Post Job Free
Sign in

Mechanical Engeneer

Location:
Talara, Piura, 20811, Peru
Posted:
November 15, 2022

Contact this candidate

Resume:

PERSONAL INFORMATION

Last Name:

First Name:

Passport Nº:

Date and place of Birth

E-mail:

Current Address:

Contact:

Sirit Risco

Dennys Alberto

109260817

****/**/**. *********

**********@*****.*** / ***********@*******.***

Unidad Vecinal Petroperu Talara, Pariñas, Piura.

Peru: +51-997-***-*** / +51-935-***-***

What Sapp: +51-997-***-***

EDUCATION

Institute Period Degrre Obtained

Universidad Nacional Experimental

“Francisco de Miranda” (UNEFM)

2001 – 2007 Mechanical Engineer

CERTIFICATES

Instituto/ Company Period Certificate

RHINO. C.A 2019 Heat Treatment Technician Level II COMEIND 2019 Ultrasonic Examination. Level II

TECNIWESCA 2019 Magnetic Particles Examination. Level II TECNIWESCA 2019 Liquid Penetrant Examination. Level II COOPERATIVA CUJICANA R.L 2018 Ultrasonic Examination. Level I COOPERATIVA CUJICANA R.L 2018 Magnetic Particles Examination. Level I COOPERATIVA CUJICANA R.L 2018 Liquid Penetrant Examination. Level I TRAININGTEC, C.A 2017

Reading and interpretation of International

Codes (ASME, API, NACE, TEMA)

TECNIWESCA 2011 Welding Inspector QA/QC

RHINO. C.A 2012 Heat Treatment Technician Level II CICB Crane Inspection and Certification Berau 2011 ASME B.30 Mobile Crane Inspector. TECNIWESCA 2011 Magnetic Particles Examination. Level I TECNIWESCA 2011 Liquid Penetrant Examination. Level I TEAM INDUSTRIAL SERVICES, TCM DIVISION 2011 Heat Treatment Technician Level I COOPERHEAT MQS. 2009 Heat Treatment Technician Level I WORK EXPERIENCE

Company: TÉCNICAS REUNIDAS.

Project / Location: Talara Refinery Modernization Projet (PMRT) / Talara, Perú. Post/ Positions: QA/QC Inspector (Construction phase) and Mechanical supervisor of Piping and static / Rotating equipment), Tightening and Bolt Tensioning, PSV s and Safety Valves (Maintenance, repair and calibration) in Pre- commissioning phase.

Period: July 2020 – September 2022.

Company: EUROCONTROL. / Técnicas Reunidas.

Project / Location: PMRT PETROPERU (Proyecto de Modernización de la Refinería de Talara) / Talara, Perú. Post/ Positions: QA/QC Inspector (Line Checker).

Period: July 2019 – July 2020

Company: QPM. SAC / Técnicas Reunidas

Project / Location: PMRT PETROPERU (Proyecto de Modernización de la Refinería de Talara). Visual Testing and thickness measurements on Pressure Vessel (heat exchangers, Desalter, Drums) and Pumps / Talara, Perú. Post/ Positions: NDT and Static Equipments Inspector. Period: January 2019

Company: QPM. SAC

Project / Location: Visual Testing and thickness measurements on Tanks, Piping and Mill (chaft, Trunnions y Linners). Gold Field Mine / Cajamarca. Peru.

Post/ Positions: NDT and Static Equipments Inspector Period: December 2019

Company: QPM SAC / STORK / SSK

Project / Location: PMRT PETROPERU (Proyecto de Modernización de la Refinería de Talara). / Talara Perú. Post/ Positions: Supervisor of Test Package and Hidraulic Testing in the Area DP1 (Primary Destillation) And Heat Treatment Technician Level II in FCC Area.

Period : Octubre 2017 – September 2018

Company: TERMOMEC / TGP SAC Turbogeneradores del Perú. Project / Location: Building of the Thermoelectric chilca 1/ Chilca, Sur de Lima, Perú. Post/ Position: Heat Treatment Technician Level II. Period: April 2017 – July 2017

Company: R.M Construcciones C.A

Project / Location: Plant 4. General Repair of PVAY-4 Y PSAY-4 /. CRP-Amuay ( Paraguana Refining Complex) PDVSA/ Los Taques, Estado Falcon. Venezuela.

Post/ Position: QA/QC and NDT Inspector.

Period : November 2016 – March 2017

Company: RHINO, C.A

Project / Location: Turbine TV-10. Building of the Thermoelectric India Urquia. / Planta El Sitio. Sta. Lucia. Edo. Miranda, Venezuela.

Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: July -Octubre 2016

Company: RHINO, C.A.

Project / Location: Repair of the Boiler 43-U-4301B, Building of the Tank por amine 31-TK-3101 A/B, Repair of the Reboiler 31-E3102 A/B and Piping Replacement of circuit MEA / PETROMONAGAS S.A. Jose Antonio Anzoategui petrochemical Complex, PDVSA, Venezuela. Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: June 2016

Company: IDT. Internos de Torres C.A / PFS PETROCHEM FIELD SERVICES) Project / Location: Stopping 2016. Repair and maintenances of Towers. Mejorador PETROPIAR, Jose Antonio Anzoategui petrochemical Complex, PDVSA, Venezuela. Post/ Position: QA/QC and NDT Inspector.

Period: May 2016

Company: RHINO, C.A.

Project / Location: PDVSA Project, Building of Gas Compressor Station. Los Morros Station / Villa de Cura. Estado Aragua.

Post/ Position: Heat Treatment Supervisor and Technician Level II Period: February - August 2015

Company: IDT C.A / PFS PETROCHEM FIELD SERVICES

Project / Location: Repair and maintenances of Splitter Towers (Fractionator). / PETROCEDEÑO, Jose Antonio Anzoategui petrochemical Complex, PDVSA, Venezuela. Post/ Position: QA/QC and NDT Inspector.

Period: November 2014 - January 2015

Company: RHINO, C.A. / PFS PETROCHEM FIELD SERVICES Project / Location: Repair and maintenances of Splitter Towers (Fractionator). / PETROCEDEÑO, Jose Antonio Anzoategui petrochemical, PDVSA, Venezuela.

Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: Octubre 2014

Company: RHINO, C.A / IDT C.A / PFS PETROCHEM FIELD SERVICES Project / Location: Tubes Replacements, Mechanical Cleaning and general repairs in the Furnace 01F-251. / PETRO SAN FELIX. (ANTIGUA PETROZUATA), Jose Antonio Anzoategui petrochemical Complex, PDVSA, Venezuela. Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: August 2014- September 2014

Company: RHINO, C.A / IDT C.A / PFS PETROCHEM FIELD SERVICES Project / Location: Repairs in the Primary Reformation Furnace 12-F-201 y Replacement of the Residual Steam Boiler 12-E-208, Stopping 2014. / FERTILIZANTES NITROGENADOS DE VENEZUELA FERTINITRO C.E.C. Jose Antonio Anzoategui petrochemical Complex, Venezuela. Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: July 2014

Company: RHINO, C.A. / Y&V.

Project / Location: PAGMI PROJET, CONSTRUCCION OF THE GAS PLANT / PDVSA, Guiria, Edo. Sucre. Venezuela.

Post/Position: Heat Treatment Supervisor and Technician Level II Period: June 2014 Company: RHINO, C.A

Project / Location: Costruction of the piping sytem in the “San diego de Cabrutica” Pump Station connected to PETROCEDEÑO Plant / PETROCEDEÑO, Jose Antonio Anzoategui petrochemical Complex, PDVSA, Venezuela. Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: May 2014

Company: RHINO, C.A

Project / Location: Interconection of the 26” Ø Gas pipeline Coming from “Jusepin” with the segregation Manifolds in the MUSCAR Complex./ Punta de Mata, Edo. Monagas. Venezuela. Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: April 2014

Company: RHINO, C.A, / Y&V

Project / Location: PAGMI PROJET, CONSTRUCCION OF THE GAS PLANT / PDVSA, Guiria, Edo. Sucre. Venezuela.

Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: September 2013 – March 2014

Company: RHINO, C.A,

Project / Location: Repair of Piping sistem and equipments, Stopping Plant / METOR (Metanol de Oriente) Jose Antonio Anzoategui petrochemical Complex, PDVSA, Venezuela. Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: August 2013

Company: RHINO, C.A,

Project / Location: Repair Gas pipeline of the S-1 Station. / YPERGAS National Gas Production plant, Altagracia de Orituco, Edo. Guárico. Venezuela.

Post/ Position: Heat Treatment Supervisor and Technician Level II. Period: July 2013 Company: (MPM) Maintenances, Projects and Assembleis. Project / Location: Corective and Preventive Maintenance of Towers, Drums, Heat Exchangers, Process lines and fire Systems, Partial Stopping of DCU Plant (COKE) / CRP (Centro de Refinación Paraguaná), Cardon Refinery. Pto. Fijo Edo. Falcon. Venezuela.

Post/ Position: QA/QC and NDT Inspector Period: May 2013 – June 2013 Company: RHINO, C.A

Project / Location: Heat Treatment on the Reactors 200-R-1/2/3/4. Stopping of the SUPEROCTANO Pant, Jose Antonio Anzoategui petrochemical Complex, PDVSA, Venezuela. Post/ Position: Heat Treatment Technician. Period: February 2013 – April 2013 Company: RMS Rosa Mística Construcciones

Project / Location: Repair of piping systems (Metalworkings) / Stopping AV3 and CD3 Plant, CRP (Centro de Refinación Paraguaná), Cardon Refinery. Pto. Fijo Edo. Falcon. Venezuela. Post/ Position: QA/QC and NDT Inspector. Period: February 2013 – April 2013 Company: RMS Rosa Mística Construcciones

Project / Location: Metalworkings Project (Manufacturing and erection of piping Systems)/ Extension of MDU Lubricant Plant, CRP (Centro de Refinación Paraguaná), Cardon Refinery. Pto. Fijo Edo. Falcon. Venezuela. Post/ Position: QA/QC and NDT Inspector. Period: November 2012 – January 2013 Company: RHINO, C.A,

Project / Location: Alkylation plant Stopping. /Guaraguao Refinery, PDVSA Pto. La Cruz. Venezuela. Post/ Position: Heat Treatment Supervisor.

Period: September 2012

Company: MPM, Maintenances, Projects and Assembleis. Project / Location: PRAC Stopping. Repair of the Coker Drums 12-V-001/002/003/004/ PETROPIAR Refinery, Jose Antonio Anzoategui petrochemical Complex, PDVSA, Venezuela. Post/ Position: QA/QC and NDT Inspector. Period: July –August 2012 Company: RHINO, C.A,

Project / Location: Extension Project. YPERGAS National Gas Production plant, Altagracia de Orituco, Edo. Guárico. Venezuela.

Post/ Position: Heat Treatment Technician. Period: May 2012 Company: MPM Maintenances, Projects and Assembleis. Project / Location: Repairs of the industrial Equiepments: T-2700, T-2701, D-2704, D-2711, D-2712, D-2703 A/B, D-2714 / ALAY Plant, CRP (Centro de Refinación Paraguaná), Amuay Refinery. Pto. Fijo Edo. Falcon. Venezuela. Post/ Position: QA/QC and NDT Inspector. Period: 14 February 2012 – 22 March 2012. Company: RHINO, C.A

Project / Location: Repair of thr Furnace F-801, Drum D-101 and piping System / Complejo de Hidrogeno Paraguaná. CHP. Pto. Fijo, Edo. Falcon. Venezuela. Post/ Position: QA/QC. Coordinator Period : November 2011 – December 2011 Company: RHINO, C.A

Project / Location: Thickness Measument with ultrasond Equipment (Corrosion Maps) Complejo de Hidrogeno Paraguaná. CHP. Pto. Fijo, Edo. Falcon. Venezuela. Post/ Position QA/QC and NDT Inspector. Period: September 2011. Company: SER 2004.

Project / Location: Manufacture of the Mechanical Parts in Machine and tool Workshop and repairs of parts and accesories of heat exchangers (Flange Grinding, Tensioning and Twisting Bolting,Bridadas, Tube Expansion, Parallelism). CRP (Centro de Refinación Paraguaná), Amuay Refinery. Pto. Fijo Edo. Falcon. Venezuela. Post/ Position: QA/QC and NDT Inspector. Period: May 2011- August 2011 Company: SER 2004.

Project / Location: Manufacture of the Mechanical Parts in Machine and tool Workshop and repairs of parts and accesories of heat exchangers 01E-1003E/F (Flange Grinding, Tensioning and Twisting Bolting,Bridadas, Tube Expansion, Parallelism) / U-Destilation, Área 1, Petrocedeño, Jose Antonio Anzoategui petrochemical Complex, Venezuela.

Post/ Position: QA/QC and NDT Inspector Period: May 2011. Company: SER 2004.

Project / Location: : Manufacture of the Mechanical Parts in Machine and tool Workshop and repairs of parts and accesories of heat exchangers (Flange Grinding, Tensioning and Twisting Bolting in flanged joints, Tube Expansion, Parallelism) / CRP (Centro de Refinación Paraguaná), Amuay and Cardon Refinery. Pto. Fijo Edo. Falcon. Venezuela.

Post/ Position: Inspector QA/QC en Área de taller y refinería. Perio: April 2011

Company: TEAM INDUSTRIAL SERVICES

Project / Location: Heat Treatment on Coke Drum V001/ Coke Plant, Petrocedeño. Pdvsa. C Jose Antonio Anzoategui petrochemical Complex, Venezuela.

Post/ Position: Heat Treatment Technician Period: March 2011 Company: COOPER HEAT MQS. / TEAM INDUSTRIAL SERVICES Project / Location: Heat Treatment to starting the Furnace (Smelter) / Lomas de Níquel, Via Las Tejerias, Edo. Miranda. Venezuela.

Post/ Position: Heat Treatment Technician Period: December 2010 Company: COOPER HEAT MQS. / TEAM INDUSTRIAL SERVICES Project / Location: Heat Treatment on the converter of PLNL Plant/ Trinidad y Tobago. Post/ Position: Heat Treatment Technician

Period:3 May 2010 – 29 May 2010

Company: COOPER HEAT MQS. / TEAM INDUSTRIAL SERVICES. Project / Location: General Stopping, PARC. en Tambores de la Planta Delayed Coking, CRP (Centro de Refinación Paraguaná), Cardon Refinery. Pto. Fijo Edo. Falcon. Venezuela. Post/ Position: Heat Treatment Technician

Period: November 2009 – January 2010

Company: TEAM INDUSTRIAL SERVICES

Project / Location: Extension Proyect, FCC Unity / CRP (Centro de Refinación Paraguaná), Cardon Refinery. Pto. Fijo Edo. Falcon. Venezuela

Post/ Position: Heat Treatment Technician Period: August 2009 – September 2009



Contact this candidate