Post Job Free

Resume

Sign in

Plant Manager Quality

Location:
Simpsonville, SC
Salary:
100000
Posted:
November 15, 2022

Contact this candidate

Resume:

Raymund Vieritz

** ********** ** - ************, ** 29981

864-***-**** - adti8v@r.postjobfree.com

Experienced Manager

Dynamic, results-oriented professional with over fifteen years of broad-based management experience and visible achievements in establishing best practices and process for supply chain management, process development/improvement, new/improved product development and testing.

INDUSTRIES: Wind Power Blade Manufacturing New Facility Start up, Manufacturing Line optimization and improvements, Medical Devises Class I & II (Cut and Sew operation, Tyvek, Kevlar, NOMEX), Metal Stamping and Extrusion (Steel & Aluminum), Heat & Cooling Air Distribution Systems (Steel, Aluminum, & Plastic Assembly), Automotive (Electroplating, Paint, & Chemical Treatments), Studies on Plastic Injection Molding and Wire Harnesses (Internship).

Outstanding leadership and team building strengths that generate optimum productivity and performance excellence from project teams. Committed to achieve corporate objectives with a proven history of delivering exceptional P&L results. Strong track record in leading organizational restructuring, and in building effective teams. Quality Product and Customer Service oriented.

KEY MANAGEMENT STRENGTHS

CAREER PATH

2018 – Today Senior Advanced Manufacturing Engineer

2010 – 2018 Senior Sourcing Quality Engineer Manager

2008 – 2010 Quality Manager

2007 – 2008 Plant Manager

2002 - 2007 Director of Quality for Product and Process Improvement, Cut and Sew

1998 - 2002 Plant Manager and General Manager for Mexico and Central America, Cut and Sew

1997 - 1998 Operations Manager for Mexican Manufacturing Facility, Cut and Sew

1997- 1997 Internship with Wire Harness and Injection Molding Company

1993 - 1997 University of Texas at El Paso

1980 - 1993 Air Force

1976 - 1980 Certified Skilled Worker

EDUCATION AND TRAINING

University of Texas at El Paso: El Paso, Texas 1997

BBA Degree – Production & Operations Management

University of Texas at El Paso: El Paso, Texas 1997

BBA Degree – Computer Information System

Deutsche Handelskammer: Muenchen, Bayern 1979

Certified Skilled Worker in Electroplating and Material Science

CHRONOLOGICAL ACHIEVEMENT DETAIL

GE Renewable; Greenville, South Carolina January, 2018 – October, 2022

Senior Advanced Manufacturing Engineer

Responsible for Supplier process performance with focus on:

-Wind Blade and Nacelle tooling qualification and improvements

-Support Manufacturing process improvement using quality reports as an indicator for process issues

-work with Supplier and Supplier Quality Team to improve manufacturing process using PFMEA, SPC, 8D, PDCA, APQP, RCA, PPAP, FAT/SAT

-Qualify heavy production equipment to support wind blade manufacturing

-working on implementing Metrology processes to validate blade parts and blade compliance to aero requirements.

GE Renewable; Greenville, South Carolina September, 2010 - January, 2018

Sourcing Quality Manager

Hired as Senior Quality Manager Technical Leader to support Global Sourcing in Product Qualification.

Implement APQP for Wind at GE and Supplier Level

Managed Global Suppliers in regard to Product Quality, Industry Standards, GE QUAL Requirements.

Established communications between Sourcing Engineers to manage document control, process liability, and product compliance to GE Product Specifications.

Supported Suppliers to comply National Safety and Industry Standards to ensure compliance.

Improved communications between GE departments with focus on customer’s needs.

Global support on Process and Product Audits for GE Suppliers.

VienTek a Mitsubishi/TPI Company; Juarez, Mexico February, 2008 – February 2010

Quality Manager

Hired to redesign and reorganize the Quality department to achieve acceptable standards.

Use Operations Management standards to assess the needs and operational functions of the Quality department.

Established communications between departments to organize document control and process liability.

Reorganize ISO and other required certifications to ensure compliance.

Establish and improved communications with customers.

ASC (Air Systems Components); El Paso, Texas; January, 2007–August 21, 2007

Plant Manager

Implemented new manufacturing and process control metrics to improve and control product quality and product output. Stabilized budget spending and increased sales to a profitable level.

Implemented Quality Improving Statistics and employee training to improve quality awareness by employees.

Focus on implementation of Lean Manufacturing and administrative process improvement to increase customer satisfaction and market share.

oFormed a task team to manage customer expectation on on-time delivery, product quality, raw-material availability, and special orders.

Managed our continuous improvement process.

oWeekly team meeting with engineering, customer service, materials, and production to discus problems and solutions.

Worked with Corporate Product Development and Quality to improve and develop new products and manufacturing methods.

Analyzed and improved Plant spending against Budget.

Managed our ISO program and Standard compliance.

Worked with corporate engineering to improve, cost saving, packaging method and materials.

Work on process and communication improvement between manufacturing facilities in El Paso Texas and Juarez Mexico.

DuPont/Mar Mac; McBee, South Carolina; February, 2002 – December, 2006

Director for Product and Process Improvement

Manages laboratory test support activities associates with Medical products and/o clean room Products.

Determines design/test direction for product line modifications.

Worked with the engineering department to improve manufacturing processes resolving in cost savings and lower raw material usage. Bottleneck reduction, preassembly, product standardization, equipment upgrades, operator training.

Worked with Customers on product and supply quality by involvement in product design, development, Corrective/Preventive Actions and communications improvements.

Advises Core Team on installation of equipment for clean room and maintenance of testing procedures for packaging materials and finished products, ETO and Gamma Sterilization.

Used Statistical Controls to improve product design, Customer approval, Root-Cause Evaluation, machine usage, machine downtime, and product cost.

oDMAIC (Design, Measure, Analyze, Improve and Control), Value Stream Mapping, Production Part Approval Process (PPAP), Failure Modes and Effects Analysis (FMEA).

Project leader to improve our customer service level in product lead time and finished product inventory turnaround.

Oversee supplier auditing and qualification for new or proposed suppliers. Provides quality control support to the Supplier Quality Assurance as requested or needed.

Managed all quality standards at DuPont’s domestic and non-domestic Manufacturing facilities in the USA, Mexico, Honduras, and China.

Implement and Oversee ISO 9000/2000 Certification, GMP Quality System, FDA Regulations and Medical Device Manufacturing Regulations, 21CFR 820 Quality System, Sterilization Process and Regulations for Gamma Radiation and ETO Gas.

Train personnel in Statistical applications to improve performance effectiveness and quality standards using MS-Office Software.

Developed a Maintenance plan to improve Equipment utilization and product quality.

Implemented a recall and emergency plan for FDA regulated products.

DuPont/Mar Mac; McBee, South Carolina; September, 1998 - February, 2002

Plant Manager and General Manager for Mexico and Central America

Project Leader to setup and run a Manufacturing facility in Honduras

oOutsourced Raw Materials, Managed Inventories, and Managed Manufacturing Schedule.

oOrganized and Managed Logistics

Managed two finished product suppliers in Central Mexico.

Researched, evaluated, and audit contract manufacturer in Mexico and Honduras.

Worked with suppliers on quality and manufacturing standards.

oRaw-Material quality and supply performance.

oFinish product quality and supply performance.

Developed a plan to stabilize unexpected product demand or fast changes in customer designed product.

Responsible for directing and coordinating the plant activities of various areas, ensuring the accomplishment of all departments, and operational and plant budgets by supervising a group of area managers responsible for all of the following activities: personnel, accounting, purchasing, production, quality, manufacturing engineering, traffic and materials, and maintenance.

Mar Mac/Cam Ram; Juarez, Mexico September, 1997 – August, 1998

Operations Manager for Mexican Manufacturing Facility

Responsible for coordinating and planning production activities, purchasing, quality, manufacturing engineering, traffic, and maintenance.

I implemented a new Quality System to detect in-process defects and improved Final Quality output to a 98.5% standard on Manufactured Units.

Reduced Warehouse space by 35% with the implementation of a Just-In-Time raw material delivery System, and the implementation of a simple production scheduling method, MRP.

Reduced Material handling Time and product flow by redesign the Floor Plan and Machine layout.

Increased Production output by 30% using Statistical Quality Design and Control methods outlining Bottlenecks and process flaws.

C. S. de Mexico, Juarez Mexico March, 1997- September, 1997

Internship and Industry Experience

Worked on Material Requirement Plan for Wire Harness Injection Molding Materials based on BOM and Customer orders. Worked on reduction of excessive material usage by using Kanban and Statistical Quality controls.

Studied Injection Molding Processes and most common Problems for Harness Housings. Worked on Maintenance Plan and Quality Procedure to Control Burned or Scorched Parts, Surface Imperfections, Incomplete Cavity Filling and Warpage of Parts.

Burned or Scorched Parts: Polymer may be becoming trapped and degrading in the injection nozzle. Melt temperature may be too high. Cycle time may be too long allowing the resin to overheat.

Surface Imperfections: Melt temperature may be too high causing resin decomposition and gas evolution (bubbles). Excessive moisture in the resin. Low pressure causing incomplete filling of mold.

Incomplete Cavity Filling: Injection stroke may be too small for mold (i.e. not enough resin is being injected). Injection speed may be too slow causing freezing before mold is filled.

Warpage of Parts: Non-uniform wall thickness of mold design. Uneven surface temperature of the molds.

Air Force; Germany July, 1980 – September, 1997

NCO

Trained in Computer Electronics to repair and maintain Mainframe and Air Defense Computer Equipment.

Trained in RADAR technology, Specialized in RADAR Equipment using Radioactive Tubes for frequency generation.

Accountable for planning and supervising weekly and monthly maintenance schedules.

Planning and organizing training and field exercises.

In charge of planning and programming Computerized Air Defense Simulations, for Battery Air Defense Exercises.

Bayerische Motoren Werke (BMW) AG, Munich Germany August, 1976 – June, 1980

Certified Skilled Worker in Electroplating and Material Science

Worked with a BMW Contractor to manufacture circuit boards and electronic wire connectors for Automotive and Train components.

Studied and evaluated metal compositions and their chemical reaction to each other under different climatic and mechanical conditions for corrosion, oxidation, electrolyzing.

Simulated aging process on electronic parts by robotic usage and climate changes (temperature &

Humidity).

Evaluated competitors (Mercedes, Porsche, and Audi) manufacturability and material usage in passenger cabin and upholstery.

ADDITIONAL INFORMATION

Honors:

A ward for Outstanding Academic Achievement, UTEP, 1996

Alpha Chi Honor Society, 1996

Commendation for Outstanding Academic Performance, U.S. Department of The Army, 1991

Honor Citizen of El Paso Texas, 1991

Computer literate, understand complex electronically and mechanical structures.

Bilingual English – German, some Spanish.

Strong Character, Good leadership, adapt to different environments easily.

Knowledgeable in MPC, MPS, MRP, JIT, Kanban System, TQM ISO 9000-94, ISO 9000-2000, Lean Manufacturing, 6Sigma, 5S, GMP, CGMP, Microsoft Office Applications.

Organizational Assessment

Customer Need Analysis

Productivity and Process Improvement

Training and Development

Product Development and Launch

New Supplier Development and Control

Statistical Design and Control

Change Agent

Production/Operations Manager

Lawson

are



Contact this candidate