BALAMURUGAN SHANMUGAM
Mobile.No.+91-915*******
adu1pe@r.postjobfree.com
CAREER OBJECTIVE:
Seeking growth oriented career in mechanical development. As 9YEAR 6 MONTHS of experience in the field of thermal power plant erection, commissioning and operation .i offer these qualities which shall be of tremendous potential to your company and a great human resource asset.
EDUCATION QUALIFICATION:
For under graduate –Diplamo in mechanical engineering in mahath amma polytechnic, college.
(under anna university Chennai), ariyur, pudukkottai . WORKING EXPERIENCE:
ORANISATION : B. Selvakumar mechanical contractor, salem. Work As : Construction Supervisor-Mechananic
Work since : June 17-2013 to August 09-2017
Work involved : Electrostastic precipitator, Air pre heater, Back filter, Cooling tower
(induced draft type),Boiler structural, Ducting, Integral piping, pressure parts, Non pressure parts, and SR&RT Report works)
ORANISATION : AL.JAZIRAH For Tradeing & Industry CO.LTD,RIYATH,SAUDI ARABIA. Work As : Boiler Plant
Work since : August 30-2018 to AUG 1 2021.
Work involved : Boiler,AAC,RD,Centac,Soot blower,Water softner Operation and Maintanence
ORGANISATION : THERMAX ONSITE ENERGY SOLUTION
WORK As : 2nd CLASS BOILER OPERATOR
Work since : OCT 19 2021 to TILL DATE
Work involved : 20TPH boiler & 40L Kcal /Hr thermopac heater, operation and maintanence
PROJECTS HANDLED:
PROJECT : Ms Sun Flag Iron & Steel Co Ltd,(From March 17 to August 17) PCI Bag house &Sinter plant Ducting,Bhandara,Maharastra. As a construction supervisor where in boosted up the fabrication,erection and commissioning activitiesof PCI (Pulverised Coal injection) Bag house work &Sinter plant ESP to ID to chimney Ducting Erection work of sinter plant. PROJECT :Ms Primer Mills Fine Lines Pvt Ltd.(From Dec 16 to March 17) 12 Tonnes PP,SIPCOT Perundurai,TamilNadu.
Supplied by Thermax limited,Pune
Worked As a construction supervisor where in boostedup the Fabrication,Erection
&commissioning activities of 12 TonnesBoiler Bag filter work. PROJECT:Ms BLA Power Plant,(From Oct 16 to Dec 16) 45MW CPP,narsingpur,Madhya Pradesh.
Worked as a construction supervisor where in handled erection of induced draft type cooling tower condenser-cooling tower pipeline,fuel feeding chute,tie rod cooler & ESP shutdown works.
PROJECT:Ms Anjani Cements Portland Ltd,(From July 16 to Sep 16) 18MW CPP,Chintalapelam post,Nalagonda,Telungana.
Supplied by Thermax limited,pune.
Worked as a construction Supervisor where in handled 90 TPH electrostastic precipitator erection & boiler Ducting (PA fan,FD fan &convention Bank to Economizer),APH to ESP(I)&ESP(O) to ID fan Ductings works.
PROJECT:Ms Hermes distillery Pvt Ltd,Yadrav village,Raibag,Belgaum,Karnataka 33TPH AFBC Spendwash Fired boiler&ESP work.(Nov 15 to June 16) Suppiled by Ms Thermax limited,pune.
worked as a erection supervisor where in handled 33TPH Boiler &ESP Erection works. PROJECT:TamilNadu Print and Paper Pvt.Ltd-Thogamalai,Manaparai. ESP and APH Erection and commissioning work,( Jun 13 to July 14) OPERATION AND MAINTANENCE:
PROJECT: KING SAUD UNIVERSITY,Riyath,Saudi Arabia(Aug 18 to AUG 21 ) Ms AL JAZIRAH FOR TRADEING AND INDUSTRY Co.Ltd,
Worked as a 4*36TPH BABCOCK AND WILCOX BOILER And 2*18 TPH BABCOCK AND WILCOX BOILER,AAC,RD,CENTAC,SOOTBLOWER,WATER SOFTNER Operation and maintanence work
PROJECT: PREMIER FINE LININS P.LTD ERODE(OCT 19 2021 TO TILL DATE) Ms ARCHANCE HR SERVICE,BANGALORE
Work as 20 TPH CPRG 20 BOILER,40L Kcal/hr TERMOPAC HEATER,SOOT BLOWER,WATER PARAMETER,FUEL GCV,FUEL ASH,FUEL MOISTURE,ASH HANDLEING,FUEL HANLING,Operation and maintainence
PERSONAL DETAILS:
DOB : 05/05/1995
Language known : English,Tamil&Hindi
Permanent address :10/91 Mapillaiyar Kulam,
North 4th street,Pudukkottai.
Passport No :R3498729 Ex.Date 20/07/2027
I hereby declare that the details above are true and correct to the best of my knowledge Date: BALAMURUGAN SHANMUGAM