MD. Rezaul Kabir
B.Eng. EEE
Mymensingh, Bangladesh
Mobile: 017**-******
Email: ********@*****.***
1.Qualification:
B.Eng EEE (Electronics and Electrical Engineering)
University of Abertay Dundee Scotland, United Kingdom.
2.Computer Literacy:
Conversant with all Microsoft operating systems & Microsoft office applications
Utilized software such as AutoCAD, Math lab, Ps Spice, Programming: Basic, Pascal & 8086 IBM Assemble Language.
3.Professional Foreign Training:
Organized By: General Electric (United States of America)
Duration: 3 weeks (2019)
Subject: Operation Maintenance Speed Tronic Mark 6 Control System
Organized By: SIEMENS AG (The Netherlands & Germany)
Duration: 5 weeks (2005)
Subject: O&M Training of 210 MW Combined Cycle Power Plant
PCS 7 Control System
Organized By: General Electric Energy Product Europe _ France (GEEPF)
Duration: 2 weeks (2000)
Subject: Operation & Maintenance Frame 6 Gas Turbines
MKV Speedtronic Control System
Factory Equipment Inspection & LTSA Technical negotiation meetings (Transfer technology know how)
Germany: (Sipos and Siemens Steam turbine Materials) several times
Netherland: ATH (Long Term Service Agreements) several times
Hungary: GE Gas turbine Equipments)
India: (Moog Valves)
4.Profile:
24 years experience as an electrical engineer and presently working government own Rural Power Company Limited. http://www.rpcl.gov.bd/
obtained sufficient knowledge specially power plant operation and maintenance working 22 years in power generation company through hardworking foreign training and dedication to the service.
Generation, Power Transmission, Gas Processing projects,Water Treatment, Paper mill s ector including 2 years of working record with GE Energy Product Europe (EPC Contractor of 140 MW Gas Turbine Power Plant).Capable of maintenance electrical equipments of combined cycle power plant.
Sufficient understanding of following control system includes GE Speedtronic Mark V (Gas Turbine Control System from General Electric), Microrec DCS Supervision System (Distributed control System from ALSTOM for Gas Turbine & Balance of plant Supervision, Operation & control and Siemens PCS7 Technology Automation system (Steam Generator, Steam turbine, Gas turbine and Balance of Plant Operation and control system).
Operation and maintenance capability of machineries such Frame 6 Rev. B 4 MW GE Gas turbines, T190-240 GEC Alstom 35.57MW Generator. Hyundai 50MVA Transformer, NK90/3.2 AX 70 MW Siemens Steam Turbine, TRLI 100/36 Siemens Generator, Siemens 100 MVA Transformer, Standard Fasel Netherlands Heat Recovery, Steam generator, Air-cooled Condenser from BalckwDour Germany, Water treatment Unit from Chirist, Netherlands, Compressed air system, Continuous emission monitoring system, MIS, Gas chromatographer.
5.Present Employment and Responsibilities :
Project Director
(Rural Power Company Limited )
Appointed By Power Division, Ministry of Power, Energy and Mineral Resources)
Construction of Mymensingh 360 MW Dual Fuel CCPP
EPC contractor # Harbin Electric International
ECA Finance Project
Bank: Mitsui Sumitomo Banking Corporation
6.Previous Employment and Responsibilities :
Superintend Engineer (Power Plant Operation)
Operation in charge Mymensingh 210 MW combined cycle power plant
20 th Dec 2015 - 31/11/2019
Manager Maintenance/ Executive Engineer Electrical, I&C Maintenance
6th January 2010 – 20 th Dec 2015
Rural Power Company Limited (210 MW Combined Cycle Power Plant)
Head of E,IC Department.
Past Employment and Responsibilities :
Deputy Manager Maintenance I&C (4th August 2005 – 5th January, 2010)
Rural Power Company Limited (210 MW Combined Cycle Power Plant)
Maintenance Engineer (I&C) (1st November 2001 – 3rd August 2005)
Lahmeyer International Pally Power Services
(O&M Contractor of 140 MW Gas Turbine Power Plants)
Electrical/Commissioning Engineer (16th July 1999 30th October 2001)
GE Energy Product Europe
(EPC Contractor of 140 MW Gas Turbine Power Plant)
Commissioning assistant of Frame 6 GE Gas Turbines
Supervising instrument cable connection
Loop checking of the instruments
Energizing electrical panels
MKV software installation & testing
Startup Gas turbine
Record data during test run & reliability run
Operation of GT during warranty period
Electrical Engineer, (15th August 1997 July 1999)
TK Paper Mill, Kalurghat, Chittagong Bangladesh.
Electrical Equipments Maintenance
Supervising motor rewinding & repair
Electrical trouble shooting
Personal details:
Date of Birth: 01-01-1973
Father’s Name: Md. Nurul Islam
Mother’s Name: Rawshanara Islam
Spouse Name: Shabnam Jahan
Passport no: BW 0266510
Present Address: Apartment#C6, House#63, Road#13, Sector#14, Uttara Model Town, Dhaka.
Permanent Present address: 15/C KristopurSadar, Katwali, Mymensingh.
Birth place: Tangail
Other Information
Good communication skill in English
Hold a valid driving license
Adoption quality with multinational environment, culture & ethnic
Stayed in UK for study (5 years) and also Visited Europe several times, USA, Singapore, Emirate, Qatar, Saudi Arabia India, Malaysia etc.
References
Academic Professional
Ian Longair Mr. AHM Rashed
Senior Lecturer Plant Incharge
University of Abertay Dundee Rural Power Company Limited
Scotland, UK +44 (0-138*-****** Bangladesh 017*******
MD Rezaul Kabir
List of Training in Bangladesh
1 Right to Information Act
(2nd Batch) Rural Power Company Limited (RPCL) Bangladesh 22-12-2021 22-12-2021
2 Grievance Redress
System (GRS) Rural Power Company Limited (RPCL) Bangladesh 22-12-2021 22-12-2021
3 ibas++ Public Institute of Finance (PIF), MoF Bangladesh 05-12-2021 05-12-2021
4 National Integrity
Strategy RPCL Bangladesh 29-09-2021 29-09-2021
5 Procurement Training (Public Procurement Management) National Academy for Planning & Development Bangladesh 19-09-2021 08-12-2021
6 Workshop on "Global Trends in Decarbonizing Power Sector: Implications for Bangladesh" BCG, Powercell Bangladesh 13-09-2021 13-09-2021
7 Grievance Redress System & GRS Software RPCL Bangladesh 08-09-2021 08-09-2021
8 Webinar on "Dissemination of Best Practices & Innovations of RPCL" BPMI & RPCL Bangladesh 19-06-2021 19-06-2021
9 Innovation (Seminar on Service Simplification & Innovation
Showcasing) RPCL Bangladesh 05-06-2021 05-06-2021
10 Risk Management for
Development Projects National Academy for Planning & Development (NAPD) Bangladesh 18-05-2021 20-05-2021
11 Energy Efficiency Improvements in Power Generation and Distribution Sectors of SAARC Countries SAARC Energy
Centre Bangladesh 15-02-2021 15-02-2021
12 Annual Performance Agreement (APA)-4th Batch RPCL & Ministry of Power Bangladesh 17-01-2021 17-01-2021
13 Workshop on Greenhouse Gas Inventory and MRV System FAOB, UN Bangladesh 09-09-2020 09-09-2020
14 National Integrity Strategies & Annual Performance Agreement (APA)-2nd Batch Training Cell, RPCL Bangladesh 23-08-2020 23-08-2020
15 Technology Option for Load Swing in the Bangladesh Power Sector Bangladesh Power Management Institute (BPMI) Bangladesh 14-03-2020 16-03-2020
16 VAT Law-2012 RPCL Training
Cell Bangladesh 14-01-2020 14-01-2020
17 User Training on ADP/RADP Management System SDBM Bangladesh 13-01-2020 13-01-2020
18 Platforms for Dialogue
(P4D) National Institute of Local Government (NILG) Bangladesh 01-01-2020 02-01-2020
19 Annual Performance
Agreement (APA) RPCL., Dhaka. Bangladesh 29-10-2019 29-10-2019
20 Management Skills for Project Executives (19th Batch) National Academy for Plannig & Development Bangladesh 20-10-2019 24-10-2019
21 Flow Metering Solutions for custody Transfer Application Private Institution Bangladesh 02-10-2019 02-10-2019
22 Factory Quality
Inspection (FQI) BHEL-GE Gas Turbine Services Pvt. Ltd, India Netherlands 03-07-2019 11-07-2019
23 Developing Public Speaking & Presentation Skills. Bangladesh Power management Institute Bangladesh 12-03-2019 13-03-2019
24 WorkShop On Project
Management MoPEMR Bangladesh 30-01-2019 30-01-2019
25 Project Management
Focusing on
Scheduling & Milestone of Project Progression CBISP Bangladesh 28-11-2018 29-11-2018
26 Current Generation
Planning Process CBISP Bangladesh 31-05-2018 31-05-2018
27 Project Management RPCL Bangladesh 12-05-2018 12-05-2018
28 Role of CCGT in
Bangladesh Capacity Building
& Implementation Support for Power Sector Bangladesh 12-12-2017 14-12-2017
29 Concept of Package Proposal on LNG Supply and Power Generation in Bangladesh (Workshop) Power Division Bangladesh 31-10-2017 31-10-2017
30 Advanced Project
Management Capacity Building
& Implementation Support for Power sector Agencies (CBISP) Bangladesh 14-10-2017 16-10-2017
31 Composition of Budget Implementation Planning & It's Implementation Progress Monitoring (Workshop) CBISP Bangladesh 23-08-2017 23-08-2017
32 E-filing / Nothi Training Cell, RPCL. Bangladesh 29-07-2017 29-07-2017
33 SEMINAR on Lubricants for Lubrication Luke Oil Bd limited. Bangladesh 25-07-2017 25-07-2017
34 Basic Course on
Project Management in the Power Sector Capacity Building
& Implementation Support for Power Sector Agencies (CBISP) Bangladesh 16-05-2017 18-05-2017
35 Operation And Maintenance Of Gas Turbine Bangladesh Power Development Board. Bangladesh 07-09-2013 14-09-2013
MD Rezaul Kabir