Ilham Djamaluddin

( Makassar, ** November **** )

Kav. 19 Bumi Purabaya Indah Residence, Letkol G.A Manulang Street, West Bandung Regency, West Java Province, Indonesia 40553 Mobile Cell : +62-085*-****-**** – Email : adu6qm@r.postjobfree.com Summary

Civil Engineering More than 20 Years

Project Manager / Team 15 Months (1 Year and 3 Months) Leader

Civil Superintendent 6 Months

Site Manager 34 Months (2 Years and 10 Months)

Site Engineer 1 8Months (1 Year and 6 Months)

Structural Engineering 41 Months (3 Years and 4 Months) Construction Engineering 46 Months (3 Years and 8 Months) Planner Engineering 6 Months

Quality Engineering 6 Months

Water Resources Engineer 6 Months

Irrigation Engineer 8 Months

Supervisor Engineer 12 Months (1 Year)

Senior Assistant 36 Months (3 Years)

Senior Inspector 9 Months

Assistant Expert 72 Months (6 Years)

Highlight

Project Manager / Team

Leader

“Rehabilitation Feasibility Study of Lais Kuro Tidur Irrigation of North Bengkulu Regency” at Lais River of North Bengkulu Regency, Bengkulu Province, Indonesia ( 8 Months ) As Consultant in PT Sarana Badja Bumi, Bandung, West Java Province, Indonesia

“ Rappang Market Project ” at Rappang Regency, South Sulawesi Province, Indonesia and “ Section IV Toll Reformation Project “ at Makassar City, South Sulawesi Province, Indonesia ( 7 Months ) As Contractor in PT. BLOEDUS Management Indonesia ( BOSOWA Group ), Makassar City, South Sulawesi Province, Indonesia Civil Superintendent ” Donggi Senoro LNG Project “ at Uso Sub-District, Luwuk Regency, Centre Sulawesi Province, Indonesia “ ( 6 Months ) As Contractor in PT. SEKAWAN KONTRINDO, Palembang City, South Sumatera Province, Indonesia

Site Manager ” Sure Center Building Project “ at Serpong, Tangerang Regency, Banteng Province, Indonesia ( 10 Months ) As Management Construction in PT. SURYA RESEARCH INTERNATIONAL, Serpong City, Tangerang Regency, Banteng Province, Indonesia

“ Workshop Project “ at Ciracas Sub-District, Bogor Regency, West Java Province, Indonesia and “ Corridor Median Project “ at Cawang Tj. Priok, DKI Jakarta, Indonesia and “ Bell-Air Mountain Resort and Residences “ at Bogor Regency, West Java Province, Indonesia ( 24 Months ) As Contractor in PT. RAHMAT BHAKTIUTAMA, Jakarta, Indonesia Site Engineer “Flood Management in Selected River Basin Sector Project”, at Ambon, Maluku Province, Indonesia ( 18 Months ) As Consultant in PT INDRA KARYA with KSO, Indonesia

Structural Engineering “Ampana Coal Fired Steam Power Plant ( 2 x 3 ) MW Project “ at Sabo Village, Ampana Tete Sub-District, Tojo Una-Una Regency, Center Sulawesi Province, Indonesia ( 14 Months ) As Consultant in Consortium PT Reconsult – PT Andalan RC, South Jakarta, Indonesia

“ Technique Proposal for Consulting Construction of Regional Technique of Sumatera “ at Directorate Development of Clean Water, South Jakarta, Indonesia and “ Preliminary Design for National Brain Hospital Project and Around Hospital “ at East Jakarta, Indonesia and “ Drainage Study of Bekasi Regency “ at Bekasi Regency, West Java Province, Indonesia ( 23 Months ) As Consultant in PT. VIRAMA KARYA, Jakarta, Indonesia

” Drainage Study of DKI Jakarta “ at DKI Jakarta, Indonesia ( 4 Months ) As Consultant in PT. VIRAMA KARYA, Jakarta, Indonesia Construction

Engineering

“Hydroelectric Power Plant / PLTA 1 and 2 Peusangan Project”, at Center Aceh, Aceh Province, Indonesia ” ( 20 Months ) As Consultant in PT KWARSA HEXAGON of Bandung with KSO, Indonesia

“ Dayung Compression and Central Gas Plant Debottleneck Project of Conocco Phillips Gressik Ltd “ at South Sumatera Province, Indonesia and ” Bontang Coal Terminal (BoCT) Expansion ( 30 MTPA / Matrix Ton Production Air ) of Iindominco MandiriI PT “ at Bontang, East Kalimatan Province, Indonesia and ” Banyun Urip Project EPC-5 is Infrastructure Facilities ( if ) Contract Packages, of Mobil Cepu Ltd “, at Cepu Area, Bojonegoro, East Java Province, Indonesia ( 12 Months ) As Contractor in PT. REKAYASA INDUSTRY, South Jakarta, Indonesia

” PLTM/ Hydroelectric Middle Capacity Project “ at Henua Sub-District, Mamuju Regency, West Sulawesi Province, Indonesia ( 7 Months ) As Consultant in PT. KWARSA HEXAGON ( KWARSA HEXAGON GROUP

), Bandung City, West Java Province, Indonesia

“ PLTM/ Hydroelectric Capacity Middle Project ” at Tentena Sub-District, Poso Regency, Centre Sulawesi Province, Indonesia ( 7 Months ) As Consultant in PT. STABILA ( KWARSA HEXAGON Group ), Bandung City, West Java Province, Indonesia

Planner Engineering “ South Sumatera Irrigation Project ( Work Bank Project)” at Lubuk Linggau Regency, South Sumatera Province, Indonesia ( 6 Months ) As Consultant in PT. Wiranta Buana Raya, Bandung City, West Java Province, Indonesia

Quality Engineering “Raw Water Supply Project”, at Bandung Regency, West Java Province, Indonesia ( 6 Months ) As Consultant in PT WAHANA KRIDA KONSULINDO of Tangerang with KSO, Indonesia

Water Resources

Engineer

“Position for Check Dam” at Citanduy River of Tasikmalaya Regency, Cikidang River of Tasikmalaya and Garut Regency, Ciwalen River 0f Tasikmalaya Regency, Cipali River of Ciamis Regency, Ciloseh River of Tasikmalaya Regency, Cihelang River of Tasikmalaya Regency and Cibeurem River of Tasikmalaya Regency, West Java Province, Indonesia

( 2 Months ) As Consultant in PT Sarana Badja Bumi, Bandung, West Java Province, Indonesia

“Inventory Performance for Embung Project” at Jeneberang Pompengang Central Office River Region, South Sulawesi Province and Office River Region of Sulawesi III, West Sulawesi Province, Indonesia

( 4 Months ) As Consultant in PT Sarana Bhuana Jaya, Bandung, West Java Province, Indonesia

Irrigation Engineer “Irrigation for Paya Biki, Upper Genting Gerbang, Rutih Irrigation Area included Supply Water for Bius Induk and Pepayeungan under Hydroelectric Power Plant / PLTA 1 and 2 Peusangan Project”, at Center Aceh, Aceh Province, Indonesia ( 5 Months ) As Consultant in PT KWARSA HEXAGON of Bandung with KSO, Indonesia

“Topographic Mapping and Aerial Photographic with LIDAR System and Bathymetry Measurement of Echo Sounding System Project”, at South Jakarta, DKI Jakarta Province, Indonesia ( 3 Months ) As Consultant in PT WAINDO SPECTERRA INDONESIA, South Jakarta, DKI Jakarta Province, Indonesia

Supervisor Engineering “ East Indonesia Networking Telecommunication Project ”, at Makassar City, South Sulawesi Province, Indonesia ( 12 Months ) As Consultant in PT. SIEMENS, Ujung Pandang / Makassar City, South Sulawesi Province, Indonesia

Senior Assistant “ Ponre-Ponre Dam Project ”, at Bone Regency, South Sulawesi, Indonesia ( 36 Months ) As Consultant in Nippon Koei Co., Ltd & Associates, Makassar City, South Sulawesi Province, Indonesia Senior Inspector “ Texmaco Group Karawang Project ” at Karawang Regency, West Java Province, Indonesia ( 9 Months ) As Consultant in PT. Deverindo Widya Karawang, ( TEXMACO Group ), Karawang Regency, West Java Province, Indonesia

Assistant Expert “ RDPLG / Regional Development Planning for Local Governance of South Sulawesi “, at Makassar City, South Sulawesi Province, Indonesia

( 24 Months ) As Consultant in JICA – BAPPEDA, Makassar City, South Sulawesi Province, Indonesia

“ JICA - RDPLG / Regional Development Planning for Local Governance of Sulawesi“, at Makassar City, South Sulawesi Province, Indonesia ( 24 Months ) As Consultant in JICA – Bina Bangda, Makassar City, South Sulawesi Province, Indonesia

“East Indonesia Region Development Policy ”, at Makassar City, South Sulawesi Province, Indonesia ( 24 Months ) As Consultant in JICA – BAPPENAS, Makassar City, South Sulawesi Province, Indonesia Education

Bachelor ( S1) Civil Engineering Degree University of Christian Maranatha, Bandung City, West Java Province, Indonesia ( 1986 – 1993 )

Final Task in University One of Method of Quality Assurance Mix Asphalt Related Skill

Languages Indonesia and English

Computer MS. Word, MS. Excel, MS. Power Point, MS. Windows, AutoCAD, Primavera Project Planner ( P6 )

Skill Certificate Expert of Quality Management System ( 14-02-2018 until 14-02-2021 ) By Construction Services Development Board of Centre Sulawesi Province of Indonesia Republic

Expert of Construction Management ( 14-08-2015 until 14-08-2018 ) By Construction Services Development Board of DKI Jakarta of Indonesia Republic ( on Going Update from Jakarta Virama Karya PT ) Expert of Water Resources ( 21-11-2019 until 20-11-2022 ) By Construction Service Development Board of Riau Island Province of Indonesia Republic

Accomplishment

Plan project related to civil engineering work together with team until completion of the project DC-1 / CGPX Project Five Hundred Thousand Man-Hours without Injury ( Record-able Injury ) Work Experiences :

Irrigation Engineer

Consultant PT KWARSA HEXAGON of Bandung with KSO, Indonesia July 2022 – November 2022 :

“Irrigation for Paya Biki, Upper Genting Gerbang, Rutih Irrigation Areas included Supply Water for Bius Induk and Pepayeungan under Hydroelectric Power Plant / PLTA 1 and 2 Peusangan Project”, at Center Aceh, Aceh Province, Indonesia

Duty and Responsible for :

Conducting survey and report on the existing condition of 5 irrigation areas : Bius Induk, Paya Biki, Upper Genting Gerbang, Rutih and Pepayeungan ( but the results of survey, there are only 3 irrigation area

: Paya Biki, Upper Genting Gerbang and Rutih while Bius Induk dan Pepayeungan no longer have rice fields so they can provide clean water for the surrounding population )

Coordination of the development of Irrigation Works with Team Leader

/ TL, Deputy Team Leader / Co TL, Construction Manager / CM, Senior Civil and Design Engineer ( Foreign / Japanese), Civil Engineer ( Foreign

/ Japanese ), included work plans between Civil Engineer ( Foreign / Japanese ) with Irrigation Engineer ( Local / Indonesia ) and Site PLN

Conducted a survey and created a working road report for 3 irrigation areas ( Paya Biki, Upper Genting Gerbang and Rutih ) and 2 locations ( Bius Induk and Pepayeungan ) for clean water supply

Carry Out a study of Cropping Patterns in 5 irrigation Areas : Bius Induk, Paya Biki, Upper Genting Gerbang and Pepayeungan (but the results of survey, there are only 3 irrigation area : Paya Biki, Upper Genting Gerbang and Rutih while Bius Induk dan Pepayeungan no longer have rice fields so they can clean water supply for the surrounding population)

Creating repot on Result of Cropping Pattern Study and calculation of water needs for irrigation in 3 irrigation areas : Paya Biki, Upper Genting Gerbang and Rutih while clean water supply in 2 locations : Bius Induk and Pepayeungan

Quality Engineer

Consultant PT WAHANA KRIDA KONSULINDO of Tangerang with KSO, Indonesia July 2021 – December 2021 :

“Raw Water Supply Project”, at Bandung Regency, West Java Province, Indonesia

Duty and Responsible for :

Follow technical instructions and orders from the team leader in every job and ensure that the team leader and PPK always receive the necessary information related to quality control

Assist the team leader in checking the work results that will be included in the Monthly Certificate (MC) for Weekly and Monthly Reports

Make Weekly and Monthly Reports from the results of quality investigations to support quantity data every week and month

Check all data on quality control of the materials used

Assist the team leader in the process of assisting in the testing of materials, mixtures / compositions that will be used based on specifications and Contract Documents

Checking the quality of the material to be used in accordance with the specifications contained in the Contract Documents

Assist the team leader in making reports and recommending to support planning

Carry out strict supervision and monitoring of the personnel and equipment arrangements of the Contractor's Laboratory so that the execution of the work is always supported by the availability of personnel and quality investigation equipment in accordance with the requirements in the Contract Documents.

Assist the team leader in providing inputs in order to examine the preparation of construction planning which includes construction site planning, cost planning and construction schedule

Assist the team leader in conducting research and examination of design products and preparation for implementation at each stage, aimed at the interests of implementation by adhering to the factors of construct ability and engineering in general

Submit proposals and suggestions for problem solving or corrective / improvement steps

Coordinate with other experts in the execution of work Civil Construction Engineer – 2

Consultant PT KWARSA HEXAGON of Bandung with KSO, Indonesia September 2019 – April 2021 :

“Hydroelectric Power Plant / PLTA 1 dan 2 Peusangan Project”, at Center Aceh, Aceh Province, Indonesia

Duty and Responsible for :

To cooperate with and share the responsibilities of activities of the Senior Civil and Construction Engineer ( Expatriate from Japan NIPPON Koei Co., Ltd )

To conduct preparation of final engineering design and general supervision of construction of No 1 Diversion Weir of the civil works of Lot I in terms of :

Coordination of design with the civil contractor on construction method, quality assurance and safety program

Advice on adjustment and modification of engineering design to actual conditions

Check and approval of fabrication and assembling drawings and detailed reinforcement drawings

Review and approval of final construction design prepared by the contractors

To conduct construction supervision of No 1 Diversion Weir of the civil works of Lot I in terms of :

To check and approve temporary works and facilities

To approve contractor’s equipment

To coordinate, supervise and inspect all construction activities

To corporate with the team leader in verifying and issuing orders to the contractor

To indicate and approve final reference points for the setting out of structures

To review, check and approve the quantity survey

Control progress of works and initiate corrective measures

To keep appropriate records on all project activities

To advise on settlement of claims

To inspect and direct preventive safety and environmental control measures

To prepare project completion report

To transfer knowledge to PLN personnel

Site Engineer

Consultant PT INDRA KARYA with KSO, Indonesia

April 2018 – September 2019 :

“Flood Management in Selected River Basin Sector Project”, at Ambon, Maluku Province, Indonesia

Duty and Responsible for :

Construction of check dams and small retention ponds in Way Batu Merah and Way Ruhu

River normalization in Way Batu Merah and Way Ruhu

Carry out checks for conformance of work as per design and Specification

Manage and supervise contractors in a daily basis in the role of Supervising Engineer

Prepare partial, substantial and final completion certificates

Supervise and monitor the local consultants of contractors

Supervise construction on a day-to-day basis and control and monitor quality of construction

Assist in the issuance of interim payment certificates

Examine the contractors’ claims

Examine need for contract variations and advise TL to make adjustments

Advise, guide and supervise the contractors in civil works including river dredging work that includes but not limited to

utilization/transportation/dumping of dredged materials

Work closely with Geo-technical engineer and cross check every consequence of dredging and propose measures against possible negative scenarios

Provide assistance to the CPMU and PIUs in technical supervision of civil works implementation, including contract management Irrigation Expert / Irrigation Engineer

Consultant PT WAINDO SPECTERRA INDONESIA, South Jakarta, DKI Jakarta Province, Indonesia January 2018 – March 2018 :

“Topographic Mapping and Aerial Photographic with LIDAR System and Bathymetry Measurement of Echo Sounding System Project”, at South Jakarta, DKI Jakarta Province, Indonesia

Duty and Responsible for :

Marking in Topographic Mapping and Aerial Photographic with LIDAR System : Primary Canal, Secondary Canal, Tertiary Canal, Drainage Channels.

Marking in Topographic Mapping and Aerial Photographic with LIDAR System : Off-Take Structure, Division Structure with Off-Take, Division Structure, Tertiary Box, Culvert, Flume Aqua Duct, Inverted Syphon, Drop Structure and others related with irrigation works.

Meeting and coordinated with the service user ( management ) and other agency related for supporting work activity, both through discussion and meeting

Created final report ( just related with irrigation works ) Team Leader for Rehabilitation Feasibility Study of Lais Kuro Tidur Irrigation of North Bengkulu Regency

Consultant PT Sarana Badja Bumi, Bandung, West Java Province, Indonesia January 2017 – August 2017 :

“Rehabilitation Feasibility Study of Lais Kuro Tidur Irrigation of North Bengkulu Regency” at Lais River of North Bengkulu Regency, Bengkulu Province, Indonesia

Duty and Responsible for :

Coordination with all expert and supporting persons in work implementation accordance with work reference frame, management or technique.

Preparation planning work for consultant, control work implementation accordance with planning work.

Coordinated with the service user ( management ) and other agency related for supporting work activity, both through discussion and meeting

Compose of Contract quality plan and Pra RK3K

Compose of weekly report, preliminary report, interim report and final report included control other report

Responsibility related with result work consultant and report presented Expert of Position for Check Dam / Water Resources Engineer Consultant PT Sarana Badja Bumi, Bandung, West Java Province, Indonesia December 2016 – January 2017 :

“Position for Check Dam” at Citanduy River of Tasikmalaya Regency, Cikidang River of Tasikmalaya and Garut Regency, Ciwalen River 0f Tasikmalaya Regency, Cipali River of Ciamis Regency, Ciloseh River of Tasikmalaya Regency, Cihelang River of Tasikmalaya Regency and Cibeurem River of Tasikmalaya Regency, West Java Province, Indonesia Duty and Responsible for :

Meeting with team before investigation at site .

Investigation at site for position check dam ( Citanduy River of Tasikmalaya Regency, Cikidang River of Tasikmalaya and Garut Regency, Ciwalen River 0f Tasikmalaya Regency, Cipali River of Ciamis Regency, Ciloseh River of Tasikmalaya Regency, Cihelang River of Tasikmalaya Regency and Cibeurem River of Tasikmalaya Regency ) .

Created report for position check dam ( Citanduy River of Tasikmalaya Regency, Cikidang River of Tasikmalaya and Garut Regency, Ciwalen River 0f Tasikmalaya Regency, Cipali River of Ciamis Regency, Ciloseh River of Tasikmalaya Regency, Cihelang River of Tasikmalaya Regency and Cibeurem River of Tasikmalaya Regency ) .

Expert of Inventory Performance for Embung / Water Resources Engineer Consultant PT Sarana Bhuana Jaya, Bandung, West Java Province, Indonesia September 2016 – December 2016 :

“Inventory Performance for Embung Project” at Jeneberang Pompengang Central Office River Region, South Sulawesi Province and Office River Region of Sulawesi III, West Sulawesi Province, Indonesia Duty and Responsible for :

Meeting with Head of Operational and Maintenance of Jeneberang Pompengang Central Office River Region, South Sulawesi Province .

Meeting with Official Fetcher Commitment ( PPK ) of Operational and Maintenance 1, 2, 3, 4 and 5 of Jeneberang Pompengang Central Office River Region, South Sulawesi Province .

Visit with staff of Operational and Maintenance 2, 3, 4 and 5 of Jeneberang Pompengang Central Office River Region, South Sulawesi and staff of Operational and Maintenance 3 of Office River Region of Sulawesi III, West Sulawesi Province :

- Existing condition for embung of : Takalar, Jeneponto, Salayar, Sidenreng Rappang, Wajo, Bone, Sinjai, Bulukumba, Bantaeng, Maros, Barru, Pare-Pare, Enrekang, Tanah Toraja, Palopo, Luwu Utara and Luwu Timur Regency, South Sulawesi Province and Mamuju, Majene, Polewali Mandar Regency, West Sulawesi Province.

- Existing Dimension for embung included reservoir are : Takalar, Jeneponto, Salayar, Sidenreng Rappang, Wajo, Bone, Sinjai, Bulukumba, Bantaeng, Maros, Barru, Pare-Pare, Enrekang, Tanah Toraja, Palopo, Luwu Utara and Luwu Timur Regency, South Sulawesi Province and Mamuju, Majene, Polewali Mandar Regency, West Sulawesi Province.

Created final report and Executive Summery included sketch each embung at South Sulawesi and West Sulawesi Province .

Meeting with owner and other consultants related final report and executive summery each embung at South Sulawesi and West Sulawesi Province .

Structural Engineering ( Steel Structure )

Consultant Consortium PT Reconsult – PT Andalan RC, South Jakarta, Indonesia April 2015 – May 2016 :

“Ampana Coal Fired Steam Power Plant ( 2 x 3 ) MW Project “ at Sabo Village, Ampana Tete Sub-District, Tojo Una-Una Regency, Center Sulawesi Province, Indonesia

Duty and Responsible for :

Review and monitoring steel structure construction activities :

- Review steel structure construction activity accordance with design approval and EPC contract agreement

- Review steel structure construction method and procedure

- Follow to coordination in construction meeting

- Review steel structure planning QA / QC

- Data steel structure punch list activities

Assistance to PT. PLN UIP KIT SULMAPA in control material receiving report ( MRR ) :

- Control documents shipping for steel structure

- Control certificate material for steel structure included bolts, nut and washer

- Control dimension and hole for bolts included accessories steel structure

- Visual check welding and paint for steel structure

- Control report arrangement for material receiving report ( MRR )

Assistance to PLN UIP KIT SULMAPA to control progress of steel structure work

Assistance to PLN UIP KIT SULMAPA to construction steel structure schedule included preparation to as build drawing

Expert of Structural Engineering ( Civil Engineer / Structural Engineer ) PT. VIRAMA KARYA, Jakarta, Indonesia

May 2013 - March 2015 :

“ Technique Proposal for Consulting Construction of Regional Technique of Sumatera “ at Directorate Development of Clean Water, South Jakarta, Indonesia

Duty and Responsible for :

Preliminary

Company Profile

Feedback and suggestions

Appreciation and Innovation

Implementation Schedule

Methodological Approach and Work Program

The composition of The Teams and Assignments

Experts Assignment Schedule

“ Preliminary Design for National Brain Hospital Project and Around Hospital “ at East Jakarta, Indonesia

Duty and Responsible for :

Review design for drainage trench ( secondary and primary included main-hole, control box and other relative )

Calculation for construction cost ( estimation for construction cost )

Meeting with client ( sub-department of environmental sanitation housing, Cipta Karya Directorate and hospital leadership )

Pre-survey about site condition

“ Drainage Study of Bekasi Regency “ at Bekasi Regency, West Java Province, Indonesia

Duty and Responsible for :

Structure : drainage, water reservoir, situ, sluice, water pump and water pump housing, road, pipe concrete drainage, culvert drainage, U- ditch drainage and infiltration well

Drainage drawing : sluice, pipe concrete drainage, culvert drainage, U- ditch drainage and infiltration well

Cost estimation calculation

Soil mechanic and foundation

SOP ( Operational and Maintenance Standards )

Meeting with client ( sub-department of environmental sanitation housing, Cipta Karya Directorate and hospital leadership ) CE ( Construction Engineering )

PT. REKAYASA INDUSTRY, South Jakarta, Indonesia

May 2012 - May 2013 :

” Dayung Compression and Central Gas Plant Debottleneck Project of Conocco Phillips Gressik Ltd “ at South Sumatera Province, Indonesia Duty and Responsible for :

Construction method for permanent civil work

Meeting with client for preparation work ( permanent civil work )

Meeting with sub-ordinary/sub-contractor for preparation work

(permanent civil work)

Kick off meeting for work ( permanent civil work )

Permit to work for permanent civil work

Procedure work for permanent civil work

Job Safety Analysis ( JSA ) for permanent civil work

Control implementation for permanent civil work ( excavation, re-bar, form work, concrete till back fill )

” Bontang Coal Terminal (BoCT) Expansion ( 30 MTPA / Matrix Ton Production Air ) of Iindominco MandiriI PT “ at Bontang, East Kalimatan Province, Indonesia

Duty and Responsible for :

Construction method for civil work

Proposal for civil work

Meeting for preparation proposal

Temporary facility planning

Schedule for equipment mobilization

Schedule for direct man power

” Banyun Urip Project EPC-5 is Infrastructure Facilities ( if ) Contract Packages, of Mobil Cepu Ltd “, at Cepu Area, Bojonegoro, East Java Province, Indonesia

Duty and Responsible for :

Construction execution plan

Construction method for civil work

Requisition for civil work

Schedule for activity

Schedule for equipment mobilization

Schedule for direct man power

Civil Superintendent

PT. SEKAWAN KONTRINDO, Palembang City, South Sumatera Province, Indonesia October 2011 - March 2012 :

” Donggi Senoro LNG Project “ at Uso Sub-District, Luwuk Regency, Centre Sulawesi Province, Indonesia

Duty and Responsible for :

Duct bank work ( included excavation, re-bar, concrete form / form work, concrete till back fill )

Sleepers for support pipe and bridge pipe ( included excavation, re-bar, concrete form / form work, concrete till back fill )

V – ditch open and close drainage ( included excavation, re-bar, concrete form / form work, concrete till back fill )

U – ditch open and close drainage ( included excavation, re-bar, concrete form / form work, concrete till back fill )

Building for temporary office, training room, warehouse, generator foundation, BBM tank foundation and others

Guard basin ( included excavation, re-bar, concrete form / form work, concrete till back fill )

Fencing ( included excavation, re-bar, concrete form / form work, concrete till back fill )

Road ( sub-grade, sub-base course, base course and asphalt )

Stone crusher plan foundation ( included excavation, re-bar, concrete form / form work, concrete till back fill )

Expert of Drainage Structure ( Civil Engineer/ Structural Engineer ) PT. VIRAMA KARYA, Jakarta, Indonesia

June 2011 – September 2011 :

” Drainage Study of DKI Jakarta “ at DKI Jakarta, Indonesia Duty and Responsible for :

Structure : drainage, water reservoir, situ, sluice, water pump and water pump housing, road, pipe concrete drainage, culvert drainage, U- ditch drainage and infiltration well

Drainage drawing : road, pipe concrete drainage, culvert drainage, U- ditch drainage and infiltration well

Cost estimation calculation

Soil mechanic and foundation

Site Manager ( SM )

PT. SURYA RESEARCH INTERNATIONAL, Serpong City, Tangerang Regency, Banteng Province, Indonesia

August 2010 - May 2011 :

” Sure Center Building Project “ at Serpong, Tangerang Regency, Banteng Province, Indonesia

Duty and Responsible for :

Completing the project on time with project management : Schedule

(activities, man power, material, equipment ) and s curve

Checking the implementation of the field with planning

Monitoring and Checking : daily report, progress and time schedule with s curve

Directs the implementation of the field if the executor requires explanation with drawings implementation

Provide technical support in the field

Meeting Coordination with consultant ( architecture, structure, mechanical and electrical ) and main contractor ( architecture, structure, mechanical and electrical )

Checking : drawing implementation, before and after working implementation, testing material

Checking physic progress report and payment progress Construction Engineering ( CE )

PT. KWARSA HEXAGON ( KWARSA HEXAGON GROUP ), Bandung City, West Java Province, Indonesia

August 2009 - February 2010 :

” PLTM/ Hydroelectric Middle Capacity Project “ at Henua Sub-District, Mamuju Regency, West Sulawesi Province, Indonesia

Duty and Responsible for :

Completing the project on time with project management : Schedule

(activities, man power, material, equipment ) and s curve

Checking the implementation of the field with planning

Monitoring quantity and quality and budget project implementation with budget planning included materials, equipment and man power

Directs the implementation of the field if the executor requires explanation with sketches or drawings implementation

Provide technical support in the field

Creating daily reports, weekly and monthly

Checking physic progress report and payment progress

Meeting with client and sub-contractor

Meeting coordination with sub-contractor

Construction Engineering ( CE )

PT. STABILA ( KWARSA HEXAGON Group ), Bandung City, West Java Province, Indonesia February 2009 – August 2009 :

“ PLTM/ Hydroelectric Capacity Middle Project ” at Tentena Sub-District, Poso Regency, Centre Sulawesi Province, Indonesia

Duty and Responsible for :

Completing the project on time with project management : Schedule

(activities, man power, material, equipment ) and s curve

Checking the implementation of the field with planning

Monitoring quantity and quality and budget project implementation with budget planning included materials, equipment and man power

Directs the implementation of the field if the executor requires explanation with sketches or drawings implementation

Provide technical support in the field

Creating daily reports, weekly and monthly

Supporting checked physic progress report and payment progress

Meeting with client and sub-contractor

Meeting coordination with sub-contractor

Senior Assistant

Nippon Koei Co., Ltd &



Contact this candidate