Vernon Tarkowski
SUMMARY OF SKILLS
Primary experience in sheet metal work, light and heavy structure replacement and repair, blueprint reading, including inspections, drilling, installation of various tolerance fasteners and manipulation of various thickness of sheet metal, as needed to form patches and replace panel skins on a variety of aircrafts. Performed stringer and frame repairs. Various aircrafts include C130, C-12, Kingair 200/100, Caravan, Pulatus, CRJ 200, CH-47D, UH-60, B767200/250, RJ85, SAAB 340-3, F-18, MD-10, MD-11, KC-10, KC-135, C-17, C-5, A300, B747, B727, BAC-111, F-15, DC8, F-16 and F-5, AH-64 Longbow Helicopter, LUH-72 Lakota.
EDUCATION
1998
Boeing Blueprint Reading Class, San Antonio, TX
40 Hours
1990-91
C.A.D. Institute, Phoenix, AZ
Computer Aided Drafting and Design
1200 Hours
1985
Chanute AFB, Rantoul, IL
Aircraft Technology Course
180 Hours
1982
Chanute AFB, Rantoul, IL
Airframe Repair Specialist Course
402 Hours
1977-82
Denmark High School, Denmark, WI
High School Diploma
EXPERIENCE
Tarkowski Grain and Roasting
8/20
12/21
Operating heavy equipment/machines. Planting of crops with large equipment. Repair and maintain equipment, fabricate maintain replace large conveying equipment.
Gulfstream, Appleton, WI (Through PDS Tech ) – Laid off due to COVID
01/13/2020 –
3/24/2020
Aircraft Sheet Metal Technician Senior
Riveting, installing fasteners, Fabricating, Read blueprints and technical instructions, Use material tracking system, Ensure compliance with FAA paperwork. Performed skin replacements on the horizontal stabilizers on the G500.
08/2019 Oshkosh Defense
01/2020 Assembler
Removal and installation of components on JTLV (Joint Tactical Light
Vehicle). Verify an array of torque values on this vehicle. Approximately 60 on this vehicle.
05/2019 Dynamic Drinkware
08/2019 Maintenance Technician – Not related to Aerospace
06/2017 Omni Glass and Paint
04/2019 Fabricator
Select applicable material, cut to size from dimensions on prints provided, drill holes specifically at correct orientation and window locations in said material, prep cut material for assembly.
Order various materials for specific application, assembly of parts with weather caulk and screws in proper order and orientation
Install weather vinyl to the proper location on frames
Customize doors to customer’s specific needs, build custom door frames to match the doors
12/2012 Basler Turbo Conversion
05/2016 Aircraft Services Technician
Adjust, repair, rework, or replace parts and assemblies to eliminate malfunctions and to ensure proper operation.
Heavy structures repairs which included skins, stringers, doubler repairs on the D-3.
Performed major mods that include skin, floor, frame, and stringer repairs
Align and fit structural assemblies manually, or signal crane operators to position assemblies for joining.
Align, fit, assemble, connect, or install system components, using jigs, fixtures, measuring instruments, hand tools, or power tools.
Assemble prefabricated parts to form subassemblies.
Assemble, install, and connect parts, fittings, and assemblies on aircraft, using layout tools, hand tools, power tools, and fasteners such as bolts, screws, rivets, and clamps.
Attach brackets, hinges, or clips to secure or support components or subassemblies, using bolts, screws, rivets, chemical bonding, or welding.
Capture or segregate waste material, such as aluminum swarf, machine cutting fluid, or solvents, for recycling or environmentally responsible disposal.
08/2012
09/2012
03/2012
07/2012
12/2011
-02/2012
Strom Contracting Company
Contracted to Spirit Aerospace, Tulsa, OK
Wing Assembly of G-280
Unemployment
Allentown, PA
TSI Aerospace Contracting Company
Contracted to American Eurocopter, Columbus, MS
Structural Installation of Security and Surveillance System on LUH-72 Lakota for U.S. Army
09/2011
-11/2011
Strom Contracting Company
Contracted to Air Cargo Carriers
Fabrication of parts to .030 to .003 tolerance for C12 Platform Integrated Mission Systems.
04/2011
-09/2011
TSI Aerospace Contracting Company
Contracted to American Eurocopter, Columbus, MS
Structural Installation of Security and Surveillance System on LUH-72 Lakota for U.S. Army
Performed stringer and doubler repairs on the LUH-72
08/2010
-04/2011
TSI Aerospace Contracting Company
Contracted to Sikorsky, Global Helicopters, Coatsville, PA / Structures Mechanic
S92 Structural Completion
05/2010
-07/2010
Airplanes, Inc. Contracting Company
Contracted to Kallita Air, Oscoda, MI / Structures Mechanic
D-check B-747.
Performed seat track and cargo door repairs adding doublers on the B-747.
Performed stringer repairs as well on the B-747
04/2010
Aerotech Contracting Company
Contracted to Northrup Grumman, Lake Charles, LA / Structures Mechanic
C-check, J-Starr, B-707
Performed stringer and doubler repairs on the B-707
Performed seat track repairs and installations on the B-707
01/2010 03/2010
Strom Contracting Company
Contracted to Yulista Management Services Fort Knox, KY / Structures Mechanic
AH-64 Longbow Helicopter (ASPI) Hastelloy bulkhead structural installation. Including cutting and removal of existing B/H, locate and install new hastelloy B/H and clips per print.
08/2009
12/2009
Strom Contracting Company
Contracted to Air Cargo Carriers for L3 Communications, Milwaukee, WI
Reading and understanding blueprints for fabrication and installation of integrated mission systems C 12, Kingair
Installed communication antennas that included stringer and doubler repairs.
Installed seat track on the C-12 King air
04/2009
07/2009
STS Services Contracting Company
Contracted to ATR for Delta Airlines Atlanta, GA / Structures Mechanic
Prototype structural install of Aircell avionics rack and antennas on B737 and install on B757.
Read and understand engineering drawings, location of precise dimensions and drilling of precise holes
02/2009
03/2008
STS Services Contracting Company
Contracted to Kallita Air, Oscado, MI / Structures Mechanic
B-747, 727, DC-10, C-check various structural tasks including and understanding Boeing blueprints, SRM’s and Kallita Air engineering orders.
Locating and drilling precise holes.
Performed seat track and cargo door repairs on the B-747, 727, and DC-10.
03/2008
12/2006
Tarkowski Grain and Roasting
(out of aviation)
11/2006
10/2006
PlaneTechs Aviation Contracting Company
Contracted to Evergreen Aviation Technology, Taiwan / Structures Mechanic
Locating and drilling precise holes from Boeing blueprints.
Systems Structures Installation
Modified Boeing 747 to carry parts for the 787 Dreamliner
07/2006
11/2005
Aerotech Aviation Contracting Company
SNC Integrated Mission Systems, MD / Structures Mechanic
Reading and understanding blueprints for fabrication and installation of integrated mission systems C12, Kingair 200/100, Caravan, Pulatus, C130
10/2005
08/2005
Aerotech Aviation Contracting Company
Bombardier Aerospace, Bridgeport, WV / Structures Mechanic
Heavy structure modifications, C-checks on CRJ 200
07/2005
05/2005
Dyncorp, Fort Campbell Army Airfield, Fort Campbell, KY
Perform MWO structural installation of CMWS, IBF, FBFT on UH-60 helicopters including locating of intercostals, clips, etc. to internal structures and reinforcing of existing internal structures and external straps, doublers, etc. per blue print.
04/2005
01/2005
Dyncorp Coleman Army Airfield, Mannheim, Germany
Perform mechanical, structural modifications and repairs on UH-60 helicopters including locating of intercostals, clips, etc. to internal structures and reinforcing of existing internal structures and external straps, doublers, etc. per blue print
12/2004
08/2004
Defense Support System LLC., Fort Bragg, NC
Performing phase reset, sheet metal inspections and structural repairs on CH-47D
08/2004
04/2004
Airplanes Inc. Contract Company
Contracted to Pemco, Dothan, AL
Cargo belly skin replacement, C-check structural tasks DC-9
04/2004
11/2003
PlaneTechs Aviation Contracting Company
Contracted to Timco, Lake City, FL
Airframe repair, heavy structures and interiors on RJ85 and SAAB 340
11/2003
10/2003
PlaneTechs Aviation Contracting Company
Contracted to Lockheed Martin, Greenville, SC
Heavy structures P-3s
10/2003
08/2003
PlaneTechs Aviation Contracting Company
Contracted to Pemco, Birmingham, AL
Structures on C-130s
06/2003
11/2002
PDS Aviation Contracting Company
Boeing Aerospace Support Center, Cecil Field,
General Mechanic, heavy structures on F-18s
07/2002
07/2001
Gore Design Completions, San Antonio, TX
Interior installer, fabricator on B767-200/250
07/2001
07/1998
Boeing Aerospace Support Center, San Antonio, TX
General Mechanic, heavy structures on MD-10, MD-11, KC10, KC-135 and C-17
06/1998
02/1998
Mooney Aircraft Company (closed), TX
Sheet metal mechanic,
P-3 Orion horizontal stabilizer structural assembler
02/1998
06/1996
Lockheed Martin, San Antonio, TX
Sheet metal mechanic, heavy structures and inspector on C5
06/1996
03/1996
Dee Howard Company (bought out by Singapore International), San Antonio, TX
Sheet metal mechanic, airframe repair on A300, B747, B727 and BAC-111