Create Installation Checlists (ICL) to configure CTS Plus on Portal, Hana, BOBI and ChaRM Integration
Coordinate with security and functional team for onboarding.
Upgrade of Production Solman system in final cutover and performed PVT with on-boarded system. Installed Open text Server, Monitoring the systems and integrating with cFolders
Performed EHP1 and EHP4 upgrades.
Documenting all the major activities including installations, Upgrading and configurations for future reference.
Prepared the document and performed the installation of Solution Manager 7.0,Configured the Initial and basic setup of solution Manager & Maintenance Optimizer Configuration and Approve the support package
Performed the Installation of SAPRouter and Maintained the systems into “Saproutab” file& Checking the OSS,SAML connection and correct the errors
Cordinate transports and troubleshooting.
Client copy, export/import, deletions.
User Maintenance : Creating Users and Assigning Roles to them
Creating and importing the Transport Requests for the Roles.
Defining user traces and also analyzed the traces for missing authorizations.
Troubleshooting the authorization related problems.
Scheduling the background jobs, checking the status of the background jobs and troubleshooting the background job issues.
Offline and online Deployment / Undeployment with SDM.
Configuration of RFC between R/3 and Java.
Java administration Java user administration and parameter setting using configtool, visual administration, UME.
Configured satellite systems in Solution Manager.
Technology & Tools
Solution Manager 7.1, Oracle and HP-UX, Linux
Project 7
Project Name
Johnson and Johnson- Lynx Upgrade and B2B (Back to Basics)
Team Size
7
Start Date
Feb’14
End Date
Oct’14
Project Description
Upgrade of Lynx SAP Systems
Role & Contribution
Role: Associate Consultant
Contribution:
Portal System copy and System Refresh.
Portal Upgrade from 7.01 to 7.31 Release Upgrade
Portal Post Upgrade Localization activities.
SP Stack and Patch updates with SUM tool on Portal.
Portal Solman Integration.
Portal Backup/Restore with both Export/Import, DB Restore method.
SSO, ADS JCos configuration.
ECC EHP4 Upgrade to ECC EHP6 Upgrade.
ECC Localization, Pre-upgrade checks.
BI Dual stack split.
BI Upgrade from 7.0 EHP1 to BI 7.3 EHP1.
Upgrade BI-ABAP, BI-JAVA Separate.
Hooking up satellite systems with Solution Manager.
Web Dispatcher Kernel Upgrades.
SSL Configuration on both ABAP and JAVA Stack.
TREX Configuration, Integration with ECC, CRM systems.
SAP Hana Client installation.
Technology & Tools
SAP ECC, BI, EP, Solman Integration, UNIX/Linux, Oracle 10g
Project 8
Project Name
Johnson and Johnson, Domus Upgrade and Domus Hyper-Care
Team Size
5
Start Date
May’13
End Date
Jan’14
Project Description
Domus Upgrade Project for upgrade of ECC and BI systems
Role & Contribution
Role: Team Member.
Contribution:
ECC Upgrade from 6.0 to ECC 6.0 EHP 6 version.
SSL Configurations on ABAP.
Generate Stack with Solution Manager 7.1.
Localization after System copy.
Complete Pre-Upgrade Checks, Post Upgrade Activities.
TREX Configuration, Integration with ECC, CRM systems.
SSO, ADS JCos configuration.
ECC EHP4 Upgrade to ECC EHP6 Upgrade.
ECC Localization, Pre-upgrade checks.
BI Dual stack split.
Portal System copy and System Refresh.
SSO configuration between portal and ECC/BI.
Support activities in hyper care.
Worked as Portal Administrator. UME configuration, Exchanging certificates with certification Authorities.
Worked as PI Administrator. Post processing activities after system Migration, including Exchange Profiles, Adapter Engine Cache, Cache refresh (Partial/complete), RFCs.
SLD Configuration with all Technical/Business Systems in Landscape.
Normal Production Support activities: Production support activities include managing Transport requests, Error resolution and troubleshooting, I Message Monitoring, Integration with WebMethods.
SMD Wily installation and hooking up satellite systems with Solution Manager.
Technology & Tools
ECC, BI, PI, EP Portal, Solution Manager
Project 9
Project Name
Johnson and Johnson - OurSource Migration
Team Size
11
Start Date
Mar’12
End Date
Apr’13
Project Description
This project is to migrate SAP Systems for J&J from NGA to Raritan Data centre
Role & Contribution
Role: Team Member.
OSDB Migration of SAP Systems from NGA to JNJ Data Center.
Portal System copy and System Refresh.
Alignment of Systems after System Refresh. Post processing activities.
SSO configuration between portal and ECC/BI.
Failover testing and clustering.
ERS (Enqueue Replication Server) Setup
SAML Configuration on Portal.
DR Server setup: DR server setup using Oracle Data Guard technology which ensures high availability, data protection, and disaster recovery for the applications hosted on oracle database.
Worked as Portal Administrator. UME configuration, Exchanging certificates with certification Authorities.
Worked as PI Administrator. Post processing activities after system Migration, including Exchange Profiles, Adapter Engine Cache, Cache refresh (Partial/complete), RFCs.
SLD Configuration with all Technical/Business Systems in Landscape.
Normal Production Support activities: Production support activities include managing Transport requests, Error resolution and troubleshooting, I Messae Monitoring, Integration with WebMethods.
SMD Wily installation and hooking up satellite systems with Solution Manager.
TREX Installation and administration.
Web Dispatcher Installation and administration.
ECC Localization, Pre-upgrade checks.
BI Dual stack split.
Portal System copy and System Refresh.
Alignment of Systems after System Refresh. Post processing activities.
SSO configuration between portal and ECC/BI.
Hyper Care support for Lynx Environment
Restore connection from BI to ECC
Monitoring and troubleshooting regular issues
Technology & Tools
ECC, BI, PI, EP Portal, Solution Manager, Unix/Linux, Oracle
Project 10
Project Name
L&T SAP COE Migration Project
Team Size
2
Start Date
Nov’11
End Date
Feb’12
Project Description
This Project is L&T Internal migration project for SAP components
Role & Contribution
Role: Team Member.
Contribution:
OSDB Migration of SAP ERP Systems.
Prepare project plan
Planning for Migration – Download of required tools, preparation of source system
Performed export using R3load
Performed import using R3load
Post migration validations
Optimization of downtime during export and import
Configure all printers in new environment
Issue resolution
Database administration activities required for migration
Parameters maintenance
Tablespace administrations
Backups of Sap systems conventional way
Portal System copy and System Refresh.
Project 11
Project Name
PBF Energy SAP Implementation
Team Size
3
Start Date
Jun’11
End Date
Nov’11
Project Description
This project is for SAP implementation in PBF Energy. Administration needs to be done 24x7 to support the existing applications and enhance the business.
Role & Contribution
Role: Team Member.
Contribution:
Migration of SAP ERP Systems.
Lead Role in Supporting SAP ECC Environment as BASIS Consultant.
Service Desk and Charm Support: Configured Service Desk (a solution Manager based ticketing tool for Problem management) and Change Request management to minimize manual errors while moving transport requests from Dev to QA and Production.
System Refresh, Client copy: Quality System to get refreshed with Production system every Quarter. Sap Client copy to happen as per clients requirement.
System copy using R3Load method: System copy of ECC system using R3Load method was performed to create a new Training system for end-users for project team education purpose.
Manage Cluster Environment (In Production System): Sap Application server and Oracle database was installed on different Linux RHEL 5.0 servers and need to be managed through clustering
SABRIX Integration for SAP Configuration: SABRIX integration for SAP connects to SAP Standard tax interface and passes specific, predefined transaction data from sap to SABRIX.
DR Server setup: DR server setup using Oracle Data Guard technology which ensures high availability, data protection, and disaster recovery for the applications hosted on oracle database.
Rsync configuration: File system on SAP Application level of actual production system needs to be synchronized with file system of DR server. Rsync is a linux based script which synchronizes file system between two linux servers.
Normal Production Support activities: Production support activities
Worked as Security administrator in close coordination with Functional team members for smooth and hassle free go-live of Delaware and Paulsboro refinery. SAP security design includes security for PM, MM and FI modules in SAP.
Worked in close coordination with SAVVIS (Third party OS and hardware Vendor).
Project 12
Project Name
HDS-FM ChaRM Implementation
Team Size
3
Start Date
Sept’10
End Date
Mar’11
Project Description
This project is used to Implement Change Request Management using Solution Manager in whole HDS-FM SAP Landscape.
Role & Contribution
Role: Team Lead.
Contribution:
Lead Role in implementing ChaRM
Configuration of service desk ticket functionality in Solution Manager, to expedite the problem management process.
Configure CTS+ for Non-ABAP systems: Non ABAP System included EP (Enterprise Portal) and PI (Process integrator) system. CTS+ aims to include movement of Java objects across the landscape using ChaRM through ABAP stack.
Manage every transport movement through Solution Manager and defining the Process.
Enhance Solution Manager capalities.
Configure Solution Manager for Service desk and Integrate Charm.
Lead for the teams.
Project 13
Project Name
Freescale Semiconductors
Team Size
5
Start Date
Sept’09
End Date
Sept’10
Project Description
This project is used to enhance their business and involves production support to end users who were working from US. Working with functional teams to know exact client requirement in designing roles or authorization set up for end users.
Role & Contribution
Role: Team Member.
Contribution:
R3 administration: Normal production support activities like Lock Management, Alert monitoring, scheduling periodic jobs, Background processing, R/3 Buffer monitoring, database monitoring, Verification, troubleshooting of Short Dumps, system logs etc
Applying support packages for various components of SAP systems.
Oracle upgrade from 10.2 to 11.2 on SRM, SCM, PI and EP landscape.
Kernel upgradation for SRM, PI and Portal System.
Daily performance monitoring and Completion of Handover document to record status of systems
Client copy, export/import, deletions.
Changed the Java Parameters either with Visual Admin or Configtool.
Worked with SDM (Software Deployment Manager) for deployment and undeployment of Java objects.
Performed System copy using R3Load method.
Single Sign On (SSO) configuration for ECC 6.0: Configured the portal server for SSO with SAP Logon Tickets. Configured SAP Systems to accept and verify SAP Logon Tickets.
LDAP (Lightweight Directory access protocol) SSO integration: Configured Single Sign-On with LDAP Directory synchronization.
Day-to-day client’s interaction with regards to status reporting on work requests and problem resolution.
Documenting all the major activities including installations, Upgrading and configurations for future reference.
Prepared the document and performed the installation of Solution Manager 7.0,Configured the Initial and basic setup of solution Manager & Maintenance Optimizer Configuration and Approve the support package
Performed SCOT SMTP Mail configuration fo Performed System copy using R3Load method.
Single Sign On (SSO) configuration for ECC 6.0: Configured the portal server for SSO with SAP Logon Tickets. Configured SAP Systems to accept and verify SAP Logon Tickets.
LDAP (Lightweight Directory access protocol) SSO integration: Configured Single Sign-On with LDAP Directory synchronization.
Day-to-day client’s interaction with regards to status reporting on work requests and problem resolution.
Documenting all the major activities including installations, Upgrading and configurations for future reference.
Prepared the document and performed the installation of Solution Manager 7.0,Configured the Initial and basic setup of solution Manager & Maintenance Optimizer Configuration and Approve the support package
Project 14
Project Name
Ingram Micro and L&T Internal Projects
Team Size
3
Start Date
May’09
End Date
Oct’10
Project Description
This project was Support Project with Ingram Micro and other LnT Internal Projects
Role & Contribution
Role: Team Member.
Contribution:
Upgrade SAP ECC, CRM, BI and Portal systems and all systems in landscape (including Test, DEV, QUA and PRD).
Upgrade SAP ECC with EHP1.
Upgraded CRM (Both ABAP and JAVA stack) from SP stack 12 to SP stack 18.
Upgraded ABAP stack with SPAM tool and upgraded java stack with the help of JSPM.
Upgraded Portal systems (EP) from Support pack Stack 12 to support pack stack 18 with the help of JSPM.
System copy of Portal System from production to build new test system to perform upgrade. System copy was done with Export/import method.
Upgraded BI test system with EHP1. Close coordination with all team members performing upgrade.
Captured documentation in detail for every upgrade.
Client copy, export/import, deletions.
Changed the Java Parameters either with Visual Admin or Configtool.
Worked with SDM (Software Deployment Manager) for deployment and undeployment of Java objects.
SAP System Monitoring and Troubleshooting. Daily performance monitoring and Completion of Handover document to record status of systems.
Daily administrative activities such as Lock Management, Alert monitoring, scheduling periodic jobs, Background processing, R/3 Buffer monitoring, database monitoring, Verification, troubleshooting of Short Dumps, system logs etc
Continuous monitoring of Production systems.
SAP Performance Tuning. Performed the performance tuning with fine tuning the profile