Post Job Free

Resume

Sign in

Industrial electrician.

Location:
Riyadh, Saudi Arabia
Posted:
November 18, 2022

Contact this candidate

Resume:

ELPIDIO H. PEREÑA

CAF ARABIA Company, Riyadh, Kingdom of Saudi Arabia

Cell No.: +966*********

Email add: adtljg@r.postjobfree.com

POSITION APPLIED FOR : ELECTRO MECHANICAL ROLLING STOCK TECHNICIAN

EDUCATIONAL

College Central Colleges of the Philippines

Aurora Blvd., Quezon City

Bachelor of Science in Electrical Engineering, 1991 – 1996 (5th year)

High School Capitol Institute

Quezon City, 1983-1987

Elementary L.B. Santos Memorial School

Baesa, Quezon City, 1983

WORKING EXPERIENCED

January 21, 2019 – present

CAF ARABIA COMPANY, Riyadh, Kingdom of Saudi Arabia

ELECTRO MECHANICAL ROLLING STOCK TECHNICIAN

- Electrical and Mechanical modification technician

- Corrective technician

- Electrical Corrective technician

- Mechanical Corrective technician

- Train preparation

November 07, 2017 – January 18, 2019

MTT-DOTr-MRT3, DOTC,Edsa, Quezon City, Philippines

ROLLING STOCK TECHNICIAN

- work in EMERGENCY REPAIR UNIT (E.R.U.) DEPARTMENT

-Perform the necessary intervention for whatever failure will occur on the mainline train.

-Determine the failure and do the best right approach to trouble shoot the failure of the defective train.

-Doing the repair of the train at the Depot, if the train cannot be repair at the mainline.

-Perform other related duties as maybe assigned.

-Worked in Metro Rail Transit III (MRTIII) as ROLLING STOCK TECHNICIAN, under the maintenance provider of BUSAN UNIVERSAL RAIL INCORPORATION, work in EMERGENCY REPAIR UNIT (E.R.U.) DEPARTMENT from May 02, 2017 to November 06, 2017

-Perform the necessary intervention for whatever failure will occur on the mainline train.

-Determine the failure and do the best right approach to trouble shoot the failure of the defective train.

-Doing the repair of the train at the Depot, if the train cannot be repair at the mainline.

-Perform other related duties as maybe assigned

December 1999 to June 30, 2012

Metro Rail Transit III (MRT III), DOTC Edsa, Quezon City, Philippines

TRAIN DRIVER

-To operate assigned revenue train as per table and strictly observing:

Wayside and on board signaling system.

Safety

Train operation

-Conduct train preparation in accordance with approved procedures.

-Report to control center all abnormalities observed on train and along the revenue line.

-Performs all applicable procedure during breakdown and when requires, prepares and conduct train hauling to approved procedure.

-Prepares written report on all abnormalities observed on train along the line, including the detailed action done.

-Complies with all orders, instruction and advice emanating from control center during revenue operation.

-Operates the work train in support of the track related installation activity.

-Operates the electric train during the construction and actual running of the railway.

-Perform the shunting work and secure the points.

-Performs other related duties as may be assigned.

February 3, 1997 to August 2, 1998

Meralco Industrial Services Corp. (MEISCOR)

ELECTRICAL CONTROL SYSTEM (FOREMAN)

-Electrical motor control system designer and modification of electrical motor control system.

-Check the proper instrument to be use in electrical control system panel.

-Check the correct amphesity of instrument such as (relays, sensors, magnetic contractors, and circuit breaker) and to check the correct sizes of wire to be used.

-Check the correct input voltage of the motor in the system.

-Traces the correct address during trouble shooting.

-Train my subordinate for proper execution of the work.

-Perform other related duties as may be assigned.

May 5, 1995 to January 30, 1997

Hayama Industrial Corporation

ELECTRICAL CONTROL SYSTEM (SUPERVISOR)

-Electrical motor control system designer and modification of electrical motor control system.

-Check the proper instrument to be used in electrical system panel.

-Designing and improvising the electrical control system.

-Trace the correct address during trouble shooting and alertness in failure during production period

May 27, 1988 to August 04, 1993

Hayama Industrial Corporation

INDUSTRIAL ELECTRICIAN

-Check the proper instrument to be use as electrical control system panel.

-Check the correct amphesity of instrument such as (relays, sensors, magnetic contactors and circuit breaker) and to check the correct sizes of wire to be used.

-heck the correct input voltage of the motor in the system.

-Traces the correct address during trouble shooting.

-Train my subordinate for proper execution of the work.

-Perform other related duties as may be assigned.

ORGANIZATION

Institute of Integral Electrical Engineer (IIEE)

1991 March – 1996

Member

TRAINING/SEMINARS ATTENDED

Basic Training Program for Drilling Personnel

Oil Drilling Training Center

May 02 - 15, 2007

Introduction To Basic Oil Well Drilling Technology Oil Drilling Training Center

May 02 – 07, 2007

Introduction To Hydrogen Sulfite(H2S) /

(SCBA)Self Contain Breathing Apparatus

Oil Drilling Training Center May 08, 2007

IADC(Internal Association Drilling Contructors)

Rig Pass Orientation and Basic Safety

Awareness (including Slinger and Bank

Man Safe Measures)

Oil Drilling Training Center

May 09 – 15, 2007

First Aid At Oil And Gas Drilling Rig

Oil Drilling Training Center

May 16, 2007

Orientation On The Prevention Of Marine

Pollution By Oil

Oil Drilling Training Center

May 2007

Pneumatic Industrial Controls

Meralco Foundation Institute

March 13 – 31, 2000

42 hours

Electrical Control Wiring Installer And Troubleshooter

Meralco Foundation Institute

June 13 – July 04, 2000

48 hours

Electro-Pneumatics

Meralco Foundation Institute

October 02 – 18, 2000

42 hours

Basic PLC

Meralco Foundation Institute

November 06 – 20, 2000

42 hours

AC & DC Control And Preventive Maintenance

CCP Studio Theater

February 05, 1993 to March 23, 1993

Nuclear Bataan Power Plant

Bataan Power Plant

February 1993

Basic First Aid

Philippine National Red Cross

November 09 – 12, 1999

32 hours

Basic Life Support Training (adult) CPR

Philippine National Red Cross

November 10, 1999

8 hours

Portable Radio Communication Operation

National Telecommunication Company

December 10, 1999

8 hours

CHARATER REFERENCES

ALEX DELAS ARMAS

Engineer, Busan Universal

MRT III, Edsa Quezon City

LARRY OLESCO

Technician, Saudi Arabia

MR. LEO CAPARAS

President, Hydroil Drilling Corporation

Mindanao Avenue, Talipapa Quezon City

PERSONAL DATA

Date of Birth : June 18, 1970

Height : 5’11”

Weight : 167lbs.

Civil Status : Married

Name of Spouse : Merlene N. Pereña

Nationality : Filipino

Religion : Catholic

Language Spoken : English, Tagalog

I HEREBY CERTIFY that the above information is true and correct to the best of my knowledge.

ELPIDIO H. PEREÑA



Contact this candidate