Post Job Free

Resume

Sign in

Aramco Heavy Equipment

Location:
Karachi, Sindh, Pakistan
Salary:
00000
Posted:
November 28, 2022

Contact this candidate

Resume:

R E S U M E

Shaikh Khursheed Ahmed

Flat # ***, Aero duplex city, Plot # D-9, Block-F, North Nazimabad, Karachi-74700, Pakistan.

Cell #: 0092 304-***-****, & 033********

E: mail adtqyo@r.postjobfree.com

E: mail adtqyo@r.postjobfree.com

NIC # - 42201-0403819-7

Experience:

12 years relevant experience in refineries, fertilizer, chemical or petrochemical industry &16 years other processes industries

Skills:

Maintenance and troubleshooting experience of rotary and stationary equipment’s, like turbo expander, gas turbines, reciprocating gas compressors, shell & tube, fin-cooler, centrifugal / rotary pumps, air compressor, vessels, boilers, columns, heat exchangers etc.

Well Strong technical knowledge of HVAC/plumbing equipment, accessories & installation method.

Conversant with industrial codes / standards related to heavy equipment erection & installations.

Conversant with CMMS / inventory modules.

Estimating, Coasting, Schedule and Work procedure with plan.

Static Equipment-related design standards (e.g. ASME, API, ASTM), specifications, codes, and appropriate safety criteria.

Good knowledge of safety procedures related to jobs and equipment’s in oilfield industry.

Follow Hydro-Testing procedure of piping and follow procedure of punch list clear.

Duties & Responsibilities:

Preventive & predictive maintenance of rotary & stationary machinery

Shut-down plan and workout routine maintenance.

Installation commissioning of related machinery and plants

Establishes and monitors programs for critical equipment analysis and condition monitoring techniques

Maintaining records, drawings, documentation and report writing of related equipment’s and plants HSE Compliance

Working Experience

Jan.2019 – Present Worked with Akbar Engineering as Site Engineer.

Aug.2015- Nov 2017 Al-Qaryan Steel. (Project Engineer).Dammam, Saudi Arabia

Cost Control with materials, equipment and manpower as per project budget.

Coordination with contractor quality of work and instruction to follow given Drawings and procedure, follow with safe and safety procedure.

Well knowledge & supervision of heavy equipment’s erection & installation related to steel plant

Arranged utility section and department as per drawings

May.2014-jul.2015 Al Sinsina Contracting Co. (Construction-Engineer). Jubail, Saudi Arabia

Prepare and requirement of construction team, equipment, tool and consumable as in order to avoid delays on the project schedule as plane.

Monitor the efficient use of company resources.

Prepare internal work schedule to be followed and monitor at site to meet project completion as early as possible.

Prepare progress report balance work to be done materials and some important that effect the project completion.

Effective & profitable undertaking & completion of all construction/installation.

HSE and comply with Company’s Health, Safety & Environment Management System requirements. Take reasonable care of own health and safety and that of others in the workplace. Follow and maintain Company standards of Quality in accordance with Company Quality System requirements.

Sep.2006-Mar.2014 Mohammad Al-Mojil Group. (Superintendent.) Dammam, Saudi Arabia

Supervision at site, requirements of equipment’s, tools and manpower as per job.

Attempted & conduct daily safety toolbox meeting with staff, client and workers.

Coordination with project control dept. & engineering dept. the relevant documents needed to do the job. Piping monitoring and preparing punch list.

Collect daily progress report, balance work to be done, coordination with project warehouse and store to be issuing materials as per site requirements.

Supervision and work implementation at site coordinating and clarification to the supervisor any discrepancies on the IFC/AFC drawing against project specifications.

Participated Shutdown & plant maintenance oil & gas projects, mostly Saudi ARAMCO & Sabic projects.

Maintenance and troubleshooting of rotary and stationary equipment’s, like turbo expander, gas turbines, reciprocating gas compressors, centrifugal / rotary pumps, air compressor, chillers, vessels, reactors, columns, heat exchangers etc.

Knowledge of industrial codes / standards related to mechanical installations.

Certify (Aramco) permit receivers of oil and gas industries and projects.

Done & participated oil & gas projects mostly Saudi ARAMCO & Sabic projects i.e.

Juay’mah LNG gas plant Project-(Tr) [Aramco]

Petro Rabigh Petroleum TIG & PO-(Mesar)[Aramco]

Core hydrocarbon facilities manifa-(Siapem)[Aramco]

King Abdullah petroleum studies and research center-[Aramco]

Yanbu Aramco Sinopec Refinery SP6 project-[Aramco]

SCP-Chevron Philips shutdown & Expansion Project (Shutdown)

Saudi-Kayan, PP&PH project [Sabic]

Tasnee expansion & Shutdown Project.(Fluor)

Jesco Denieli Seamless pipe Mill

FW-Sharq Project-(Foster-Wheeler) [Sabic](Shutdown)

Ma’aden Aluminum smelter Gas treatment center 1&2.[Bechtel/Alcoa

Dec.2001-jul.2006 Dynea Pakistan Ltd. (Dy. Maintenance Engineer) Hub, Baluchistan

It is petro-chemical plant produce UFC, MCP Powder, Glazing and glue product.

Duties and responsibilities Routine & general maintenance, Preventive & predictive maintenance of rotary & stationary machinery

Installation commissioning of related machinery and plants

Establishes and monitors programs for critical equipment analysis and condition monitoring techniques

Maintaining records, documentation and report writing of related equipment’s and plants

HSE Compliance and follow rule and regulation

Mar.1995-Dec.2001 Industrial Promotion Serv.Ltd. (Asst. Production Manager).Karachi, Pak.

IPS arranged large setup of Aluminum Extrusion plant in Pakistan from hoogoven aluminum co. Stuttgart, Germany. My responsibilities to dismantling Aluminum plant, shipment for Pakistan.

As good performance and supervision, IPS nominated and sending UK. To arranged anodizing plant from Kawneer Aluminum Co. near Cheshire, UK to dismantling and shipment to Pakistan.

Developed and repair of existing on tools & equipment related Aluminum extrusion

Follow the quality assurance policies and procedures to effective production efficiency

Mar.1992-Dec.1994 Riyadh Cables and Metal Ind. (Maint. Engineer) Riyadh, Saudi Arabia

Erection and Installation Plan and Set up Plant Expansion Manufacturing Developments and Modification for maximize production like DT-3000 Drum twister, wire drawings, stranding and CCV line to produce HT.HV. Cables.

Maintain Auxiliaries as such Compressors, generators, Exchangers, chillers, pneumatic and Hydraulic Units etc...

Dec.1982-Dec.1991 Pakistan Cables Ltd (Prod. & Maint. Officer) Karachi, Pakistan

Major Responsibilities to existing plant maintenance Scheduling, Prev.-maintenance.

Maintained Aluminum Extrusion plant (2000 ton oil hydraulic) EC. Grade rod & profile, Comp., Generator, Heat-Exchanger, Chillers, Air-Handling Unit, Pumps, Furnace. Etc.

Education

April 1979-may.1982 Jinnah Govt. Polytechnic institute, Karachi

Diploma in mechanical Engineering, (DAE) - first Div.

June1976-June.1978 YMCA Technical Institute, Karachi

Vocational Advanced Course (2 Years) Refrigeration/Air-Conditioner. 2nd Div.

1979 Karachi Board of Secondary Education, Karachi

Matriculation – 1st div.

Other Certificates

1989 BICC United Kingdom Pakistan cables Ltd

T/Operator, Communication

2001 SGS Pakistan Limited SGS Pakistan Ltd Piping Fabrication and Installation

2003 FAG, Ball Bearing Hyder Ali & Co

Technical Seminar

2003 Pakistan Institute of Quality Control Dynea Pakistan Ltd

ISO 9001-2000 Quality Management System

2005 Comp-Air Rastgar & Company Ltd

(Modern “Speed Regulated Technology”)

2006 Safety Professional, OSHA, General Industry

2011 (Hot Work, Cold Work, Confined Space & Released) Saudi ARAMCO

Work Permit receiver.

I T Skills

oWindow and Office Tool Advance



Contact this candidate