Post Job Free

Resume

Sign in

Mechanical Engineer Control Officer

Location:
Quezon City, Philippines
Posted:
February 09, 2023

Contact this candidate

Resume:

Page * of *

Nestor S. Reyes

Mechanical Engineer, Master Plumber, Master Electrician

Experience & training in Construction & Fabrication, Safety, Plumbing & Sanitary Design/ Consultancy, Facilities/Building Management, Project Management, MEPF Coordination

Born: 23 April 1971 E-mail: adu8jr@r.postjobfree.com

Tel.: (632-****-**** Mobile: (063) 949-***-****

Add: 7, Rd 12, Pag-asa, Q.C. 995-***-****

MEPF Engr. JQ Int’l Const’n Corp., 2F, BTTC Centre, Ortigas cor. Roosevelt, San Juan. Aug. ‘18- 15 Oct. ’19 Worked with GenCon’s team handling onsite works of the Congessional Tower 2, a 42 storey mixed use project along Congressional Ave., Q.C., preparing RFI’s and RFA’s for 42 storey mixed use building, dealing with Project Management, Project Owner group, suppliers, and subcontractors.

- Checking plans and coming up with solutions for actual, site condition applications, bridging thegap between plans and actual construction.

- Making project BOQ’s. Attending Weekly Coordination Meetings, Trade Meetings.

-Coordinating with other trades Checked how trades assigned me would be affected by designs/ installations of their associated trades.

CPE-ME ESCA, Inc., 87, 8th Ave., Murphy, Cubao, Q. C. 24 Apr. ‘17- 15 June ’18 Worked with Project. Manager and colleagues, for project completion within budget, schedule, and required quality. of the Php 1.1B National Housing Authority building, along Kalyan Ave, cor. Mayaman St., Q.C.

- Pointed out, and gave solutions for, defficiencies that would otherwise have prevented proj. completion.

- Monitored work progress of Sanitary & Plumbing, MVAC & Active Fire Protection disciplines, for reporting to Senior Quantity Survey Engineer

- Checked how utilities assigned me would be affected by designs/ installations of their associated disciplines.

- Prepared monthly project reports, and helped with issues of these trades between each other.

- Attended Weekly Coordination Meetings, Trade Meetings, witnessed/checked billing reconciliations

- Performed walk-thru progress monitoring/ inspections and prepared subsequent reportings as needed. Freelance Master Plumber Quezon City August 2016 - Apr. 2017 Checking, signing, & sealing Sanitary & Plumbing Plans asopportune. Project & Facilities Head BIGG’S INC.,Zone 2, Fausto Dr., San Felipe, Naga City 02 May-25 Aug.‘16 Charged with Facilities of main office and company owned store

- Saved the company millions by guiding it into making best value for money choice.

- Pointed out & initiated needed changes to improve equipment/ facilities’operations & maintenance.

- Facilitated main kitchen’s easier electrical repair, maintenance, and adjustment by tagging of Panelboards/ Breakers, and prompting of Load Balancing.

- Ended trend of costly breaking down of air conditioners by having electric utility company eliminate single phasing of their supplied power, the culprit in compressors breakdown.

- Got Local Government Authority to look into the cause of flooding of our area, for later repair.

- Prepared the company’s first Air Conditioning Equipment Management Program, which could later be expanded to include vehicles & other equipment.

- Facilitated easier decision making about company equipment by establishing Equipt. History CardSystem.

- Made recommendations for improvement of systems, safety, and loss prevention

- Assisted Purchasing, in equipment selection, acceptance of vendor work, etc. Page 2 of 4

Sanitary & Plumbing Design Engr. ecoSolutions Trade & Financial Tower, BGC Aug. ‘15-23 Feb. ’16

- Designed and/or communicated needed changes in construction stage hi-rise Sanitary & Plumbing projects for Bonfacio Devlopment’s T-PARK, and Ayala’s HIGH STREET SOUTH towers, all in BGC, Taguig.

- Attended Technical/ Design Coordination meetings & processed Requests for Information or RFI’s & Requests For Approval or RFA’s of HIGH STREET SOUTH, T-PARK, and KROMA TOWER, another Ayala devlopment but along Salcedo, Makti.

- Designed lift stations, for slope & elevation issue that came up because of utility company shortcomings and were, because of such complications, were evaded by my more senior colleagues.

- Did adjustment/ correction layouts and mark ups of construction stage projects

- Did Quality Assurance work on projects, helping the other trade designers make needed corrections Project Engineer Manota Engineering Better Living Homes, Bicutan, MM. 2012

- Prepared formal quotations for repairs & watched over roofdeck waterproofing worksof one of the Cityland Towers along Vito Cruz, Manila.

MEPF Coordinator/ Asst. Construction Mgr. APTC Paco, Mla. Mar. ‘’11- 29 Oct. ‘11

- Coordinated Mechanical, Electrical, Plumbing, and Fire Protection works, dealing with client, contractors, designers, and security towards best productivity of fit-out work on the SunLife building in BGC, Taguig.. Bldg. Administrator VAR Buildings, Inc. 6784 Ayala Ave., Mkti. 21 Jul. ‘09- 21 Jan. ‘10 In charge of technical and administrative (facilities/ utilities aspect) matters of the Rufin Building;

- Prepared billings, had them served on time, followed up tenants ondelayed rent payment.

- Made sure facilities were in good working order, watching over such works as equipment repairs, fit-outs / resizing of rentable spaces, etc.

- Kept te\nants at business-as-usual states during/ after otherwise chaotic incidents like bomb threats, etc.

- Dealt with local Authorities like Fire Dept., DENR (served as Pollution Control Officer ), etc. Shift Engr. Building Care Corp. Shaw Boulevard, Mandaluyong City 2005

- Led shift team in maintaining facilities ( Power Plant; Chiller Room, STP, Cooling Towers, AFSS, UV water treatment system, etc.) of prominent, ISO certified tertiary hospital client. Also dealt with specialty outsource maintenance companies like Elevator / Escalator Company, etc. Bldg. Management Supervisor World Citi Medical Center 960 Aurora Blvd., Q.C. Jun.2000 - Feb.2003* Handled administrative (facilities/ utilities aspect) and technical matters of this ISO certified, tertiary hospital.

- Eliminated elevator breakdowns by securing value-for-money maintenance program for it.

- Ended spread of disease between Well Baby, Intermediate, & NICU areas by installing partitions

- Facilitated faster and smoother entry of stretchers into E.R. by building ramp at entrance.

- Reduced electricity and equipment (pump operating) expense by rerouting a drainage line.

- Saved hospital from closure/ Business Permit suspension by Commissioning it’s Fire Code required Automatic Fire Sprinkler System.

- Performed acceptance inspections of contractor works, to protect company interests.

- Prepared maintenance manpower schedules & Served as Company Fire Marshall.

- Cut down operations and maintenance cost by helping purchasing make value-for-money deals.

- Prepared forms, documented procedures of area of jurisdiction, and served as an Internal Quality Auditors for the hospital’s successful ISO accreditation bid. Jr. Mechanical Eng’r EEI Marine Corp.( Subsidiary of EEI CORP.) Bagong Ilog, Pasig, Mar ‘97 - Mar ‘99

-Prepared material take-offs for bids of subsequently awarded projects.

-Conducted Safety Orientations, Toolbox Meetings, & Perormed QA/ QC for Gas Station Project. On-The-Job Trainings::

Power Systems, Inc.,Cummins Engines, Onan Genset distributor: Mand. City QC work, engine audits,etc. HAYAMA, Inc.Quezon City Local construction/ fabrication company serving Coca Cola, Pepsi, SMB, etc. Education :

Polytechnic Univ. of the Philippines-Open University, Units in MS Construction Management. Polytechnic Univ. of the Philippines, Bachelor of Science in Mechanical Engineering (1995) Quezon City Science High School

Government Issued I.D.’s:

Page 3 of 4

TIN: 181-219-469, Pag-IBIG #: 105*********, PhilHealth#: 03-050026248-2, SSS #:33 22 09393-8, UMID: CRN-0033-2209393-8

*Registered Mechanical Engineer 50117, registered 22 May 1996, valid ‘til. 23 April 2024

*Registered Master Plumber 8381, registered 08 Jul. 2015, valid ‘til 23 April 2024

*Registered Master Electrician 54629, registered 11 Feb. 2017, valid ‘til 23 April 2024 Organizations/ Affiliations :

*PSUMP *IIEE *ORMEP *PSME

Some Trainings Taken :

-Design of Chilled Water Piping for Air.. . .. . . . . . . . . . .MEPF Org. OfThePhils Nov. 23, 2019 Conditioning & Cooling Tower Design

- Electrical Safety with Simplified Short Circuit Analysis . . . MEPF Org. Of The Phils . . . . .Apr. 09,2019

-Sizing of Generator, Selection of Controllers, Terminal . . . . IIEE. . . . . . …… .Jan. 19, 2019 Interconnection, & Actual Load Testing of Generators

- Instrumentation & Control . …. . . . . . . . . . . . . . . . . . . . .MEPF Org. Of The Phils . . . . . .Dec.05,2018

- How to Prepare Complete Plumbing . . . . . . . . . . . . . . ..MEPFSEngineers. . . . . . . Feb. 25, 2018 Plan & Documentation

- Automatic Fire Sprinkler System Design . . . . . . . . . . . . .MEPFS Engineers .. . …. . .. . .Feb. 24, 2018

- Project Cost Estimates . . . . . . . . . . . . . . . . . . . . . . . . . . .ENGINEERS .. . . . . .Feb. 10, 2018

- Procurement & Contract Mgt. In Construction . . . . . . . .MEPFS Engineers .. . …. . . . . . .Feb. 3, 2018

- Design of Cold Water Distribution System .. . . . . . . . . . MEPFS Engineers .. . ….. . .Jan. 13, 2018 For Building System & Estimates

- PERT-CPM For Project Scheduling & Monitoring. . . .MEPFS Engineers ... Jan. 6, 2018

- Medical Gas Piping System Design . . . . . . . . . . . . . . . .MEPFS Engineers .. . …. . . . .Jan. 3, 2018

- Electromechanical System for For Failure Control . . . . .ENGINEERS . . . .. . … . . ..Dec. 28,2017

- MEPFS Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . .. ENGINEERS . . . .. . … . . . Dec. 21,2017

- Fire Sprinkler System Design, Estimates, & FDAS. . . . . . MEPFS .. . …. . . . Aug. 27, 2017

- Electrical Design Analysis & Short Circuit Calculation. . .ENGINEERS . . . .. . … . . . .Feb. 18,2017

- Transformer Testing & Maintenance. . . . . . . . . . . . . . … .ENGINEERS . . . .. . … . . . .Feb. 18,2017

- Swimming Pool Design, Operation, & Maintenance . .. .PSUMP, INC. . . . . . . Dec.20, 2016

- Solar for Home Installation Workshop . . . . . .. . . . .. . . . .ENGINEERS. . . . . . . . . . ..Dec. 14, 2016

- Fire System Design & FDAS . . . . …. . . . . . . . . . . .. . . . ENGINEERS . . . . . . . . . .Dec. 7, 2016

- Complete Green Plumbing Design. . . . . . . . ... . . . . . . PSUMP, INC. . . . . . . . . .. . . ..Dec. 4, 2016

- Basic MEPF Design for Mixed Use Building . . . . . . .. . . . ENGINEERS .. . . . .. . . . . . . .Dec. 3, 2016

- Electrical Installation, Audit, & Safety. . . . . . . . . .. . . . . .ENGINEERS . .. . . . . . . . .Dec. 3, 2016

- Common Errors in Plumbing System & Green Plumbing .ENGINEERS . . . Dec. 3, 2016

- HVAC Design, Installation, & Maintenance . . . . . .. . . . . ENGINEERS . . . . . …. ..Nov.20, 2016

- Complete Plumbing Plan Preparation Workshop . ... .. .. PSUMP, INC. . . . . . . . . . . . . . Nov. 13, 2016

- Waste Water/Sewage Treatment Plant Design.. . . .. . . . NEW NAMPAP. . . . . . Jul. 11-12,17-18, 2015

- Fire Protection System for High Rise Bldg. . . . . . . . . . ... NAMPAP. . . . .. . .. . . 15 Sept. 2013

- Domestic Water Syst. Design for High-rise Bldgs. . . . . . .NEWNAMPAP.…. . . . . . . .. 21 April. 2013

- Operation & Maintenance of Fire Sprinkler. . . . . . . . . . .NAMPAP. . . . . . .. . . . . . . . . .. 04 Mar. 2013

- Basic Construction Safety. . . . . . . . . . . . . . . . . . . . . . .. . .EEI Const’n Corp 21 May 2011

- LEED Orientation. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .EEIConst’nCorp 14 May 2011

- Hazard Identification, Assessment, & Control. . . . . . . …EEIConst’nCorp 07 May 2011

- Pollution Control Officer Seminar. . . . . . . . . . . . . . .. . . ..EMB/ WEAP . . . . . . . . .11-14 Aug. 2009

- DOLE-BWC Prescribed 40 Hr. BOSH. . . . . . . . . . . . . ….Devpro Inc.. . . .. . . . . ….. . . 4-8 Dec., 2006

- AutoCAD 2006. . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .‘. .. MicroCADD. . ..06-19, Jan 2006

- Leadership Training. . . . . . . . . . . . . . . . . . . . . . . . . .. . ... World Citi Inc. . . . . . . . .. ….. . . Feb. ‘03

- Industrial Electrician Course. . . . . . . . . . . . . . . . .. . . MERALCO Found’n, Inc. …25 Nov.-20 Dec. 02

- Predictive Maintenance & Condition Monitoring. . . …. Nat’l Engineering Center. . ….19-21 June ‘02.

- ISO 9001 ver. 2000 Awareness. . . . . . . . . . . . . . . . ... ... .WorldCitiInc May ‘02

- Knowledge in Facilities Management. . . . . . . . . . .. . .. Nat’l Eng’g Cntr. . . . .. . .22-25 Apr. ‘02

- Mass Metrology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..… Nat’l Eng’g Cntr. . . ….. . .. . . .25 Apr. ‘01 Page 4 of 4

- Occupational Safety & Health. . . . . . . . . . . . . . . .. . . . ….EEI Const’n Corp.. . . .. ….. . .11 Dec. 1998

- Integrated Engineer’s Development Program. . . . . . EEI Const’n Corp . . . . .Aug. 96 -1 Feb. 97 Character References :

Jovert P. Garovillo

Electrical Engineer

Offc. of the Bldg Official

Offc of The Building Official, Q.C.

CP. (063) 917-***-****

998-***-****

Edgardo G. Kempis

Officer

Manila Electric Company (Ret.)

Ortigas, Pasig City

CP (063) 917-***-****

Noel “Noni” Mananguit

Officer

Globe Telecoms

Globe Tower, BGC, Taguig

CP (063) 917-***-****

Lynnette D. San Gabriel

GSD Head & Chief Dietician

World Citi Medical Center

960 Aurora Blvd., Q.C.

Tel.(632-****-**** L 160

Norberto T. Endab

Admin. Officer V (HR.)

Offc. of the Ombudsman

Agham Rd., Diliman, Q.C.

Tel.(632-****-**** L 225

091*-***-****

Carlos P. Sison, PECE

Professor

Pamantasan ng Lungsod ng Maynila

Intramuros, Manila

CP (093) 999-***-****

All information in this document is true to the best of my knowledge and hereby furnished for your reference. I may be reached @ (063) 949-***-****, or at adu8jr@r.postjobfree.com . Very truly yours,

Nestor Salmon Reyes



Contact this candidate