MURALI NATARAJAN Production associate.
ADDRESS: ABOUT ME:
*/***, ******* ******, * was worked in the car manufacturing industry for around 12.7
years I have a broad knowledge on manufacturing. I was worked in
Thuthipattu (post),
Engine assembly and Instrument panel assembly. and I have the ability to
Ambur -635811, fix problems there. And I am now searching for the new job carrier
opportunities.
Thirupattur -DT.
EXPERIENCE:
Mobile : 996-***-****
FORD INDIA PRIVATE LIMITED (2010-2022) CHENNAI.
Mail ID : adtvrc@r.postjobfree.com
• Act apprentice. (2010-2011)
DOB: 31/05/1989
• Training apprentice. (2011-2013)
Marital status: Married • As an employee for till to date. (2013-2022)
• Responsible for assembly production. (achieve target volumes
SKILLS:
/improve FTTQ/ reduce inventory)
• Analysis the problems • On time feedback and drive back resolve inline build concerns with
• Kaizens implementation proper CFT proactively.
• Preventive maintenance • Able to understand the quality of work and analyse problems
• Problem solving accordingly and get taking ICA and PCA action on time
• MS office • Co ordinating manpower resource in pandemic situation and
• Team player organising the our teams.
• Scrap movement • Follow the plan production tasks and schedules according to
• Online repair work experience customer orders.
• Inventory management • Daily preparation of production report.
• Hoist handling • Implement product engineering changes related the production.
• QLS/Tools Net/ RBM/Qlscm • Knowledge about failure mode and effects analysis DCP, CONTROL
programme handling. PLAN, REACTION PLAN.
• Follow the safety instruction and below the documents QIS,
QUALIFICATION: VISUAL AID, SINGLE POINT LESSON, WOS.
• DEEE completed in first class • Team board and score card monthly update and involve to achieve
(2009) with honours from the targets.
Pandiyan polytechnic collage at KEY ACHIVEMENTS:
Thirupattur.
• RBM conveyor made to work only during Engine or Reinput.
TRAINING ATTENED:
Power cost up to RS. 32457 per year.
• FMEA • In op: 220B Rocs Rundown RPM increased without affecting
• SIX SIGMA quality reduced cycle time by 3sec per engine.
• ERROR PROOFING • Machining cost avoided by removing NVA hole in oil pump saving
• 5S RS. 1 per engine.
• KAIZEN • Isolated CKP adaptor process using Dc tool to eliminate process
• PERSONALIZED SAFETY miss.
• COST SAVING • In op:275 By relocating cylinder head gasket rack and the walking
• NVA distance during bump crew orientation.
• Automatic spindle reverse when any bold not achieve torque in
LANGUAGE KNOWNS: op:290b eliminated NVA.
• Tamil & English • IP line Buyoff every pallet locator painted with yellow colour to
avoid instrument panel fall down.
• As part of the global caring participation and contribution.