Post Job Free

Resume

Sign in

Power Plant General Electric

Location:
Bucharest, 020300, Romania
Posted:
February 02, 2023

Contact this candidate

Resume:

Curriculum Vitae

CONSTANTIN MIHAI

Pre-commissioning, Commissioning Superintendent, start-up and operator

In pawer plant and petrochemical Oil & Gas

Personal Data:

- Date of Birth 17th of December, 1960

- Marital Status married with 2 children

- Nationality Romanian

Education: - 1981-1985 Industry high school no 1;

- 1996 – 1999, Bachelor Diploma Oil and Gas engineering from Ploiesti;

-Authorization issued by I.S.C.I.R (State Inspection for Boilers, Pressure Vessels and Hoisting Units) for the supervision and technical verification of pressure equipments and hoisting units

LANGUAGES: English – fluent - spoken, read;

France – medium – spoken & read.

EMPLOYMENT RECORD:

Work Experience:

Dates(from – to : November 2021-Nov 2022

Name and address of employer: Maire Tecnimont RussiaSvobodnyj, Oblast di Amur, Russia AGPP (Amursky Gas Process Plant)Svobodnyj

Occupation or position held:Commissioning Superintendent

Utility :Nitrogen compressor .Air compressor,Boiler

Tank farm

Water Treatment

Interfaces with other disciplines to ensure integration of activities.

Preparation of method statements, procedures and routines where required.

- Assist during the database preparation for precommissioning status index and commissioning technical database.

Dates(from – to): November 2018- May 2021

Name and address of employer: Maire Tecnimont Polyethylene and Propylene Plants for ORPIC Project, located in Sohar, Sultanate of Oman.

Occupation or position held:Commissioning Superintendent

Purification Unit

Polyethylene Unit

Polypropylene Unit

Utility for Polymer Complex Sohar Commun

Duties: Precommissioning and Commissioning

- Interfaces with other disciplines to ensure integration of activities.

- Implement & test the subsystems as per project commissioning test sheets.

- Preparation of method statements, procedures and routines where required.

- Interface towards Precommissioning and Company personnel.

- Reports on work progress, bringing to notice potential problems or delays and recommends solutions.

- Assist during the database preparation for precommissioning status index and commissioning technical database.

- Plan, Monitor and assist in Vendor activities as required.

EMPLOYMENT RECORD:

Work Experience:

Dates(from – to): November 2017- October 2018

Name and address of employer:Casale(EPC) –YARA-Syra 4 Project,Nitric Acid Plant.Koping Sweden

Occupation or position held:Mechanical Commissioning Specialist

Nitric acid process is based on CASALE dual pressure technology

Duties: Precommissioning : Commissioning and start-up for:

-Lead the mechanical designs and mechanical-related interfaces between the various PMT engineering disciplines, Operations Specialist, Technology Specialists/Consultants, SHE Specialist, Package Manager, Local Regulatory, etc by ensuring that the mechanical design intent and design basis is clearly defined and adhered to by all parties. Solicit external expert advice, if required.

-Ensure all Consultant, Contractor and Licensors mechanical engineering work are implemented and completed in accordance with the scope, schedule and other contract requirements with quality of high standard and integrity.

-Manage mechanical engineering team to review, respond, comment and approve, as necessary, mechanical design clarification, datasheets, calculations, drawings, specification and other design documentation prepared by ---Consultant, Contractor and Licensors for compliance to project requirements as well as for optimal design and technology implementation.

-Monitor Consultant, Contractor and Licensors mechanical deliverables are prioritized, developed, submitted, reviewed and timely responded to suit overall project requirements. Perform the monitoring and surveillance, design audits of Consultant, Contractor and Licensors mechanical engineering work in accordance with the establish quality system to determine adherence to established procedures, instructions, specifications, codes, standards and special requirements.

-Ensure that battery limit conditions and site interfaces are properly incorporated via approved Interface Documentation. Maintain mechanical risk and assumptions register

- Compressor Air-(Atlas Copco).

-Nitric Acid Compressor Train.

-AIR COMPRESSOR/TAIL GAS EXPANDER/STEAM TURBINE /MOTOR-GENERATOR( MITSUBISHI)

-Absorption Tower,Catalytic Reactor,Ammonia Burner,Steam Drum.

Dates(from – to): March 2016-july 2017

Name and address of employer: Tecnimont TAL- Sadara Chemical Company- HP-LDPE Project

Occupation or position held:Mechanical Lead

Duties: Precommissioning and Commissioning for:

Coopressor: Booster and Hyper

-Receives Project documentation and understands Scope of Work related to his discipline what is required.

- Lead a team to undertake commissioning activities in small projects.

- Interfaces with other disciplines to ensure integration of activities.

- Implement & test the subsystems as per project commissioning test sheets.

- Preparation of method statements, procedures and routines where required.

- Interface towards Precommissioning and Company personnel.

- Reports on work progress, bringing to notice potential problems or delays and recommends solutions.

- Assist during the database preparation for precommissioning status index and commissioning technical database.

- Plan, Monitor and assist in Vendor activities as required.

-Ensure temporary supplies and commissioning spares are adequate for the subsystem testing.

-Perform inter-discipline checks.

- Compliance in accordance with HSE Standard.

Dates(from – to): May 2015- 07-Dec-2015

Name and address of employer: TOTAL E&P UK - Petrofac : Shetland Laggan Tormore Project

Type of business or sector: Gas Plant

Occupation or position held:Commissioning supervisor

Precommissioning and Commissioning for: GEA(Gas Export Area).GPA(Gas Processing Area:Compression Packages,TEG Regeneration). LTA (Liquid Treatment Area:LP&LLP Compressiors,Condensate Recovery Pumps). MTA: MEG Treatment Area Pretreatment/Regeneration& Desalination. PSA Production Separator Area(Slugcatcher) WTA: Water Treatment Area (ONDEO). UTA:Utilites Treatment Area.

Dates (from – to):Septembrie 2013-March 2015

Name and address of employer: Tecnimont SPA Abu Dhabi; Borouge 3

Type of business or sector: Polyolefins- polymers plant

Occupation or position held:Commissioning supervisor

P-Commissioning and Commissioning Activiti.

-- During the precommissioning and commissioning I was in charge with: flushing, blowing, leak tests, inertizing and start-up

Dates (from – to):march 2012-September 2013

Name and address of employer: Tecnimont It.,Abu Dhabi Gas ;Gasco

Type of business or sector: Oil & Gas:Habshan-5 Process Plant

Occupation or position held:Commissioning supervisor

A.G.R(Acid Gas Removal) S.R(Sulphur Recovery) Lean Gas TEG.

-- During the precommissioning and commissioning I was in charge with: flushing, blowing, leak tests, inertizing

Dates (from – to): May 2011-March 2012

Name and address of employer: SAIPEM SPA & SAIPEM CONTRACTING ALGERIE SPA Succursale Alger-chantier M.L.E.

Type of business or sector: Oil & Gas- Petrochemical Products

Occupation or position held:Commissioning process and piping Supervisor service

. Duties:

-Precommissioning, commissioning and start-up of Menzel Ledjmet East .plant Oil&Gas

-During the precommissioning and commissioning I was in charge with: flushing, blowing, leak tests, inertizing, drying of systems: propylene, ethylene and start-up .

-During the precommissioning and commissioning I was in charge with: flushing, blowing, leak tests, inertizing, drying of different equipments: condensate spliter, separators, benzene pumps, Heat exchangers, Fired Heater, propylene pumps, propilene vaporiser, shell & tube reactor, benzene and cumene and start-up.

-Operating of: condensate spliter, separators, benzene pumps, distilation columns, propylene pumps, shell & tube reactor, alkylation reactor for cumene(isopropyl-benzene), depropanizer column,DIPD(diisopropylbenzene) column, transalkylation reactor to recovere the DIPD cumene,Oxideizer of cumene, cleavenge reactor (with H2S04);

Dates (from – to): June 2009 – October 2010

Name and address of employer: Tecnimont It., QCHEM II Qatar

Type of business or sector: Oil & Gas- Petrochemical Products;

Occupation or position held: Pre-commissioning, Commissioning Supervisor in NAO (Normal Alfa Olefins)

Duties:

- Precommissioning, commissioning and start-up of a Normal Alfa Olefins plant.Oil&Gas

- During the precommissioning and commissioning I was in charge with: flushing, blowing, leak tests, inertizing, drying of different systems: propylene, ethylene, hydrogen, phenol and light naphta etc.

- I assisted to the start-up phase of the NAO plant

- Technical data of the NAO plant:

- NAO Stabilization : Deethenizer, Debutanizer, Booster Compressor, Buten Dryers, Deethenizer Dryer;

- NAO Distillation : Light Splitter, Hexene Reactore, Tower (C6,C8, C12, C14, C16, C18);

- NAO Reactor – 8 Reactor;

- NAO The aromatics complex wich produce benzene, toluene, paraxylene, orthoxylene and meta-xylene from the integrated BTX units. Produce also cumene, glycols and phenol and export LPG and light naphtha.

- Start-up of: condensate spliter, separators, benzene pumps, distilation columns,alkylation reactor for cumene(isopropyl-benzene), depropanizer column,DIPD(diisopropylbenzene) column, transalkylation reactor to recovere the DIPD cumene, cleavenge reactor;

Employer: TECNIMONT, SAHARA PDH/PP PROJECT

for AL WAHA PETROCHEMICAL from Kingdom of Saudi Arabia, Al Jubail Period: May 2008 – June 2009

Position Held and Description of Duties:Oil& Gas- Commissioning assistant.

Duties:

- Precommissioning, commissioning and start-up of a POLY-PROPYLENE plant.

- During the precommissioning and commissioning I was in charge with: flushing, blowing, leak tests, inertizing, drying of different systems: propylene, ethylene, hydrogen, etc.

- I assisted to the start-up phase of the PP plant.

- Technical data of the PP plant:

- spherizone type;

- pre contacting pot (V = 5.5 liters); prepolymerization reactor (V = 1.86 m3);

- Multi Zone Circulating Reactor (V = 840 m3); Gas Phase Reactor (V = 168m3);

- Atlas Copco circulating compressors: Q = 45,500 m3/h ;

- Burckhardt Compressors for sealing;

- extruder Q = 75 t/h.

-Technical data of the Utilities department:

- closed cooling water system;

- sea water cooling towers ;

- HAFI - instrument & plant air compressors;

- demi water treatment system with anionic, cationic and mixed bed towers;

- low and high pessure nitrogen system

- Nijhuis - fire fighter system;

- waste water treatment system (oily waste water, caustic soda & sulphuric acid waste water).

Employer: MITSUBISHI TOSHIBA, FOR DEWA (DUBAI ELECTRICITY AND WATER AUTHORITY) FROM UAE – DUBAI, JEBEL ALI POWER AND DESALINATION STATION “L” – PHASAE 1.

Period: May 2006 –February 2008

Position Held and Description of Duties: Mechanical Commissioning Engineer.

Duties:

- Precommissioning, commissioning and start-up of a co-generation power plant: 3x300 MW/hr GTG, 2x200 MW/hr BSP turbines, 3x 750 t/hr HRSG, 2x500t/hr Auxiliary Boiler (100 bar; 580 C), Demi Plant, Close Circuit Cooling Water System and Auxiliary Cooling Water (Sea Water), Waste Water Treatment, 5x 2500 t/hr desalination unit, DFO Unloading facility from Jebel Ali Port free zone, Fuel Gas System (Dew Point Heaters, Gas Compressors, Skid Reducing and Gas Buffers).

- During the precommissioning and commissioning I was in charge with the checking of P&ID’s verifying in the field the correct mounting of all the equipments.

- I was also in charge with the flushing, blowing, test pressure & start-up of the Power Plant.

- After the start- up of the Power Plant I have participated to the performance test of the 3x300 MW/h GTG following the parameters of each system of the GTG – Mark VI.

- GTG Mark VI 3x300 MW/h (frame 9), made by General Electric USA, type PG9351(FA) using natural gas & liquid fuel.

-Technical data from Cogeneration Power Plant:

technological steam boilers type Heat Recovery Steam Generator with supplementary firing (Qn=720 t/h; Pn=95 barg; Tn=652 oC) designed by Doosan Heavy Industries &Construction .Co;

technological steam boilers type Auxiliary Boiler (Q = 720 t/h; P = 95 barg; T = 600 oC) Ishikawajima-Harima Heavy

Industries Co.Ltd.;

DCS (Distribute Control System) made by Toshiba (TOS MAP).

From june 2007 to February 2008 I was GTG maintenance engineer in charge, where I followed the GTG functioning time and: Gas, DFO, Lube Oil, etc, filters replacing according with maintenance schedule and fixing any troubleshooting occurred during continuos running.

The contract with Mitsubishi Toshiba Corporation ended at 01. Feb. 2008.

- From 2002 to 2006:

S.N.P. PETROM S.A. – Petrobrazi Petrochemical Work – Brazi, Romania

Energetic Unit, DCS Turbines Operator in the Cogeneration Power Plant;

Responsibilities:

Ensuring the safe and efficiency operation of the gas turbines by the control panel.

Working as DCS Turbines Operator within the Energetic Unit of 2 x 25 MW Gas Turbine type Nuovo Pignone, endowed with Mark V Speedtronic logical controller (program made by General Electric).

Executing shut down and starts operations for the Cogeneration Unit, choosing the fuel – liquid, gaseous or mixed fuel.

Changing filters on fuel oil lube, hydraulic oil, maintaining the cleanliness of the gases turbine.

Following up the operating parameters: bearings temperature, exhaust temperature, differential pressure of the lube oil filters, control and hydraulic oil filters, fuel oil filters.

Technical data from Cogeneration Power Plant:

technological steam boilers type Heat Recovery Steam Generator with supplementary firing (Qn=135 t/h; Pn=36.5 barg; Tn=342.6 oC) designed by Hyundai Heavy Industries with Pillard burners;

technological steam boilers type Back-up Boiler (Q = 50.4 t/h; P = 36.5 barg; T = 342.6 oC) made in Korea with Hamworthy burners;

Nouvo Pignone MS5001 gas turbines P=26 MW/hour;

DCS (Distribute Control System) made by Honeywell;

- 2000-2002 PETROTEL S.A. Ploiesti Romania (Petrochemical Works)

THERMO – ELECTRIC POWER PLANT, DISPATCHER

Responsibilities:

Coordinating and taking active part in plant daily exploitation.

Working according to Plant Scope technology, a kind of DCS automatically controller of boiler by Honeywell computer.

Ensuring the functioning of the boilers with mixed burners – fuel both gaseous & liquid, type BALTUR EB 8 MNR produced by ENERGY - Italy

- 1993 – 2000 PETROTEL S.A. Ploiesti Romania (Petrochemical Works)

THERMO – ELECTRIC POWER PLANT, BOILERS – TURBINES SECTOR,

ENERGETICAL FOREMAN.

Responsibilities:

Coordinating during his shift the exploitation of the boilers and turbines.

Ensuring the normal running of equipment, adjusting work parameters for an efficiency running of the plant,

Talking appropriate measures to reduced energy losses.

- 1990 – 1993 PETROTEL S.A. Ploiesti Romania (Petrochemical Works)

THERMO – ELECTRIC POWER PLANT, TURBINES SECTOR SHIFT SUPERVISOR

Responsibilities:

Supervising and participate effectively in daily operations of the turbines during his shift.

Main equipment: three groups of turbogenerators with counterpressure of 3 x 12 MW/hour.

Executing all procedures for shut down and starts up of the plant during normal revisions or in emergency situations.

- 1984 – 1990 PETROTEL S.A. Ploiesti Romania (Petrochemical Works)

THERMO – ELECTRIC POWER PLANT

Responsibilities:

Operating the turbines belonging to three groups of turbogenerators with condensation of 3 x 12 MW/hour

-1981-1984 Power Plant CET BRAZI – Ploiesti Romania

THERMO–ELECTRIC POWER PLANT – TURBINES SECTOR, TURBINE OPERATOR

Responsibilities:

- turbine operator of four turbines in condensation installed power 4 x 50 MW/hour and two condensation turbine installed power 2 x 105 MW/hour

-

PROFESSIONAL SKILS

-Ability to analyze and synthesize scientific and engineering information.

- Technology experience: Allied-UOP cumene process

- Know chemical reactions in the cumene reactor and its side reactions, isopropyl-benzene major operating parameters for main equipment’s, chemical reactions in the Phenol oxidizer and its side reactions, operate cleavage reactors and distilation train.

- PLC,

- ISD,

- Start-up procedure for a compressors, pumps, air coolers.

- DCS system: Yokogawa, Honeywell.

-Ability to learn quickly in order to meet new requirements.

-Ability to set priorities and meet dead lines.

-Creative.

-Supervisory skills.

-Ability to work as a cooperative team member.

-High level of communication skills.

-Computer skills: MS Windows, Internet Browsing, Microsoft Office (Word, Excel, Power Point, Access) etc.

-Working in far away locations

Abilities:

- driving license B since 1979;

- good knowledge of operating PC (Office 97/2000/Xp)

- quick learning new softwares;

Hobbies:

Tennis, Travel, Literature.



Contact this candidate