CURRICULUM VITAE
Name : Shaikh Zeeshan Akhalaqe
Address : Flat no.1, B wing, SB Vihar, Survase Mitra Nagar, Hotgi Road, Solapur-413003, India Phone : +918*********
Email : adu5il@r.postjobfree.com
Experience : 10 months of experience in site planning and billing OBJECTIVE
Enthusiastically seeking a challenging position as a site planning engineer so as to utilize my skills for self-improvement along with the symbolic growth of the organization. To give my 100% for the task which I get as an engineer is my biggest strength. EXPERIENCE (10 Months) IN PLANNING AND BILLING
Company: Megha Engineering and Infrastructures Ltd. (M.E.I.L.) Designation: Post Graduate Engineer Trainee (PGET) in Planning Project: Propylene Recovery Unit (EPCC-06)
Client: Indian Oil Corporation Ltd.
PMC: Technip Energies
Total Project Cost: 800 Cr
Major Duties and Responsibilities
1. Detailed study of engineering drawings for planning and execution work. 2. Arranging meetings with the owner and project management consultancy. 3. Preparing daily, weekly and monthly Progress Report. 4. Preparing 90 days look ahead schedule, monthly, weekly, and next day planning and scheduling. 5. Planning and scheduling for pile foundation and pile cap, construction of site office, and construction of security gatehouse.
6. Comparing actual vs planned work completed and modifying the plan according to actual completed. 7. Creating a baseline schedule for the project.
8. Visiting site daily, coordinating with site execution team, and following up on the work completed. 9. Finding out the reasons for the delay in the project if any. 10. To send the next day’s work plan to PMC for Permit To Work. 11. To take signatures of the client (IOCL), PMC, and MEIL job engineers on Permit To Work. 12. Executed construction of site office from the initial stage till the completion stage i.e. construction activities such as excavation, foundation, columns, plinth beams, brickwork, and other finishing works. 13. To write the indent of materials required and to prepare interoffice communication (IOC) document for approval of purchasing of materials and to take follow up for the materials ordered. 14. To prepare sub-contractor’s, and vendor’s bills and submit them to Head Office for issuance of the bill.
15. Prepare bill of quantities (BOQ) required for construction of site office. ACADEMIC PROJECTS
Final BE Project
“THE TRIPLE CONSTRAINTS OF PROJECT”
-the brief study of Project Management.
-analyzing field data in MS Project such as Planning and Scheduling. NICMAR Project SUCCESS OF REAL ESTATE PROJECT
SOFTWARE
PROFICIENCY
Primavera P6
Microsoft Project (MSP)
Microsoft office (Excel, Word, PowerPoint)
QUALIFICATION BOARD INSTITUTE YEAR OF
PASSING
% MARKS / CPI / CGPA
Post Graduate
Program in
Advanced
Construction
Management
NICMAR
NATIONAL INSTITUTE OF
CONSTRUCTION MANAGEMENT
AND RESEARCH, Hyderabad-India
2021
8.30 CPI
B.E. Civil
SOLAPUR
UNIVERSITY
WALCHAND INSTITUTE OF
TECHNOLOGY, Solapur-India
2019 7.95 CGPA
12th Class
PUNE DIVISION
BOARD
SSA JR. COLLEGE OF
SCIENCE,Solapur-India
2015 76.00%
10th Class
PUNE DIVISION
BOARD
SAINT JOSEPH HIGH
SCHOOL,Solapur-India
2012 77.82%
QUALIFYING EXAMINATIONS
Graduate Record Examination (GRE) - 286
Duolingo English Test (DET) - 115
LANGUAGES KNOWN
English
Hindi
Marathi
EXTRACURRICULAR ACTIVITIES/ACHIEVEMENTS
Bagged first prize in World Quality Week quiz competition from Megha Engineering.
Actively participated in the paper wonder tender of Witchar-18(A competition of building tender).
Actively participated in traffic survey for road safety audit (2019). (Calculation of traffic density).
Winners of U-19 Solapur district Basketball tournament 2013.
Winners in Solapur University Zonal Cricket Cup 2016.
Ranked 3rd in Solapur University Zonal Cricket Cup 2017.
Runners-up for consecutive 3years in SJHS JESA (Football) CUP 2017, 2018 & 2019.
Certified Elite by NPTEL (IIT ROORKHE) in soft skills course. I hereby affirm that the information furnished in this form is true and correct. INDUSTRY EXPOSURE
ORGANISATION LEARNINGS
PRAGATI BUILDERS SOLAPUR
Done field training and was deputed to look after Foundation work, RCC work, Masonry, Plastering, and other finishing work.