Kamil Alli
Degree: BS in Environmental Health and Safety
Contact
Tel : 832-***-****
E-mail : *************@*****.***
Address:***** ******** **** ***** *******, Tx, 77429
Profile
Objective
Highly motivated professional seeking a challenging career as an Inspector in a progressive organization where I can use my interpersonal relations, analytical and presentation skills in translating safety requirements towards maintaining a hazard free environment by maintaining compliance and equipment integrity. Commendable skills include but are not limited to high level of work prioritization, extensive management skills and the ability to work with people of different cultures.
Key Skills
Project Management
RBI inspection
Workshop Facilitation
PCMS/ U- Pipe
Data Gathering
Meridium
Strong Analytical Skills
Report writing
Good Presentation Skills
Project Planning
Microsoft Office Suite
Great Team Player
Education
Graduation
December 2009
BS in Environmental Health& Safety– Major GPA 3.4 on a scale of 4.0
TEXAS SOUTHERN UNIVERSITY,
Current API 510# 50051 & 570# Inspector 61116
NDT/NDE Level II Certification – Magnetic particle (MT), Liquid Penetrate (PT), Ultrasonic testing (UT), UTSW, Radiography (RT), Eddy Current(ET), Visual Testing (VT)
Work Experience
Versa Integrity Group August 2019- Present
Formosa Plastics Corp, (Port Lavaca, Tx)
Sr. API 510/570 Turnaround Inspector
Conducted initial walk down on piping and equipment.
Familiarized with prior history of the vessels, reviewed the vessel’s prior inspection results, prior repairs, and current inspection plan.
Performed internal visual inspection on the pressure vessel’s and analyzed NDE results.
Generated repair recommendations for equipment and piping
Wrote clear and precise reports and recommendation per API 510/ 570 code and the client’s policies and procedures.
Performed External piping inspection and internal inspection on pressure vessels.
Conducted JSA to identify any potential hazards before starting any work activity on the field.
Amerapex Corp April 2019- July 2019
PHRC Rehabilitation Project, FCCU( Port Harcourt, Nigeria )
API 510/570
Conducted initial walk down on piping and equipment
Familiarized with prior history of the vessels, reviewed the vessel’s prior inspection results, prior repairs, and current inspection plan
Performed inspection on the FCCU structure including regenerator, cyclone and reactors
Wrote clear and precise reports and recommendation per API 510/ 570 code and the clients policies and procedures
Performed External piping inspection and internal inspection on pressure vessels
Conducted JSA to identify any potential hazards before starting any work activity on the field
CFS Inspection
API Inspector
CHS Turnaround (McPherson, KS ) March 2019- April 2019
March 2017- April 2017
2017
Reviewed equipment’s previous history prior to conducting inspection activity
Conducted internal visual inspection on towers and drums
Wrote IWR for defective equipment and made recommendations for repairs
Followed up with repairs according to approved procedures and documented the repair process
Wrote clear and accurate reports for client
Team Industrial Services
Marathon LAR (Turnaround) January 2019 – February 2019
API Inspector
Familiarized with prior history of the vessels, reviewed the vessel’s prior inspection results, prior repairs, and current inspection plan
Reviewed and Understood Turnaround inspection plan pertaining to the equipment and ensured that work scope was covered.
Requested further NDE for data gathering and further investigation of damage mechanisms
Wrote repair recommendations and followed up with repairs
Wrote clear and accurate reports for Clients
ATS Inspection
Honeywell July 2018 – January 2019
Reliability Inspector
Maintained Meriduim mechanical integrity programs
Reviewed piping and equipment previous history prior to conducting field inspections
Scheduled NDE activities on piping and equipment
Wrote clear and accurate reports for the Client
Facilitated meetings and Liaised with Engineering department regarding new T min values for piping and equipment
Team Industrial Services
P66 Wood river F-Train T/A February 2018 – March 2018
API Inspector
Familiarized with prior history of the vessels, reviewed the vessel’s prior inspection results, prior repairs, and current inspection plan
Reviewed and Understood Turnaround inspection plan pertaining to the equipment and ensured that work scope was covered.
Requested further NDE for data gathering and further investigation of damage mechanisms
Wrote repair recommendations and followed up with repairs
Wrote clear and accurate reports for Clients
Conducted pre turnaround piping inspection.
Mistras Group January 2018- February 2018
(Chevron El Segundo Alky Shutdown)
API Inspector 510/ 570:
Familiarized with prior history of the vessels, reviewed the vessel’s prior inspection results, prior repairs, and current inspection plan
Inspected drums, wrote repair recommendations and followed up with repairs
Conducted visual inspection and verified NDE and on piping repairs
Performed external visual inspection on piping stripped and grit blasted for CUI inspection during turnaround and wrote repair recommendations if required.
Visually inspected vessels shell course for pitting, measured pit depth and made recommendations
Visually inspected, nozzles, welds at attachment openings, vessel walls for damages or deterioration and documented reports
CFS Inspection
API Inspector
P66 West lake ( Crude T/A) April 2017- May 2017
CVR Refining ( Crude T/A) September2017- October 2017
March 2017- April 2017
2017
Reviewed equipment’s previous history prior to conducting inspection activity
Conducted internal visual inspection on towers, exchanger shell and components
Wrote IWR for defective equipment and made recommendations for repairs
Followed up with repairs according to approved procedures and documented the repair process
Wrote clear and accurate reports for client
Sentinel Integrity/ INEOS Chocolate Bayou( Project) / Paulsboro ( ARU,SRU T/A)
March2016 – October 2016
API 510/570
Familiarized with prior history of the vessels, reviewed the vessel’s prior inspection results, prior repairs, and current inspection plan
Conducted JSA to identify any potential hazards before starting any work activity on the field
Conducted initial walk down on piping and equipment
Reviewed NDE reports for compliance on piping packages
Witnesses Hydrostatic test, walked down lines to verify that hydro test was conducted in compliance with API codes
Conducted internal visual inspection on fixed equipment including, towers, drums, heat exchangers and made repair recommendations.
Reviewed repair package and followed up with repairs
Documented clear and accurate reports for client
Amerapex Corp/ PRSI (LPG, UDEX CUI Project) July 2015- March 2016
API 510/570
Conducted initial walk down on piping and equipment
Familiarized with prior history of the vessels, reviewed the vessel’s prior inspection results, prior repairs, and current inspection plan
Inspected Pressure Vessels of all size and shapes, Process Piping, Power Piping and Boiler Inspections, and Fabrication, Corrosion Monitoring and CUI Inspection (In-service or shut down),
Reviewed data from NDE such as neutron backscatter, open vision and profile X rays
Wrote clear and precise reports and recommendation per API 510/ 570 codes
Facilitated resolution of issues generated from reviews, inspections & incident investigations
Conducted follow up on repairs and alterations and documented the process
Read P &ID’s, red lined drawings and sketched isometric drawing in the field
Conducted JSA to identify any potential hazards before starting any work activity on the field
CFS Inspection ( Turnaround):September 2014- May 2015
(Phillips 66 Belle Chase FCCU T/A)
(Phillips 66 wood river Coker/ Crude T/A)
(NCRA Refinery Kansas Full Plant Shutdown)
API Inspector 510/ 570:
Familiarized with prior history of the vessels, reviewed the vessel’s prior inspection results, prior repairs, and current inspection plan
Inspected Towers, heat exchangers, heaters and vessels
Inspected various types of heat exchangers including air coolers
Performed internal and external inspection on fixed equipment at scheduled intervals to maintain
Mechanical integrity.
Maintained permanent and progressive records of all pressure vessels and pressure relieving devices, including adding new information pertinent to the operation, inspection, and maintenance history of the equipment.
Visually inspected vessels shell course for pitting, measured pit depth and made recommendations for repairs based on 510 code
Inspected pressure vessels to ensure that they are suitable for service in accordance to API codes
Visually inspected, nozzles, welds at attachment openings, vessel walls for damages or deterioration and documented reports
Cima Inspection ( DCP Midstream T/A) April 2014 – May 2014
API Inspector:
Familiarized with prior history of the vessels, reviewed the vessel’s prior inspection results, prior repairs, and current inspection plan
Performed internal and external inspection on fixed equipment at scheduled intervals to maintain
the mechanical integrity.
Maintained permanent and progressive records of all pressure vessels and pressure relieving devices
Wrote repair recommendations for equipment that had deficiencies.
Team Industrial Services (Eastham Forge)December 2013 – March 2014
UT Shear wave Tech:
Calibrated Ultra sonic equipment
Inspected forgings and accepted and rejected parts based on acceptance criteria
Conducted MT and PT inspection to prove flaws open to the surface
Wrote clear and accurate reports for Clients
National Oil well Varco (Rig Solutions Pressure Control group) January 2013- December 2013
NOV welding Inspector (Off Shore)
Conducted AUT and TOFD Scans on tomoview, Interpreted results of scans and also reconfirmed flaws
Calibrated nondestructive testing equipment, Tested welds with UT Shear wave to determine mechanical integrity of parts tested
Accepted or rejected Parts based on SOP or QC Inspection plan
Inspected structural welds ( Rig structures and stack pads) visually and with NDE to check for defects and discontinuities
Inspected pressure vessels in the manufacturing and fabrication process to ensure that it conforms to API 510 Section VIII fabrication codes.
Inspected risers, booster lines, test spool, BOP and other subsea parts to ensure it meets customers quality requirements
Conducted dimensional inspection with caliper to ensure parts meet specification
RTI Energy System January 2012- December 2012
NDT Level II Inspector
Conducted thickness testing of pipelines with ultra-sonic technique to inspect for corrosion.
Used Ultra sonic, liquid penetrate, magnetic particle to determine the structural integrity of tested parts.
Conducted Hardness testing and confirmed results with scope to determine hardness of material
Operated Magnetic particle bench and inspected parts with head shot and coil method.
Wrote precise and clear reports to clients
Inspected parts for clients like Shell, BP, Exxon Mobil, Chevron and FMC at company’s machine and fabrication shops
Ensured that tests are conducted in compliance with test plans and flaws are analyzed according to test plans acceptance criteria
Honors and Activities
Awards
Dean’s List Fall 2006, Spring 2007, Fall 2007, Spring 2008, Fall 2009
Memberships: TSU Environmental health club, NEHA (National Environmental Health association. OSHA Construction and Oil and Gas Training, National association of non-destructive testers.
Community Involvement
Christ United Pentecostal Ministries - Volunteer
Texas Southern University - Mentor
Bridging the Gap(Community Volunteer Tutoring Program)