Dear Sir,
Sub: - Application for Team Leader / Head-Operations / COO
I am a Graduate in Civil Engineering from Jawaharlal Nehru Technological University. I have 38 years of experience in Execution and Techno Commercial activities on Water related Turnkey Projects starting from Reconnaissance survey to Commissioning & Maintenance. I have gained good experience from the following functions.
1.As Government Engineer from Government of Andhra Pradesh for more than 13 Years on Execution of EPC projects and their Operation & Maintenance of Lift Irrigation, Bore Wells & Water Supply Projects.
2.As Consultant Engineer from Design & Supervision Consultants for 2 Years on ADB Funded Project for RUIDP and handled 10 packages of Water and Waste Water Projects.
3.As Contractor’s Engineer in Management cadre for more than 23 Years on Execution, Coordination-Monitoring, Operation and Maintenance of multiple Projects of Water Supply, Sewerage network and Treatment works ie 12 projects funded by ADB, 1 project funded by JICA, 1 project funded by World Bank under FIDIC Conditions of Contract and around 35 projects funded by State and Private Bodies.
I have rich experience in executing EPC/Turnkey/DBO Projects/ Works Designed by Employer including their maintenance of Water & Waste Projects. My Profile summary is
a)Project Planning, Execution within budgeted cost & time frame. Control of Techno commercial issues of Projects. Coordination of multiple Projects from HO. Progress Monitoring and Reporting to HO. Rescheduling and reallocation of resources.
b)Business Development: interacting with Clients & Consultants for upcoming projects. Attending the Pre Bid meetings and getting conditions favourable to company to suit existing qualifications of company. Monitoring & Guiding on Bid preparation. Liaisoning pre and post Bid operations.
c)Preparation & scrutiny of Joint Venture Agreements. Executed a Project of JV Contract.
d)Ensuring proper interaction with vendors, contractors, consultants & other Local Statutory Authorities for smooth running of the project.
e)Determine Contracts/Orders & Contractors & Vendors.
f)Contract Management & Execution of Works under DBO-EPC, LSTK, Item Rate Works, and Construction Works Designed by the Employer, Design-Build and Turnkey Projects and under State Contracts. Had hands on a PPP model 24x7 model Water Supply Project.
g)All Subcontracts, Procurement Management and their billing with Cash Out flow statement with cost control on the project. Budgeting, Cash inflow, Clients’ Billing, Extra claims & Correspondence. Lead, guide & motivate a team of engineers to achieve targets on time.
h)Attended to training on Practical use, Management and Administration of FIDIC conditions of Contract. Attended to Workshop conducted on Contract Management & Administration.
Given an opportunity, I shall perform to the entire satisfaction of the management.
Thanking you,
Yours truly,
(G.RADHAKRISHNA MURTHY)
Mobile:+91-948******* / 929-***-**** and +919*********( PP-India )
CIRRICULAM VITAE
Name of Candidate
RADHAKRISHNA MURTHY GUNTUPALLI
Father’s Name
GuntupalliVeeraRaghavulu
Address
D.No: 7-158, Near SBI
Dachepalli (PO) GUNTUR-522414 ( AP ) INDIA
Mobile:+91-948*******/ 929-***-****
Email::**********@*****.**.**
SKYPE ID:: murthy4401
Alternate Contact Ph:944******* / 944*******
Emergency Contact: Chandra Sekhar: 900*******
Date of Birth: 21-06-1965
Place of Birth: Dachepalli (A.P)
EDUCATIONAL QUALIFICATIONS :
Sl. No
Exam Passed
School/College/ University
Class/ Division
% of marks
Subject
Year of passing
1
S.S.C
ZPH School, Dachepalli-522414
I
72.33
C. Maths
1981
2
DCE
MBTS Govt. Polytechnic College-GUNTUR-05
I Class with Distinction
84.75
Civil Engg
1984
3.
B.Tech
JNT University-Hyderabad
I
64.63
Civil Engg
1990
4
Computer Knowledge
MS Office, MS Project
1996
5
PGDEEM (PG Diploma in Environmental Education and Management)
University of Hyderabad, Hyderabad.
2002
TRAININGS / WORK SHOPS
1
RUIDP-Jaipur ADB funded
Work shop on Construction Management conducted by RUIDP-ADB funded Project. Ranked III in the assessment session on Contract Management & Administration
2
FIDIC
FIDIC Training course on Practical Use, Management and Administration of FIDIC Conditions of Contract conducted by International Federation of Consulting Engineers and Consulting Engineers Association of India (CEAI)
Passport Number::N 1860984 Valid Up To 03-08-2025
PROFILE SUMMARY, KEY ROLES & RESPONSIBILITIES
Leading a Team of Engineers in Design stage as well as in execution and maintenance. Interaction with consultants for obtaining designs and getting its approvals.
Commercial: Dealing with Techno commercial aspects of project. Budgeting and approaching Banks for Financial assistance with the help of finance department. Preparation of schedules as per Bankers requirement and getting their approval. Getting release of Loans and planning their re payment.
Contract Management: Highlighting contractual obligations at the time of tendering, during execution and taking measures to follow them. Whistle blowing on project delays, missing deliverables and receivables. In time alerting the execution team/HO on bill submissions, variations and bill payments. Following and implementation of FIDIC conditions of Contract. Observation of BOQs and raising extra items/variations claims to the department and pursuing. Having idea of arbitration. Contract Management & Execution of Works under DBO-EPC, LSTK, Item Rate Works, and Construction Works Designed by the Employer, Design-Build and Turnkey Projects and under State Contracts. Had hands on a PPP model 24x7 models.
Sub Contract Management: Selection of sub-contractors/suppliers for execution of work. All Subcontracts, Procurement Management. Billing of sub-contractors, scrutiny and their payments. Cash Out flow statement with cost control on the project. Budgeting, Cash inflow, Clients’ Billing, Extra claims & Correspondence. Lead, guide & motivate a team of engineers to achieve targets on time.
Planning & Billing: Project Planning, Execution within budgeted cost & time frame. Coordination of multiple Projects from HO. Progress Monitoring and Reporting to HO. Rescheduling and reallocation of resources.
Operation & Maintenance: Preparation of Annual Maintenance Plan, submitting to Bankers for Financial assistance with repayment plan of action. Setting up of customer care centers for Preparation of customer bills based on water consumption, serving the bills to customers, revenue collection as well as for attending problems.
Business Development: I have personal relation with Govt authorities with most of the Sates in India as I have worked almost in all the states. Interacting with Clients & Consultants and obtaining information on for upcoming projects from Govt and Private sector. Meeting Political authorities for trouble free execution and bidding. Monitoring & Guiding on Bid preparation. Interacting with Clients & Consultants for upcoming projects. Attending the Pre Bid meetings and getting conditions favourable to company to suit existing qualifications of company. I have dealt with almost major states in India. It would be an added advantage for me in Business development.
Joint Ventures: Preparation & scrutiny of Joint Venture Agreements. Finding out a suitable JV partner and closing the deal. Executed a Project under JV Contract.
Estimation & Costing: Preparation and monitoring of Rate analysis, Estimation and costing of projects for bidding purpose and for execution purpose after winning the project.
Investigation & DPR Preparation for WSP: Had hands on preparation of DPR for various projects starting from reconnaissance survey to submission of DPR in full shape.
Execution of Projects:
Interaction with client for getting approvals of designs, variations, reconciliations, extra claims and execution related issues.
Have 10 Years working experience in the state of Karnataka and conversant with Kannada language. In addition to this I have worked in the states of Rajasthan, Delhi, Orissa, Andhra Pradesh, Tamilnadu, Kerala, Maharashtra, Chattisgarh and Bihar.
Establish & maintain specific project procedures for Design / Construction Supervision, Review weekly & monthly reports as presented by Design Consultant/Contractor & present to Company comments of non-compliance, Contractor transmittals.
Project Planning, Execution within budgeted cost & time frame. Coordination of multiple Projects from HO. Progress Monitoring and Reporting to HO. Rescheduling and reallocation of resources.
Contract Management & Administration under FIDIC Conditions of Contract and Under Indian Contract Conditions. Finalisation of Claims and Variations with client.
Overall in-charge of Development, Construction and Erection of Civil Electro-Mechanical, Environmental works. Planning of Resources (Manpower & Equipment) and Scheduling & Site Installation. Preparation of Method Statements / Work Procedures for Quality Control.
All Subcontracts, Procurement Management and their billing with Cash Out flow statement with cost control on the project. Budgeting, Cash inflow, Clients’ Billing, Extra claims & Correspondence. Lead, guide & motivate a team of engineers to achieve targets on time.
WORK EXPERIENCE
Sl.
No
Name of the Organisation
Designation
Employment
FROM
TO
Service
1
LCC Projects Pvt Ltd.
Chief General Manager
01.03.21
Till date
1
Gammon India Ltd
Regional Head
Jun-18
Feb-22
3Y 9M
2
Freelance
Freelancer
Jan-15
May-18
3Y 5M
3
Essel Infra Projects Ltd, Mumbai
Asst. Vice President
June-13
Jan-15
1Y 7M
4
Pratibha Industries Ltd., Mumbai
General Manager
Jan-10
May-13
3Y 5M
5
JMC Projects ( I ) Ltd-Mumbai
Dy .General Manager
Jun-07
Dec-09
2y 7M
6
DS Constructions Ltd., LIBYA
Sr Project Manager
Apr-06
Apr-07
1 year
7
Shah Technical Consultants Pvt Ltd.,
Sr. Consultant
May-04
Mar-06
1Y-10M
8
Aireff deTox Incineration Ltd.
Manager - Projects
Oct-99
May-04
4y -8M
9
A.P.S. Irrigation Developm. Corp. Ltd.,
Asst. Exe. Engineer
Jun-86
Jul-99
13y-2M
10
L & T Ltd., ECC Group
Civil Supervisor
Jan-85
May-86
1Y- 5M
**Proceeded on EOL from A.P.S.I.D.C.Ltd on Govt. approval and worked in SPML from July1998 to Jun1999
HISTORY OF EXPERIENCE IN MULTIPLE FIELDS
LCC Projects Pvt Ltd., Ahmedabad as Chief General Manager
As chief of all divisions of Organisation, Monitoring and coordination of the following Projects.
a)6nos of Dam and Barrage Projects for Irrigation for WRD-MP, DoWR-Orissa and IGNP-Rajasthan states.
b)10 nos of Lift Irrigation and Under Ground Pipeline Network Projects for Irrigation for the States of Maha Rashtra, Orissa, MP, Haryana and Rajasthan.
c)7 nos of Water Supply Projects including 4nos of Projects of Multi Village Water Supply Projects under Jal Jeevan Mission (Municipal and Rural Water supply Projects) for MPJNM and GWSSB.
d)2nos of Metro Rail Works for Ahemdabad City (Gujarat Metro Rail Corporation Ltd) involving the Works of Construction of Piers, Casting & launching of RCC Girders, Fabrication and launching of Steel Girders, Casting of Slabs for Concourse Level, Track Level and Platform Level, Fabrication and Erection of Roof structure-PEB and all architectural works including finishing works to a tune of 150Cr.
e)1 Project of RCC Utility Tunnel for GIFT City, Gandhanagar, Gujarat
f)1 Project of Desalination Plant for Adani Water
g)1 Canal Project for Narmada Valley Development Authority-Water Resources Department, MP
Total Value of works is around 3500Crs consisting thousands Kilometers of Pipelines of of MS, DI, uPVC, HDPE, PCCP, BWSC and hundreds of CWRs, MBRs, and ESRs, WTPs, Pump Houses and other ancillary works.
Gammon Engineers & Contractors Pvt Ltd (Formerly Known as Gammon India Ltd),
as Regional Head-Rajasthan from June 2018
Monitoring and coordination of 6nos of Municipal and Rural Water supply Projects of PHED-Rajasthan of total Value 1500Crs consisting DI Pipelines of 2695Kms, uPVC Pipelines of 4197kms, HDPE Pipe lines of 295Kms, BWSC Pipelines of 197Kms, 40nos of CWRs,2nos of MBRs, 1no of Raw water reservoir, 2nos of WTPs (42 & 30MLD), 853nos of ESRs/GLRs, 43nos of Pump Houses,1296nos of VTCs, 16542nos of PSPs, 5068nos of CWTs.
FREE LANCER
Started services to cater to the needs of Small Contractors and other customers. Site visits preparation of Rate analysis and quotes for the tenders. Preparation of Budget for the works, Planning, Preparation of bills, Reconciliation statements, meeting clients on behalf of sub contractors. Approaching Banks for Loans and getting approvals. Helping in Taxation and following Contract rules. Contract Management, issuing notices to client for site problems, payment of bills etc. Implementation of Labour acts and submitting reports to the Labour commissioner on periodical basis. Clients: Sub Contractors / Sole Proprietaries.
ESSEL INFRAPROJECTS Ltd.: Asst. Vice President-Water
Technical: Guiding on design/Plan/Execution of water/waste water works and their operations.
Commercial: Budgeting for project execution as well for annual maintenance of WSP and approaching Banks for Financial assistance. Preparation of schedules as per Bankers requirement and getting their approval. Getting release of Loans and planning re payment.
Execution of Project: Planning, arranging resources, rescheduling based on requirement, guiding execution staff, periodical site visits, cost cutting measures, intermediate reconciliation of cost, materials and bills. Billing to Sub contractors and bills from Client.
Operation & Maintenance: Preparation of Annual Maintenance Plan, submitting to Bankers for Financial assistance with repayment plan of action. Setting up of customer care centers for Preparation of customer bills based on water consumption, serving the bills to customers, revenue collection as well as for attending problems.
1.In Charge for 24 x 7 Water Supply Distribution Project in the area covered by the newly laid 150 MLD Water Supply Scheme” in Raipur for Raipur Municipal Corporation. Project Components: Supply & Laying of 170Kms of DI Pipelines of 100 to 600mm dia for Distribution network, 70000nos of House service Connections with Water Meters, Bulk Meters, O&M of 150MLD WTP, O&M of entire water supply network of RIPUR.
2.In Charge for (24x7 WSP) Rehabilitation, Construction, Operation, Maintenance & Management of Bhagalpur WSP 1. (BWSP1) for Bhagalpur Municipal Corporation, Project funded by ADB for the client:: Bihar Urban Infrastructure Development Corporation. Project Components: Supply &Laying of 325Kms of DI Pipelines of 100 to 600mm dia for Distribution network, 60000nos of House service connections with Water Meters, Bulk Meters Construction of 16nos of Intze type Over Head Tanks, Refurbishment of Treatment Plant and Tube wells, O&M of 3 WTPs of 35MLD Capacity, O&M of entire water supply network of Bhagalpur City-Bihar for 90 months including billing & Collection. Micro Tunneling/ HDD / Trenchless / Pipe Jacking for Crossing of High Ways and Railways / Canals for a length of 500mts
3.EPC works for 24x7 WSP for Aurangabad Municipal Corporation under PPP model partly funded under Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT).Project Components:: Approach Open Channel of 15 m long, RCC Jack well Cum Pump House of 36m dia, RCC Approach Bridge 360 m long and 9 m width, Raw water pumping machinery Head=73 m, 6 nos. ( 4 working + 2 standby), Raw Water rising main of MS pipe 2000x16mm for a length of 27 kms, Water treatment plant at Pharola Conventional type 192 MLD Capacity, Pure water Pumping machinery Head=127 m, 6 nos. ( 4 working + 2 standby), Pure water rising main 2000x20mm think for a Length of 12.2km, Main Balancing Reservoir at Nakshtrawadi 10ML Capacity, Transmission, Trunk and Feeder mains with MS Pipes ranging from 800 to 1400mm, 20 km length, Distribution system 1290 km of various diameters of DI & HDPE
4.Business Development activities: Interacting with Clients & Consultants for upcoming projects. Attending the Pre Bid meetings and getting conditions favourable to company to suit existing qualifications of company. Monitoring & Guiding on Bid preparation.
PRATIBHA INDUSTRIE Ltd; Mumbai: General Manager-Projects
1.BWSSB Project (II)–Bangalore Water Supply & Sewerage Board: Contract W5e:-Gammon India Ltd (51%) and Pratibha Industries Ltd (49%) Joint Venture. Pratibha has executed the 49% share of work directly under my leadership. Procurement, Fabrication and laying of Clear Water Trunk main from Vajarahalli to HBR on the East of Bangalore-Funded by JICA-under the consultancy of Nippon Jogesuido Sekkei Co., Japan, Mott MacDonald Ltd., UK, Tata Consulting Engineers Limited, Consortium (NMT ). Project Components-Manufacturing, Laying, Jointing & Hydro Testing of MS Pipe lines of 1600x12mm /1700x10mm / 1800x12mm Dia Pipes to a length of 19.5kms, Providing Lining & Guniting to MS Pipes at site Yard, Construction of RCC Valve Chambers and Pipe encasement works. Micro Tunneling/ HDD / Trenchless / Pipe Jacking for Crossing of High Ways and Railways / Canals for a length of 250mts.
2.BWSSB-KMRP-GBS 8A-: Providing Sewerage System to erstwhile Dasarahalli CMC Area (zone-8a)
under KMRP Funded by World Bank:: Project Components-Monitoring of 100km long Collection Net Work with RCC and Stoneware Pipes & Hydro Testing, Construction of Manhole Chambers, House Connections with PVC Pipes
3.Business Development activates (Southern Region): Interacting with Clients & Consultants for upcoming projects. Attending the Pre Bid meetings and getting conditions favourable to company to suit existing qualifications of company. Monitoring & Guiding on Bid preparation.
JMC Projects (I) Ltd., Mumbai: Dy. General Manager
Coordinator for the works with Indore Municipal Corporation:
MS Pipe line jobs mentioned below for Indore Municipal Corporation funded by Asian Development Bank under the PMC of LOUIS & BERGER INTERNATIONAL Inc.
WS-11 Lot-2
Manufacturing of MS Pipe of 2124mm OD with 14.2mm plate, 14Kms long, lining and Guniting, laying and jointing for water supply project. Value: Rs.48 Cr
WS-12 Lot-1
-do- 1848mm OD with 12mm plate, 20Kms long –do- Value: Rs.55.7 Cr
WS-12 Lot-2
-do- 1748mm OD with 12mm plate, 20Kms long-do-. Value: Rs.52.8 Cr
Investigation & DPR Preparation for WSP
Investigation & DPR Preparation for Proposed 50MGD Water supply scheme from Almatti Dam (Foreshore of Narayanpur Dam on Krishna River) to JSW Steel-Tornagallu, Karnataka. WSP is Consisting
Stage-I :: Head works like Intake, RCC Sump cum Pump House with 3nos(2+1) of 4750 Cum Capacity
VT Pump sets, HT 33/6.6KV Substation with 2x5MVa Transformers, Staff Quarters, Approach Road to Intake, MS Pipeline of 1648x12mm for 66Kms Long up to Break Pressure Tank and RCC Break Pressure
Tank including necessary Valves, Fittings and RCC Chambers for them.
Stage-II :: RCC Booster Pump House with 3nos (2+1) of 4750 Cum Capacity HSC Pump Sets, HT Substation, Staff Quarters for stage-II, MS Pipe line up to BPT, Break Pressure Tank, Service Road of 20KM Long with 3.5mts Carriage way including necessary Valves, Fittings and RCC Chambers for them
Stage-III:: MS Gravity Pipe line of 1548x10mm for a length of 106Kms from BPT to JSW, Delivery
Cistern at Storage Reservoir including necessary Valves, Fittings and RCC Chambers for them.
Execution of PROJECTS
JSW Steel Ltd
Toranagallu
Fabrication of MS Pipes of 700 to 1600mm OD pipes to a length of 15Km, lining and guntiting, laying and jointing for interplant piping for water supply. Laying & jointing of MS Pipes of 100mm to 600mm dia (Pipes supplied by JSW) to a length of 32Kms long for water supply.
UWSEIMP- funded by ADB for Bhopal Municipal Corp.
BPL-WW-03:: Operation of RCC Pipe Manufacturing Unit with ISI certification: Manufacturing of RCC Pipes of 200mm to 1000mm dia for JMC for Bhopal MC
BPL-WS-08::Supply, laying and testing of DI Pipelines of 256Kms for Transmission mains and Distribution network of 100-450mm dia with 10,000 nos of House Service Connections with HDPE Pipe for Bhopal Municipal Corporation.
Business Development in South India for getting new projects in Water / Waste Water Sector::
Interacting with Clients & Consultants for upcoming projects. Attending the Pre Bid meetings and getting conditions favourable to company to suit existing qualifications of company. Monitoring & Guiding on Bid preparation.
DS CONSTRUCTIONS Ltd., SWANI-LIBYA:::Sr. Project Manager
In charge for the work of Providing Water Supply facilities for Gharian Company for Development and Investment - GHARIAN Shabia (Municipality) OF LIBYA Nation under the consultancy of National Consulting Beuro-TRIPOLI.
Water Supply Distribution and Transmission lines with Ductile Iron Pipes of diameters ranging from 100mm to 800mm for a length of 175Kms including Construction of 1000nos of Valve Chambers.
Construction of 2nos of Ground Level Reservoirs of 6.7ML and 2ML capacity.
Construction of one pump house including providing pumps/motors and controlling equipment.
Renovation of one more pump house with new pumps, motors and controlling equipment.
Liaison with, Police & Local Statutory Authorities.
SHAH TECHNICAL CONSULTANTS Pvt. Ltd.::Senior Consultant
RUIDP-JAIPUR:: In charge for Supervision of Construction activities under the following Packages from Design and Supervision Consultants (DSC) for RAJASTHAN URBAN INFRASTRUCTURE DEVELOPMENT PROJECT (RUIDP)-JAIPUR under the Project Management Consultants of LOUIS & BERGER INTERNATIONAL Inc., Funded by Asian Development Bank.
JAI/WS/04+17
Construction and Commissioning of 75 +75 nos of Tube wells for Drinking Water
JAI/WS/15
Construction and commissioning of 3 nos of Clear Water Reservoirs (GLSR) & 8 nos of Elevated Service Reservoirs (ESR) of 1ML( 1000Cum) to 2 ML (2000 Cum)
JAI/WS/16
Providing, Laying, Jointing, Testing and Commissioning of various sizes of uPVC Pipe Line of 160Kms and DI Pipe line of 8.5Kms of 1000mm dia for WATER SUPPLY including construction of 250 nos Valve Chambers in various colonies of Jaipur.
JAI/WS/19
Construction and Commissioning of 4 nos of PUMPING STATIONS including Civil, Mechanical, Electrical, Instrumentation and Power connection works
JAI/WW/03
Supply, Installation, Testing and Commissioning of Sanitary Sewer lines of 46Kms with RCC pipes 150mm to 300mm dia,, and Construction of 2150 nos of Manhole Chambers with stone masonry including house service connections.
JAI/WW/04
-Do- lines of 35Kms with RCC pipes 150mm to 300mm dia, and Construction of 1530 nos of Manhole Chambers with stone masonry including house service connections
JAI/WW/10
Design, construction, Erection and Commissioning of Sewage Treatment Plant of Capacity 62.5 MLD ( 62500Cum/Day) including the maintenance of the Plant for a period of 5 years Near Delawas-Jaipur.
JAI/WW/11
Renovation and Modernisation of Sewage Treatment Plant of capacity 27 MLD (27000 Cum / Day) at Amer Road-Jaipur
JAI/WW/17
Supply, Installation, Testing and Commissioning of Sanitary Sewer lines of 42Kms with RCC pipes 150mm to 300mm dia., and Construction of 1650 nos of Manhole Chambers with stone masonry including house service connections.
Investigation & DPR Preparation for Water Supply Project for Indore City
UWSEIMP-INDORE: Participated in Survey and Data collection during DPR stage for Proposed Water Supply Project for Indore Municipal Corporation under Urban Water Supply & Environment Improvement in MP funded by ADB.
AIREFF DETOX INCINERATION Ltd. ::Manager-Projects
In charge for Southern Region in all respects- Monitoring, finalisation of contractors for civil, Electro-Mechanical and Erection works, Cash Flow, Billing from the clients and to Sub Contractors & Reporting to HO. Executed the following Turnkey/ EPC based Treatment plants including Operation & Maintenance.
5 MLD Effluent Treatment Plant for Paradeep Phosphates Ltd., Paradeep in Orissa.
Piling works for RCC (driven), Stone and Sand piles at Paradeep Phosphates Ltd.
10 MLD Water Reclamation Plant for Bangalore Water Supply and Sewerage Board-Bangalore.
1 MLD Sewage Treatment Plant for Hindustan Aeronautics Ltd-Bangalore.
1 MLD Water Recycling Plant for Southern Railway- Bangalore.
2 nos of 0.50 MLD Sewage Treatment Plants for NTPC, Kayamkulam -Kerala.
0.50 MLD Effluent Treatment Plant for Hindustan Aeronautics Ltd- Bangalore.
2 nos of 3 MLD Sewage Treatment Plants for Thirumala Thirupati Devasthanams-THIRUPATHI
5 MLD Water Treatment Plant for Kerala Water Authority-IDUKKI
Trouble shooting in Erection and Commissioning of 1 MLD STP for WCL, Umrer, Nagpur
Execution of Revival and Treatment of OOTY LAKE using Bio Remediation Technology.
IIProviding Under Ground Drainage and Water Supply facilities for Bangalore Water Supply and Sewerage Board under package-III:: Work spread in 9 Wards in Bangalore City -Value of Work:: Rs.53Cr, Containing
Under Ground Drainage System with Stoneware and RCC Pipes- 330Kms long including Construction of 10,000nos of Manhole Chambers.
Water Supply Distribution network and Transmission lines with Ductile Iron Pipes of sizes ranging from 100 to 900mm for a length of 450Kms including Construction of 1000nos of Valve Chambers.
Micro Tunneling / HDD / Trenchless / Pipe Jacking for Crossing of High Ways and Railways / Canals for a length of 750mts
Liaison with Ward Councilors, Political Leaders, Principal Contractor (EPI), Client-BWSSB officials, Consultants-2nos, Police for Road Cutting permissions & Local Statutory Authorities.
Managing a labour force of 1500 and supporting staff of 45 nos.
A. P. S. Irrigation Development Corp. Ltd.(Govt. of A. P. Undertaking)::Asst.Exe.Engineer
Design, Estimation, Execution & Maintenance of Water supply & Lift Irrigation Projects containing Intake Structures, Pumping Stations, Sump well, Jack well Cum Pump House & Delivery Cisterns including Distribution system on turnkey basis.
Execution of Cross-country pipe lines with R.C.C / P.S.C/M.S/C.I. Pipes.
Erection and Commissioning of Pumps, Motors and their starters up to 350 HP.
Preparation of Project Reports, Tender Schedules, Floating of Tenders, Evaluation of Tenders, Collection of Quotations for Materials and Electro-Mechanical Works, Procurement of Materials, Preparation of Comparative Statements, Releasing of Purchase / Work Orders, Concluding Agreements, Scrutiny of Estimates.
MIS reports, Contractor Bills verification and Passing.
Execution of Project: Budgeting and approaching Banks for Financial assistance. Preparation of schedules as per Bankers requirement and getting their approval. Getting release of Loans and planning their re payment.
Operation & Maintenance: Preparation of Annual Maintenance Plan, submitting to Bankers for Financial assistance with repayment plan of action. Setting up of customer care centers for Preparation of customer bills based on water consumption, serving the bills to customers, revenue collection as well as for attending problems.
SUBHASH PROJECTS AND MARKETING Ltd.::Manager-Construction
1.Execution of Water supply Project for Channapatna-Ramnagar Towns for Karnataka Urban Water Supply & Drainage Board (aided by Asian Development Bank) under PMC of LOUIS & BERGER Inc. and DS Consultancy of STUP Consultants Ltd. consisting the following.
2Nos of RCC GLSRs of 15 Lakh Liters Capacity
2Nos of Clear Water Pump Houses and foundations for Pumps and Motors
RCC Over Head Tanks – 2nos of 5 Lakh Liters, 2nos of 10 Lakh Liters and 1 no of 15lakh liter Capacity with 15mts staging.
Erection and Commissioning of Pumps and Motors ranging from 25 HP to 125 HP.
10nos Staff Quarters for the Operation and Maintenance staff
Barbed wire fencing for the pumping stations.
2.Execution of Lift Irrigation Project at Nanjapura for Irrigation Dept. (Govt. of Karnataka), Containing the following
Intake structure, leading Channel, Sump well and Pumping Station
P.S.C. Pipe line of 1500mm dia to a length of 8.5Kms (2 Rows)
Supply & Erection of Pumps and Motors of 1300 H.P, Vertical Turbine Pumps.
L&T-ECC GROUP::Supervisor
Supervision of Staff Quarters and Administration Building works for ANDHRA CEMENTS Ltd., for Cement Factory at Dachepalli (PO) Guntur Dist. in A.P
Personnel strengths
Weakness
Go getter, self-starter, Decision making & Trouble shooting
Wants to work in Major Towns of INDIA & Other Countries.
Accustom to circumstances, Sincere at duties and punctual
Completion of projects on schedule and economically
Shrewd at Quality and Quantity of work
Professional Membership
Associated Member of Institution of Engineers (I).
Other Information
Holder of NCC ‘C’ Certificate with Senior Under Officer Rank-CSUO
Achievement
Pratibha Industries Ltd has selected me as a Key Contributing member of the Pratibha Management and Covered under the Company’s Performance Pay Scheme
Reference
MrNarayana, Chief Engineer-K, Bangalore Water Supply & Sewerage Board, Bangalore.
Mr Mukund Reddy, Chief General Manager-Highways, JACOBS-CES, Bellary. Mobile No.944-***-****
G.RadhaKrishna Murthy.