Projects & During Shutdow a:
J Ray Medes Mott Middle East
Project: Ol & Gas Sector & Petrechemic Industory Fabricator
Position: Fabricator
From: @4-16-2019 to I1- 10-2020
RAY MCDER MOTT MIDDLE EAST:
Project: Oil & Gas Sector & Petrochemic Industry Fabricator
Position: as a Operator Assessment on JLG Model 860
From: 30-06-2008 to 11-10-2020
SK ENGINEERING & CONSTRUCTION CO. LTD:
e Project : RRE — Project, Ruwais
e Position : Piping Foreman
e From : 02-05-2011 to 21-02-2012
J RAY MCDER MOTT MIDDLE EAST:
e Project : Oil & Gas Petrochemic Industry Fabricator,
e Position : Fabricator
® Position : 19-04-2007 to 24-04-2010
DESCON ENGINEERING LIMITED:
e Pakistam P.T.A Piant During Shutdown —Feb-2007 (Packagees-P#2195) as a
Fabricator
© Project #2190 OMV Sawan Gas Field (Annual Tura—around.2006)
From : 06-Aug to 06-Sep as a Fabricator
e JGC Middle East FZE Gas Field
From : @1-April-2005 to 01-April-2006 as a Pipe Fitter
vee
: Bak
From : - 14 Jal-2004 to 17-Jan-2005 2s 2 Pipe Fitter
At Gasco— BAB Plant Shutdown Abu Dubai
From : Se Fiter
od Page 1 of 2