ODUSI ODUBODE OSOYEMI.
*** ****** ***** ********, **********, Ottawa. ON K1t 4H1.
Email: adtpl0@r.postjobfree.com. 1-343-***-****, 1-613-***-**** PROFILE
Planned all resources including material (used for seismic data acquisition) and human resources to achieved clients’ goals and objectives.
Identify risk that may affect set out objectives and be dynamic with same during seismic data acquisition operations whilst mitigating against them. Communicate project technical requirements with timelines to staffs for job execution and results to management and client.
Resolve conflicts amongst stakeholders as it arises. Collaboration with local communities to achieve project objectives at minimal cost to the company.
Coordination of internal resources to achieve project objectives, such as ensuring good integrity of equipment to be used and maintenance of these equipment with documentation. Development of job description and work procedures for the project. Implement performance assessment of workers each time before they go on time off to confirm they have achieved set out targets and new targets given: This is to ensure that project timelines are achieved within technical requirements (quality data acquisition). Reduce down times as much as possible throughout project execution. Ultimately, ensure that company and client HSE standards are constantly being followed at all times.
• Successfully mobilized 600 labor force in one of the most environmentally and politically difficult areas in the world whilst keeping within time and budget constraints.
• Created and implemented an operating procedure, which saved the company huge amount in expected equipment theft.
• Introduced a training scheme, which maximized capability of employees this led to additional flexibility when organizational changes were required.
• Introduced an incentive scheme and organized supervision that led to an improvement in production rate.
• Increased production efficiency through the development of an equipment carrier and introduced an improvement in the distribution procedure.
• Identified safety shortfalls within staff, facilitated re-training program. This led to decrease in incidents and increase in unsafe act reporting.
• Improved production by identifying bottlenecks and using modern tools & techniques to create solutions and implement change.
• Carried out an observation on the first 4D seismic survey, (IMO River) in Nigeria for SHELL.
Page 2 of 5
Experience
APRIL 2019 – OCTOBER 2020
United Geophysical Limited
My Roles and Responsibilities
Recording Manager
• Supervised all seismic acquisition operations of the crews been undertaking by the company making use of UNITE systems and SN428 recording instruments.
• Managed all seismic acquisition operations of the crews been operated by the company with Chevron Nigeria Limited (CNL), National Agip Oil Company (NAOC), National Petroleum Development Company (NPDC)Pan Ocean, and Shell
Petroleum Development company (SPDC) in Nigeria using Sn428, Sn408, Sn388 and Sn368 recording instruments.
• Generated and analyzed records on project management system
(PMS), performance improvement plan (PIP), technical operating standards (TOS) and performance appraisal targets
(PAT) for the company’s operations.
• Performed various forecasts, and achieved targets, including safety standards on all seismic acquisition operations of all crews been operated by the company.
JULY 2017 – MARCH 2019
Alpha Geo Limited
My Roles and Responsibilities
Project Manager
• Mobilized and concluded seismic survey of 2D projects in Gujurat_2B, Manhastra_8B and 3D Mehsana for Oil and Natural Gas Company (ONGC), which is the national oil and Gas Company of India.
• Managed by planning, organizing, executing, monitoring, and controlling seismic acquisition projects in order to meet or exceed defined customer expectations; provide operational, HSE and quality methodology to ensure project objectives are met within defined timelines.
• Mobilized and collaborated with seismic crews and reported on progress to management Page 3 of 5
FEBRUARY 2016 TO JUNE 2017
Geokinetics Inc.
My Roles and Responsibilities
Recording Crew Manager
• Acquired seismic and process data for the client on Land, Transition and OBC zones.
• Managed the data merging with a professional team data for client British Petroleum (BP) in Azerbaijan
• Performed other seismic related duties as required by the client. APRIL 2015-JANUARY 2016
My Roles and Responsibilities
Recording Crew Manager
• Engaged in scouting of the GNPC” Voltaian” Basin in Ghana: Attended pre and post scouting meetings during this period.
• Submitted daily and final scouting reports for the project.
• Compiled the new country checklists for the country of Ghana, West Africa. FEBRUARY 2010 TO APRIL 2015
My Roles and Responsibilities
Project Manager/Recording Crew Manager
• Carried out gathering of pre bid information which was used in the final submission for Chevron, Nigeria
• Engaged in the scouting of Somoil 3D and Kwanza 3D projects both in Angola; consequently, participated in the submission of bids for the projects.
• Mobilized and concluded seismic survey of 2D-Kwanza Sul and 3D-Cabinda projects for Sonangol and Plus Petrol oil organizations in Angola.
• Managed by planning, organizing, executing, monitoring and controlling seismic acquisition projects in order to meet or exceed defined customer expectations; provide Operational, HSE and Quality leadership; meet financial goals; effectively communicate requirements to the seismic crew; and report progress to management.
• Mobilized a seismic crew in Soyo and Kwanza both in Angola. JULY 2008 TO JUNE 2010
My Roles and Responsibilities
Senior Observer/Recording Manager
Page 4 of 5
• Mobilized and completed OBC recording operations in Cameroun for Euroil in the Etinde prospect area.
• Mobilized and completed Land and Transition zone recording operations of the crews operated by the company for Artumas Group in Tanzania and Mozambique (Africa) using the ARAM Aries recording instruments.
JULY 1992 – JUNE 2008
United Geophysical Limited
My Roles and Responsibilities
Engineer Observer
Successfully managed maintenance teams, line personnel supervision, developing maintenance schedules, controlling and ordering resources required to maintain seismic acquisition equipment.
• Introduced new and refined existing maintenance procedures, which reduced equipment failure rates and increased monthly revenue.
• Designed and installed a data management system, which was capable of handling all current and expected requirements for the next 3 years.
• Trained and organized technicians in the maintenance of Sercel 368 line equipment, OYO marsh geophones and Sensor marsh geophones.
Skills
• Proven leadership
• Team player
• Reliable engineer, with some time in a processing environment
• A detailed understanding of Condition Monitoring techniques, Reliability Centered Maintenance, Failure Modes/Effects Analysis, and Root Cause Analysis. Non-Destructive testing methods experience is an asset
Education
Obafemi Awolowo University, Ile-Ife, Nigeria
B.Sc. Electrical & Electronics Engineering
• Eligible for registration with the Association of Professional Engineers and Geoscientists of British Columbia
Ogun State Polytechnic, Abeokuta, Nigeria
• OND Electrical & Electronics Engineering
Page 5 of 5
Corporate Trainings
2000: SHELL, HEALTH & SAFETY MANAGEMENT, NIGERIA.
2001: SERCEL SN388 ACQUISITION EQUIPMENT, NANTES, FRANCE. 2008: HSE/MS GEOKINETICS.
2008: ARAM ARIES ACQUISITION EQUIPMENT, HOUSTON, USA. 2008: BOSIET TRAINING, CAMEROUN.
2009: SERCEL SEARAY SYSTEM, NANTES, FRANCE.
2012: BOSIET TRAINING, NIGERIA.
2014: PMI PMP TRAINING.
References
Upon request