Post Job Free
Sign in

Power Plant Manager Maintenance

Location:
Dhaka, Bangladesh
Salary:
400000 BDT per Month
Posted:
November 22, 2022

Contact this candidate

Resume:

MD. Rezaul Kabir

B.Eng. EEE

Mymensingh, Bangladesh

Mobile: 017**-******

Email: ********@*****.***

1.Qualification:

B.Eng EEE (Electronics and Electrical Engineering)

University of Abertay Dundee Scotland, United Kingdom.

2.Computer Literacy:

Conversant with all Microsoft operating systems & Microsoft office applications

Utilized software such as AutoCAD, Math lab, Ps Spice, Programming: Basic, Pascal & 8086 IBM Assemble Language.

3.Professional Foreign Training:

Organized By: General Electric (United States of America)

Duration: 3 weeks (2019)

Subject: Operation Maintenance Speed Tronic Mark 6 Control System

Organized By: SIEMENS AG (The Netherlands & Germany)

Duration: 5 weeks (2005)

Subject: O&M Training of 210 MW Combined Cycle Power Plant

PCS 7 Control System

Organized By: General Electric Energy Product Europe _ France (GEEPF)

Duration: 2 weeks (2000)

Subject: Operation & Maintenance Frame 6 Gas Turbines

MKV Speedtronic Control System

Factory Equipment Inspection & LTSA Technical negotiation meetings (Transfer technology know how)

Germany: (Sipos and Siemens Steam turbine Materials) several times

Netherland: ATH (Long Term Service Agreements) several times

Hungary: GE Gas turbine Equipments)

India: (Moog Valves)

4.Profile:

24 years experience as an electrical engineer and presently working government own Rural Power Company Limited. http://www.rpcl.gov.bd/

obtained sufficient knowledge specially power plant operation and maintenance working 22 years in power generation company through hardworking foreign training and dedication to the service.

Generation, Power Transmission, Gas Processing projects,Water Treatment, Paper mill s ector including 2 years of working record with GE Energy Product Europe (EPC Contractor of 140 MW Gas Turbine Power Plant).Capable of maintenance electrical equipments of combined cycle power plant.

Sufficient understanding of following control system includes GE Speedtronic Mark V (Gas Turbine Control System from General Electric), Microrec DCS Supervision System (Distributed control System from ALSTOM for Gas Turbine & Balance of plant Supervision, Operation & control and Siemens PCS7 Technology Automation system (Steam Generator, Steam turbine, Gas turbine and Balance of Plant Operation and control system).

Operation and maintenance capability of machineries such Frame 6 Rev. B 4 MW GE Gas turbines, T190-240 GEC Alstom 35.57MW Generator. Hyundai 50MVA Transformer, NK90/3.2 AX 70 MW Siemens Steam Turbine, TRLI 100/36 Siemens Generator, Siemens 100 MVA Transformer, Standard Fasel Netherlands Heat Recovery, Steam generator, Air-cooled Condenser from BalckwDour Germany, Water treatment Unit from Chirist, Netherlands, Compressed air system, Continuous emission monitoring system, MIS, Gas chromatographer.

5.Present Employment and Responsibilities :

Project Director

(Rural Power Company Limited )

Appointed By Power Division, Ministry of Power, Energy and Mineral Resources)

Construction of Mymensingh 360 MW Dual Fuel CCPP

EPC contractor # Harbin Electric International

ECA Finance Project

Bank: Mitsui Sumitomo Banking Corporation

6.Previous Employment and Responsibilities :

Superintend Engineer (Power Plant Operation)

Operation in charge Mymensingh 210 MW combined cycle power plant

20 th Dec 2015 - 31/11/2019

Manager Maintenance/ Executive Engineer Electrical, I&C Maintenance

6th January 2010 – 20 th Dec 2015

Rural Power Company Limited (210 MW Combined Cycle Power Plant)

Head of E,IC Department.

Past Employment and Responsibilities :

Deputy Manager Maintenance I&C (4th August 2005 – 5th January, 2010)

Rural Power Company Limited (210 MW Combined Cycle Power Plant)

Maintenance Engineer (I&C) (1st November 2001 – 3rd August 2005)

Lahmeyer International Pally Power Services

(O&M Contractor of 140 MW Gas Turbine Power Plants)

Electrical/Commissioning Engineer (16th July 1999 30th October 2001)

GE Energy Product Europe

(EPC Contractor of 140 MW Gas Turbine Power Plant)

Commissioning assistant of Frame 6 GE Gas Turbines

Supervising instrument cable connection

Loop checking of the instruments

Energizing electrical panels

MKV software installation & testing

Startup Gas turbine

Record data during test run & reliability run

Operation of GT during warranty period

Electrical Engineer, (15th August 1997 July 1999)

TK Paper Mill, Kalurghat, Chittagong Bangladesh.

Electrical Equipments Maintenance

Supervising motor rewinding & repair

Electrical trouble shooting

Personal details:

Date of Birth: 01-01-1973

Father’s Name: Md. Nurul Islam

Mother’s Name: Rawshanara Islam

Spouse Name: Shabnam Jahan

Passport no: BW 0266510

Present Address: Apartment#C6, House#63, Road#13, Sector#14, Uttara Model Town, Dhaka.

Permanent Present address: 15/C KristopurSadar, Katwali, Mymensingh.

Birth place: Tangail

Other Information

Good communication skill in English

Hold a valid driving license

Adoption quality with multinational environment, culture & ethnic

Stayed in UK for study (5 years) and also Visited Europe several times, USA, Singapore, Emirate, Qatar, Saudi Arabia India, Malaysia etc.

References

Academic Professional

Ian Longair Mr. AHM Rashed

Senior Lecturer Plant Incharge

University of Abertay Dundee Rural Power Company Limited

Scotland, UK +44 (0-138*-****** Bangladesh 017*******

MD Rezaul Kabir

List of Training in Bangladesh

1 Right to Information Act

(2nd Batch) Rural Power Company Limited (RPCL) Bangladesh 22-12-2021 22-12-2021

2 Grievance Redress

System (GRS) Rural Power Company Limited (RPCL) Bangladesh 22-12-2021 22-12-2021

3 ibas++ Public Institute of Finance (PIF), MoF Bangladesh 05-12-2021 05-12-2021

4 National Integrity

Strategy RPCL Bangladesh 29-09-2021 29-09-2021

5 Procurement Training (Public Procurement Management) National Academy for Planning & Development Bangladesh 19-09-2021 08-12-2021

6 Workshop on "Global Trends in Decarbonizing Power Sector: Implications for Bangladesh" BCG, Powercell Bangladesh 13-09-2021 13-09-2021

7 Grievance Redress System & GRS Software RPCL Bangladesh 08-09-2021 08-09-2021

8 Webinar on "Dissemination of Best Practices & Innovations of RPCL" BPMI & RPCL Bangladesh 19-06-2021 19-06-2021

9 Innovation (Seminar on Service Simplification & Innovation

Showcasing) RPCL Bangladesh 05-06-2021 05-06-2021

10 Risk Management for

Development Projects National Academy for Planning & Development (NAPD) Bangladesh 18-05-2021 20-05-2021

11 Energy Efficiency Improvements in Power Generation and Distribution Sectors of SAARC Countries SAARC Energy

Centre Bangladesh 15-02-2021 15-02-2021

12 Annual Performance Agreement (APA)-4th Batch RPCL & Ministry of Power Bangladesh 17-01-2021 17-01-2021

13 Workshop on Greenhouse Gas Inventory and MRV System FAOB, UN Bangladesh 09-09-2020 09-09-2020

14 National Integrity Strategies & Annual Performance Agreement (APA)-2nd Batch Training Cell, RPCL Bangladesh 23-08-2020 23-08-2020

15 Technology Option for Load Swing in the Bangladesh Power Sector Bangladesh Power Management Institute (BPMI) Bangladesh 14-03-2020 16-03-2020

16 VAT Law-2012 RPCL Training

Cell Bangladesh 14-01-2020 14-01-2020

17 User Training on ADP/RADP Management System SDBM Bangladesh 13-01-2020 13-01-2020

18 Platforms for Dialogue

(P4D) National Institute of Local Government (NILG) Bangladesh 01-01-2020 02-01-2020

19 Annual Performance

Agreement (APA) RPCL., Dhaka. Bangladesh 29-10-2019 29-10-2019

20 Management Skills for Project Executives (19th Batch) National Academy for Plannig & Development Bangladesh 20-10-2019 24-10-2019

21 Flow Metering Solutions for custody Transfer Application Private Institution Bangladesh 02-10-2019 02-10-2019

22 Factory Quality

Inspection (FQI) BHEL-GE Gas Turbine Services Pvt. Ltd, India Netherlands 03-07-2019 11-07-2019

23 Developing Public Speaking & Presentation Skills. Bangladesh Power management Institute Bangladesh 12-03-2019 13-03-2019

24 WorkShop On Project

Management MoPEMR Bangladesh 30-01-2019 30-01-2019

25 Project Management

Focusing on

Scheduling & Milestone of Project Progression CBISP Bangladesh 28-11-2018 29-11-2018

26 Current Generation

Planning Process CBISP Bangladesh 31-05-2018 31-05-2018

27 Project Management RPCL Bangladesh 12-05-2018 12-05-2018

28 Role of CCGT in

Bangladesh Capacity Building

& Implementation Support for Power Sector Bangladesh 12-12-2017 14-12-2017

29 Concept of Package Proposal on LNG Supply and Power Generation in Bangladesh (Workshop) Power Division Bangladesh 31-10-2017 31-10-2017

30 Advanced Project

Management Capacity Building

& Implementation Support for Power sector Agencies (CBISP) Bangladesh 14-10-2017 16-10-2017

31 Composition of Budget Implementation Planning & It's Implementation Progress Monitoring (Workshop) CBISP Bangladesh 23-08-2017 23-08-2017

32 E-filing / Nothi Training Cell, RPCL. Bangladesh 29-07-2017 29-07-2017

33 SEMINAR on Lubricants for Lubrication Luke Oil Bd limited. Bangladesh 25-07-2017 25-07-2017

34 Basic Course on

Project Management in the Power Sector Capacity Building

& Implementation Support for Power Sector Agencies (CBISP) Bangladesh 16-05-2017 18-05-2017

35 Operation And Maintenance Of Gas Turbine Bangladesh Power Development Board. Bangladesh 07-09-2013 14-09-2013

MD Rezaul Kabir



Contact this candidate