Post Job Free

Resume

Sign in

Boilermaker Gold Mines

Location:
Accra, Greater Accra, Ghana
Posted:
February 04, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL DETAILS SURNAME : ASANTE

FIRST NAME : GIDEON

DATE OF BIRTH : 27TH NOVEMBER 1983

PLACE OF BIRTH : OBUASI- MUNICIPAL

SEX : MALE

MARITAL STATUS : MARRIED

NATIONALITY : GHANAIAN

RELIGION : CHRISTIAN

HEALTH : EXCELLENT, NON SMOKING

OTHER : QUALIFIED FIRST AID

TELEHONE NUMBER : +233(0)24982701/+233(0)508-***-****

EMAIL : adu41p@r.postjobfree.com

OBJECTIVE

Certified professional in Welding, Fabrication and Pipe works for eight years experience in boiler making, pipe fabrication and welding field. I have international experience. Seek a position as

boilermaker, welder and Pipe fabricator in your Company.

QUALIFICATIONS SUMMARY

I was trained in AngloGold Ashanti engineering training centre(AGA) Welding, Boiler making and Pipe Fabrication with proven skills to work assertively. With high impart to achieve business objectives. I adapt well and quickly to new systems, Technologies and companies. Excellent background and facilitating in boiler making, Pipe Fabrication and welding activities.

EDUCATION AND QUALIFICATION

ANGLOGOLD ASHANTI ENGINEERING TRAINIG CENTER

August, 2010 to June 2011

Program of Study : Welding and Fabrication

KUMASI TECHNICAL INSTITUTE

June, 1998 - August, 2001

Certificate : Intermediate and Basic Education Certificate

DETAILS OF PROFESSIONAL EXPERIENCE

Group Five Structured Ingenuity

Client : AngloGold Ashanti, Guinea Conakry

Project : Suguiri Combination Gold Project, Guinea Conakry

Date : 17th May 2018 - Present

Position: Boilermaker

Duties : Fabricate, maintain, install, modify, repair, assemble boilers and its mountains and accessories such as water level indicators,safety valves pressure gauges, feed check and control valves, air release valves, main stem stop valves, blow down valves, etc and all kinds of mechanical components, such as conveyors, crushers, pipe supports, hand rays, cable racks, structures etc.

PW Mining International (Ghana) Limited

Client : Asanko Gold Mines, Manso Nknan, Ghana

Project : Asanko Gold Project

Date : 13th May 2016 - 30th April 2018

Position : Welder/Fabricator

Duties : Weld, fabricate, maintain, install, modify, repair, assemble excavator buckets and all kinds of mechanical components.

Redis Construction Ghana

Client : Asanko Gold Mines, Manso nknan, Ghana

Project : Asanko Gold Project

Date : January, 2015 to December, 2015

Position: Boilermaker

Duties : Fabricate, maintain, install, modify, repair, assemble boilers and its mountains and accessories such as water level indicators,safety valves

pressure gauges, feed check and control valves, air release valves, main stem stop valves, blow down valves, etc and all kinds of mechanical components, such as conveyors, crushers, pipe supports, hand rays, cable racks, structures etc.

Wise Design Engineering Sa

Client : African Minerals, Sierra Leone

Date : 24th June, 2014 - 28th November, 2014

Position : Boilermaker

Duties : Fabricate, maintain, install, modify, repair, assemble boilers and its mountains and accessories such as water level indicators,safety valves pressure gauges, feed check and control valves, air release valves, main stem stop valves, blow down valves, etc and all kinds of mechanical components, such as conveyors, crushers, pipe supports, hand rays, cable racks, structures etc.

Group Five Structured Ingenuity

Client : Kibali Gold Mines, Dr Congo

Project : Kibali Gold Project

Date : 1st October, 2012 to 27thAugust, 2013

Position : Boilermaker

Duties : Fabricate, maintain, install, modify, repair, assemble boilers and its mountains and accessories such as water level indicators,safety valves pressure gauges, feed check and control valves, air release valves, main stem stop valves, blow down valves, etc and all kinds of mechanical components, such as conveyors, crushers, pipe supports, hand rays, cable racks, structures etc.

Group Five Structured Ingenuity

Client : African Minerals Limited(AML), SIERRA LEONE

Project : Tonkolili ProjectPhase 1B

Position : Boilermaker/Fabricator

Date : 3rd January, 2012 - 18th September, 2012

Duties : Structures, Plates, cable racks, hand rays, Pipes etc Fabrications

Group Five Structured Ingenuity

Client : Tarkwa Goldfields Limited, Tarkwa Ghana

Project : Tarkwa Gold Project

Position : Boilermaker/Fabricator

Date : 1st September, 2011 - 4th January, 2012

Duties : Structures, Plates, cable racks, hand rays, Pipes etc Fabrications

Group Five Structured Ingenuity

Client : Central Ashanti Gold Ltd, Ayanfuri, Ghana

Project : Central Ashanti Gold Project

Position : Boilermaker/Fabricator

Date : 6th January, 2011 - 20th August, 2011

Duties : Structures, Plates, cable racks, hand rays, Pipes etc Fabrications

Group Five Structured Ingenuity

Client : Central Ashanti Gold Ltd, Iduapriem, Ghana

Project : Aduapiem Gold Project

Position : Boilermaker/Fabricator

Date : 2ndth February, 2009 - 9th May, 2009

Duties : Structures, Plates, cable racks, hand rays, Pipes etc Fabrications

Force Five Engineering (Ghana) Limited

Client : AngloGold Ashanti Obuasi Mines, Obuasi, Ghana

Position : Boilermaker/Fabricator

Date : 19th June, 2004 – 8th November, 2007

Duties : Structures, Plates, cable racks, hand rays, Pipes etc Fabrication

PERSONAL ATTRIBUTES

Excellent communication and interpersonal skills

Strong analytical problem solver

Ethical and well able to relate to all kinds of people

Integrity, honest and trustworthy

HOBBIES

Listening to news

Playing of football

Reading books

REFEREES

Mr. Joseph Boakye Yiadom

Foreman - Boilermaker

Siguiri Gold Project, Guinea Conakry

Tel:+224*********/+233*********

Mr. Williams Afoakwah

SMP Supervisor - DRA

Tel: +233*********/+233*********



Contact this candidate