Post Job Free

Resume

Sign in

QA/QC Engineer

Location:
Al Dafna, Qatar
Posted:
December 02, 2022

Contact this candidate

Resume:

C U R R I C UL U M V I T A E

SABIR MALLICK

DOHA (QATAR)

+974********

+919*********

adttul@r.postjobfree.com

Personnel Reference of Qatar Energy Staff –

(1) Mr. Darshan Singh Gurbax Singh ITN/424)

(2) Mr. Yousif Ameen (ITN/42)

Father’s Name : Md. Abul Khair Ahmad

Date of Birth : 18th October 1974

Marital Status : Married

Nationality : Indian

Religion : Islam

Passport No. : L3892421

Date of Issue : 25th February 2014

Date of Expiry : 24th February 2024

Edu. Qualification : Bachelor’s in electrical engineering

Diploma in Electrical Engineering

Certification : ISO 9001:2015 - IMS Lead Auditor Course

: ISO 14001:2015- Lead Auditor certified

: ISO 45001: 2018 Lead Auditor certified

: ASNT NDT LEVEL II (MT, PT, UT, RT) certified

: Attended the LEEA Technical Seminar; Doha

: H2S & BA Training

Offshore Training : HUET ( Helicopter Underwater Escape Training)

: T- BOSIET (Tropical Basic Offshore Induction & Emergency Training

: Familiarization. Permit to work (PTW) system,

: Working at height (WAH)

: Hazardous material awareness and IIF (Incident and Injury Free)

Professional Experience : More then 14 years’ experience in Gulf Region in field of Quality Control in Electrical & Instrumentation, IT & Telecom Engineering in Oil & Gas Plants, Refinery, High Rise Buildings Mega MEP Projects.

EMPLOYMENT HISTORY:

1. Company : Mekdam Technology

: From Nov. 2018 to Till Date

Project (1) : EPIC FOR PAGA, CCTV & TALKBACK IN VARIOUS ON-SHORE GAS OPERATIONS PLANTS & NFA OFFSHORE PLATFORM

Client – Qatar Petroleum

Project (2) : EPIC OF CNG STATION IN RASLAFFAN AND MESAIEED INDUSTRIAL CITY

Client – Qatar Petroleum & Woqod

Project (3) : DOHA INTERNATIONAL AIRPORT REFURBISHMENT

Client – Consolidated Contracting Company (CCC), Al-DAR Consultant

Project (4) : PEARL QATAR FOUR-SEASON HOTEL

Client – DARA Engineering Consultants

2. Company : Consolidated Gulf Co.

Term : January 2010 to Oct. 2018

Project (1) : Procurement & Installation of IT Infrastructure for NAKILAT SHIP REPAIRE YARD (Phase 1 & 2).

Client – Qatar Petroleum

Project (2) : EPIC for Electrical & Telecom Utilities for Support Service Area Phase I & II, West end extension of Raslaffan City.

Client – L & T / ECC

Project (3) : EPIC for Wet Utilities Distribution Network Service for SSA & West End Extension of RasLaffan - Package 1

Client – Al-Jaber Engineering Corporation

Project (4) : EPIC of Joint Forces, Government and Cost Guard Telecom Buildings, Raslaffan

Client – Jaber Trading Contracting Co.

Project (5) : BARZAN ONSHORE PROJECT (RASLAFFAN)

Client – JGC

Project (6) : QSTec Polysilicon Project- Phase 1

Client – Punj Lloyd

Project (7) : EPIC for Field Telephone at GDS Stations, NGL 1 & 2, Tank Farm and Multi Product Berth (Gas Operation)

Client – Qatar Petroleum.

Project (8) : National Museum of Qatar (QNM)

Main Construction, MEP, Fit Out and Finishes Package B &C

Client – Hyundai Engineering & Contraction.

Responsibilities:

Preparation & Implementation of Project Quality Plan and Quality Control Procedure as per 9001:2015

Preparation & Implementation of Inspection and Test Plan.

Material Inspection of new Procure material for project according to PO, Data Sheet & Material Submittal.

Routine Surveillance inspection at site for installation of PAGA System, Structure Cabling, CCTV System, and Backbone Fiber Optic Cabling, Underground duct trenching, Cable tray and skirting.

Inspection of Manhole.

Routine Surveillance inspection at site for installation of SDH Equipment, PDH Equipment, Telecom Supervisory System & PMS Networking Switches, PABX System, Structure Cabling and Fiber Optic Cabling

Ensuring that the drawing using by site supervisor for construction is approved and latest revision.

Maintaining RFI Log register and NCR log register.

Assisting to subordinates to full fill the requirement of IMS.

Conducting Internal Audit as per ISO 9001:2008; ISO 14001:2004; OHSAS18001:2007

Raising Punch List and follow-up until closeout.

Organize Witness Inspection with client according to Inspection and Test Plan.

Identify the Non-Conformance & raising NCR and follow-up for closing with satisfactory corrective action.

Reviewing the document & Drawing like SAT procedure, Method Statement, FAT Procedure prior to submission to client.

Ensure that the Quality of Material Used in construction and Quality of all Equipment installed is in accordance with Project Specification complying with the standard.

Ensuring that the Test Equipment are being use at site is calibrated and Calibration Test Certificate is available for Client Review.

Verifying the Red Line Mark-up Drawing and actual Installation is in line.

Submission of RFI to client after acceptance in internal inspection.

Verifying the work done according to Project Specification & Standard.

Preparation of Method Statement, Site Acceptance Test Procedure and Factory Acceptance Test Procedure with the coordination of Discipline lead engineer.

Aware for NFPA Standards & QP Standard for Fire and Safety Philosophy.

2. Company : American Engineering Services (AES) Arabia Ltd.

Project : Phenolic Facilities Project (Saudi Kayan Petrochemical Co.)

Al-Khobar, Kingdom of Saudi Arabia

Term : Jan. 2009 to Dec. 2009

Consultant : Flour Arabia Ltd.

Position : QA/QC Engineer (Electro-Mechanical)

Responsibilities:

Directly Reporting to QA/QC Manager

Routine Material Inspection of new Procure material such as Steel Sheets, flange, dished, Nut-bolts, fittings, Pipes, Electrical Pumps, Instruments etcetera for project according to PO, Data Sheet & Material Submittal & Client Standards as well as ASME/ ASTM Standards.

Routine inspection during manufacturing of all type control panel for Reverse osmosis, Dosing

Skid etc.

Fit up and welding inspection all type for structural fabrication work such as Piping Spools, Storage Tank, Chemical injection dosing skid.

Process Inspection of Galvanizing.

Hydro testing/ Pneumatic testing of Piping Spools and Storage Tanks.

Coordinating with TPI for Witness / Hold Points Inspection as per approved Inspection Plan.

Preparation of weld joints for Radiography.

Inspection of Control Panels.

Inspection Dosing Skid, Reverse Osmosis Plant.

Preparation & implementation of Inspection and Test Plan ( ITP)

Raising and Closing of Material non conformance report.

Familiar with ARMCO, SABIC, Standards.

Familiar with ASME, ASTM, NFPA, DIN, NEEMA standards.

Conducting witness inspection with client as per Inspection and Test Plan.

Co ordination with Testing Commissioning team and Subordinate Staff.

3. Company : M/S Trading Engineers (International) Ltd.

New Delhi, India

Project : Mathura Refinery

Term : February 2004 to Jan. 2009

Position : Electrical Site Engineer (Projects)

4. Company : M/S Sew Engineering works (Pvt.) Ltd.

Term : September 1999 to December 2001

Position : Site Engineer (Electrical)

Duties and Responsibilities :

Routine Area Surveillance of Electrical & Instrumentation erection activities

Inspection & Witnessing according to Project Specification and QCP & ITP

Established field inspection & Testing Procedures for E & I works with the assistance of Site Project Engineers.

Inspection for the installation of Communication system, i.e. Telephone Line, Computers, Paging System and CCTV Camera, Fire Alarm system, Loudspeakers etc.

Inspection for the installation of Fiber Optic Cable, Profibus Cable, Ethernet System and MODBUS system Cable etc.

Inspection for the Installation of Field mounted Instruments, Junction Boxes, Local Panels, Pneumatic Leak Test of Air Line Tubing /Impulse line tubing, Insulation Resistance test and Continuity Check for Electrical & Instrumentation Cables.

Inspection for the Installation of DCS Panel, ESD Panel, Fire & Gas System Panel, Consoles & Computers with Printer, Communication system panel and Weather Monitoring System in the Main Control Building.

Inspection for the Installation of CCTV camera & Speakers in the Electrical Substation SIHs and Main Control Building.

Also witness the Electrical HV & MV cable and Fibre Optic cable Splicing as per the approved drawing and Specification

Inspection for the Electrical & Instrument Cable Trenches prior to cable Pulling and after Cable Pulling to release for the next activities. Also inspection of Cable ladders and Cable trays in the Field, Electrical Substations & Main Control Buildings. Inspection for the Field Electrical and Instrumentation cables, Underground and Above ground cables and Fiber Optic Cable Installation

Inspection for the Installation of Grounding Cable and Bus bar in the Field and Buildings and Connection to the equipment as per the approved drawing and specification.

Inspection for the Installation of Fire & Gas System in the Field such as Push Button, Horn & Beacon and Fire Detection System.

Also Coordinates with Clients Project Inspection Unit for project Inspection and Stage wise activities for Witness or Hold Points.

Mechanical completion Inspection for final Area release, Area Punching and Punchlisting, Processing and Updation of QC documentation, QC Dossier and Implementing the QC plan.

Co-ordinating with Consultant and Clients for the final acceptance of the plant hand over.

Assists in the Preparation, Review and Updating of Company’s Quality Control manual and operating procedures in accordance with the ISO 9000 Quality Control System.

Preparing QCP’s and ITP’s and Inspection Checklist for procurement and construction according to Project quality Plan (PQP).

Preparing and Answering Project technical Query (PTQ)

Overseas the Documents Control management and ensures the availability of Current Client Engineerig Standards, procedures and industrial Codes and Standard.

Familiar with International standards NACE, ASTM, DIN, BSI, IEC, ANSI, API, NEC, NEMA

Also familiar with latest Calibration Certificates, all test and measuring instruments are in operational and calibrated condition which will be utilized.

Also responsible for Checking, verifying and Reviewing the Construction drawings Covering Specification, IFC, P&ID, ILD and other attachments prior to installation.

Effectively Co-ordinates with other related disciplines.

Also aware of Safety rules and regulations, conducted weekly safety Auditing and reporting, participated weekly safety meetings and familiar with all relevant safety induction like 100% Fall Protection, Confined Space Entry and Precommissioning priority etc.

Sabir Mallick



Contact this candidate