US born Citizen - MI Daryl Lenhard 248-***-****
Concept to Production Contract Assignments *************@***.*** Author / Editor / Analyst Aerospace – Defense – Product Mfg Eng Process Planner ME fab & materials process planner: Validate CAD configuration, engineering data mgmt, Tooling development, MRP origin thru production
& 1st Article QA producibility to match repeatability per CAD EBOM: Create edit, implement cost effective improvements to enhance fab & QA Coordinate improved process per engineering EBOM: aid QA non-conformance issues to Qualify FAA product build on manufacturing MBOM Utilize site plan Work Centers & Task Codes = Online Work Instructions: Validate 3D CAD models design release, process steps & inspect ops MS, Excel SS, PP; SAP/ ERP/PDM/ CAPP II, MES systems, Outlook, UNIX & Enovia: 6000 Hrs + CATIA V5 MBD verifying design & Catia tree 3D-2D GD&T theory: EBOM-MBOM liaison SME on Composite & Metallic structures: NCO planning per Eng review. Had secret B-2 LO Stealth Certs HT Composites thru autoclave: Flight line, production & flight test support. MRO Plans/QA on precision fit form & function per Eng design. Attended NASA ROSES DC Conference: Research Opportunities in Space & Earth Sciences: Still review proposals of interest within my field. Polar Technical LLC 08/20 - 11/22 Mfg Eng & fabrication: Prototype aerospace product build: for Mil-Com equipment mechanical transfer by Remote Winch Assy: Steel, Polycarbonate & Composite + OML Faraday cage enclosure. See brief lower pg 3, assisted Sr. Parent; WW II Honored Rosie the Riveter 24/7 med intervention UM, MI & John Hopkins, MD hospital’s: until her demise 6/3/22 at 102 yo 8/16 > 6/22 Chipton Ross El Segundo, CA Triumph Aerospace Contract TN: Mfg Eng Planner work instructions: wing development. 02/01/16 - 7/21/16 Catia 5 MBD data checker - G650 Gulfstream: Production support edit major SAP IT ghost operation errors from Savanna, Red Oak, TX to Spirit Tulsa plans, rewrite 110 plans override thru Gatekeeper. Ribs, stringers, spars, fuel tank, MEDS, GAMPS, Enovia & systems wing fab: Implemented & defined wing internal {fuel cell} mfg build plus fire control systems; Catia V5 3D MBD - Mfg Method Plans per EBOM-MBOM 1099 Contract Sr Mgr QA Team-Center configuration system process mgmt. Jan contract only: GM - DV/PV- PPAP (Audit at LGE) 01/16 Martin Technologies - New Hudson, MI LGE Inchon, S. Korea: Change Mgmt, Interview & Audit ISO T/S 16949 & AS9102 1st Article from Dept Mgrs to VP to ensure Policy Compliance Standards at LGE on GM electric vehicles. 49 pg plan footprint report off LGE business profile
& Team-center: Risk improvements comply with US Regulatory Requirements on audit findings to meet production guidelines. ECR/ECO QA Eng Compliance Core Review: electronic root cause analysis & vendor mfg support: R&D Report study to Production vehicle for Martin & GM. Polar Aero MI Developer - fab primary structures working prototype; composites, styling & mechanical. 27’ RV Modified build. 10/14-12/15 Created Polar 07 to develop methods / products - between contracts to support R&D projects - design, support & fab – see Polar below. Mfg Eng Tooling Surveillance 3mth Contract: Customer Liaison, monitor CNC in-house & offsite Tooling PO's V5 MBD-Enovia 6/14-9/14 GTS- {Ascent Aerospace} Sikorsky-Meggitt-Polar Aero S-92 Helicopter, Macomb MI Tooling Eng Mgmt vendor liaison & surveillance auditor Graphite Sponson Fuel Cells, L&R - FAJ’s: Expedited 51 CNC Invar mold tools: Al Vac Trim fixture to fabricate Composite Sponson parts: Master schedule at GTS Supplier for GA firm: 1st wk: un-planned supplier financial negotiations. Validated 1,377 tooling off loaded PO items
{SOW} vs. PO charges. Visited supporting vendors > research on later Robotic Cell applications. Supported Sikorsky Eng-QA stake & Eng Values on lighting strike Airworthiness driving Safe Fuel Sponson Mfg: Assist 2 FAJ's QA validation. Saved Meggitt $200k in off load cost Process Planner Tech Writer- Authored 125 pg Advanced Composite High-Temp Tooling Methods - US Army Drone Program 11/13 - 6/14 Polar Aero (my company) MI, Graphics, Illustrations, CNC Mold &Trim Tool Process for carbon fiber Mfg: + 27’ 1-Ton vehicle modification. Quebec Inc (my) Canadian Corp: Eng. ME Methods Planner Flight Simulator, Science Technologist - French to English 7/05/13-10/29/13 Bombardier Contract - Mirabel, Canada: C-Series Iron-Bird Flight Test ground rig Sim. ME Systems V5 VPM, Supported Eng work orders Check hydraulic leaks & flight controls. Flight Test aircraft (1) went airborne in Sept: ground test simulator work efforts cut 80% by Oct. Comforce, Redmond, WA Mfg Eng 4 Planner & Liaison: Boeing Certified ME on CAD Eng; Catia V5 MBD, Enovia & MRB. 6/12-3/27/13 Boeing Campus Contract - Seattle Mfg Eng using V5 MBD files, 787-9 H-Stab dev. lean support Flight Test DCAC Visiprize, NCM, OWI UNIX, PDM-CAPP II & Solumina: Shop liaison using Velocity & Redars software. NCM-NCR-NCO-MRP process root cause analysis & Red Tag issues. Plan-Author-Audit 3 Composite 787-9 H-Stab’s NCO's & 1 Static & Fatigue structural build: Analyzed 471k ERP items - Excel SS Strain gages QAMRB FAA conformance liaison - working ADPP's & IP Plans & shop work orders. Perfected 787 floor beam methods for India NDI Inspect included > ultrasonic planning, correct shop errors, NCO & QAMRB per PPAP WI Plan system operations-legacy system support. Polar Aero ME Developer-investment 27 ft concept 1 ton build. Composite, structural fab, eng & design {hydrogen engine assist}: 8/11-06/12 Visited Wright Patterson AFB, Dayton - discussed mobile UAV Flight Test prototype vehicle - built for flight test engineers to 1 day lease out. Noramtec, Rochester NY Catia V5 - Aircraft - Mfg Eng Planner - Science Technologist 4 – Process-Methods: CAD - Enovia. 03/11-08/11 Bombardier Contract - Montreal Lear 85 ME Methods Agent – Developed a series of composite mold tool methods using AL & Invar Tools. Al Trim tools for graphite. Assist support tooling for Mexico factory. Catia V5 MBD developed detailed 2D drawing design for Nose Cone Transport, vertical & horizontal stabilizer tooling: Checked 150+ Catia MBD, Excel SS to correct Tool design errors on ply layup EOP & T/H Locations 2 = Aircraft systems Eng: Wrote planning template for vendor composite tool orders + cost. Tooling guidelines 30 pgs hyperlinked 730 pgs of Bombardier Standards: SAP-ERD, Lotus notes. Created 2 Master Excel SS, highlighted offload & Tool Design + MRB errors. PDS Technical, Tukwila, WA Mfg Eng 4 Analyst & Process Planner - Liaison – Boeing Field Certified ME, $7 billion program - 06/10-02/11 Boeing Contract - Seattle WA Composite Science Technologist Planner- ground work on 14 composite spacecraft ballistic missile split Nose Cones for Sea Launch Russian Com & Defense Satellites: Boeing Com. Spacecraft Co: DCAC, Velocity & legacy: Logistics implement on 787 M&PT, PDM, CAPP, ERP Level 4 IT: Enovia, Catia V5 MBD. Velocity & Redars support on MEM manuals: MBOM-EBOM: UNIX IT Debug-Checker Global Mfg Eng. Enovia, QA PPAP Planning - covered Bellevue, Auburn, Everett & Tukwila, WA. Test Quality & Validation MRB - IT Proof of Concept, daily travels. Missile Eng development: validating drawings: listing 1,800 BOM items to Eng PDM vault from MES > BCA software, Eng. data capture: IT Ad hoc tests: Daily Excel SS tracking items for Eng, QA & CAD Catia V5 MBD on test validation
& airworthiness. Implemented direct Mfg Eng.’s to Boeing Com. Aircraft process from MES system to ERP, CAPP II & PDM & system support 2nd Covid-19 vaccination 05/26/21 Approved ITAR / EAR Compliance & Certs Volt Tech Service – Federal Way - Bothell, WA Boeing Campus Contract - Seattle, WA Mfg. Eng. 4 Science Technologist Planner on 787, 777, 747-8, 767& P8A: Ventilation, Flight Controls & Flight Test at Boeing Field “. Thermocouple’s & probe-duct builds, calibration processes Planning & shop fab tech support. Created Planning & verified PPAP EBOM & MBOM production requirements. Composite vendor liaison per UNIX-ITAR, Enovia Catia V5 validation: 2D dimensional Ref cad drawings for fab off 3D V5 MBD. Eng Liaison created shop floor work orders for 5x machining, red lined root cause corrective actions for 32 ME's per Excel SS notes. PDM, CAPP, ERP software, flight line, review Eng MRB issues in Redars: Catia V5 for NCR & NCO: Clean-up Eng errors & ELR process. Defined EBOM, authored assembly plans with CNC & QA Inspection steps: 777 Burn lab support OWI. Shop liaison: 3400+ hrs/yr, 26 days run 2 off. Boeing St Louis Eng P8A field liaison to aid Latest Eng Rev to meet CAD Catia V5 MBD on Flight Test Validation & Airworthiness: Supplier/Spares, Redars / Velocity 06/07 > 11/09 PlaneTechs, Oak Brook, IL AOG Composite ME, Mechanic Liaison 1st 787, Metal Structures, MRO support & training, Catia Plots 1/07-6/07 Global Aeronautica Campus Contract - Charleston, SC 1st Article Process Dev: 1st 787 Composite fuselage aircraft, TI Sec 1145 & Sec 43 Fuel tank barrel assy. Structures KHI-FHI Liaison AOG-ME, Set Geometry: Created 160 pgs MBOM shortages. ME invite to Boeing Field. 1st to establish x, y & z Geometry on 787 Sec - prior to line assembly: Change Mgmt relationship with KHI &FHI Eng: Latest V5 MBD release. PlaneTechs, Oak Brook, IL AOG Sheet Metal - Mfg Eng Mechanic Liaison - Major Structures, MRO FAR 145 - Catia Mylar Files 9/06-12/06 Evergreen Aviation Technologies Service EGATS Contract - Mod in Taiwan, China LCF -Large Cargo Freighter, LCF loaded 787 Fuselage Sec 41-Sec 47, sheet metal -structural support, Titanium, doublers, structures & nacelles: Swing tail, created x, y, z layout on A/C to set Avionics, cameras, hydraulics, stand-offs, electrical & flight control systems. ME Support Boeing AOG fab & Inspection on 747-400 Eng for FAA regulation & compliance. Resolve FAA & Inspector issues with Boeing prints from Moscow Fly by wire flight control systems install. Oxford International, Andover, MA Military Aircraft Tooling Design - ME Process Planner & Fab Jig & Fix MRO Structures 02/06-09/06 Pratt & Whitney Contract - MI High Temp Composite Tooling & Technical Consultant ME on Tool Design: Structures, Planning, Trim Drill Tools, Optics, Assembly Fixtures, Mil - Com Aircraft: 747-400 Engine Thrust Reverser Fixture Design, Overhaul & Repair, Tool Process Planning procedures with Inspection steps for clean room on blocker doors: Designed - hired & built at Vendor, multiple Thrust Reverser Steel Holding Fixtures for R&R: F-117 Stealth Engine Tool - Jig-Fixture built Net over 80". EBOM-MBOM - TI Honeycomb, SS high temp Bonding, clean room, auto clave 400* F process: Trim tool design. Reverse Thrusters, Optics & Metrology: Turbine, .0005” machine toler. 1099 - Contract CAD Eng Composite ME- Mechanic & Liaison - Structures Lead, MRO FAR 145 - Catia V5 - Eng Drawings 12/05-2/06 Aerodynamics Inc - Waterford, MI Update business aircraft avionic mods, antennas, sheet metal, black box, nav systems, com, adf, GPS+ Composites: Author technical process on HIRF-High Intensity Radiated Fields: Procedures, Airborne Equip using RTCA, DO 160E EUROCAE ED-14E - Fokker flight controls - Eng. & layout per FAA requirements. Set up avionics lab. MRO 145 Repair Station hangar: Lear Siegel Technical, OK City, OK Contract -Composite ME Process Repair: MRO 145 Support - Home break in, left to repair. 8/05-11/05 Hill AF Base Roy, UT B2 Complex, Composite & SM hands on process: A10 aircraft air control surfaces. Interim secret: home broken into. PDS Technical, Dallas, TX Composite Mfg. Eng. Process hands on Toolmaker, MRO Support - off Catia V5, Sheet Metal. 01/05 – 07/05 Nordam Contract -Tulsa, OK - Thrust Reverser’s, Radom's, high temp: Composite bonding tools, hands on Inspection Process. FAR 145 Repair Station Com, Military, B-52. Composite, Nickel & Titanium applications: Optics, hands on M.E. & Quality using Eng & CAD files 1099 - Contract Composite Mfg Eng Process - Toolmaker ({tooling program on A320 Airbus) - Catia MBD files & MRB 05/04-11/04 Norral Plastics Contract - GA, Airbus, GD Composite Nacelle build: HT bonding tools. Wing Fairing Tooling Fixture: Hands on compound Contours off EOP of OML surface: Master transfers. Vacuum Bag Process, Estimated router, drill tool design RFQ; Optics & ME liaison: DynCorp Fort Hood, TX Direct UH-60 Black Hawk Mod MRO, SM-Structures Set up tail boom C-Moss countermeasures for SAM’s - 2004
{Surface to Air Missiles} Directed to work in Afghanistan supporting Black Hawks: Was not interested in anti-biological injections to travel Contract Consultants, Bedford, TX CAD Engineering Military Helicopter Programs: Loftsman CAD Data Tool Design Checker 09/02-10/03 Bell Helicopter Contract - TX ME- Loftsman, 3 D tool design/photo templates, built lean shop aids. Composite TI-Al wing cove nacelles: MRB support on V-22 Osprey: Research, Plan define Eng Catia V5 3D Space Models, CAD data, wire frames, Detail dwgs, blade & hub Design build. Melighttaframe/Window IT Systems: Optics, 84 wks -1 yr- flight line support & liaison+ V-22 Static & Fatigue structural build. ATS Norwood, MA CAD Eng & Military UAV 1st Composite Prototype build - hands on fab + Process planner & developer 01/02-06/02 Aurora Flight Sciences Contract - WV for Northrop San Diego UAV Global Hawk, nacelle/skins. 1st composite full & 1/2 scale builds for Air Force & Northrop models: Technical assistance on graphite process vac bag build & ME methods. 1 UAV sent to WPAFB Museum. Fabricated antennas for all upper & lower surfaces: Developed engine inlet, vertical stabilizers & wing methods by hand, all high temp: Northern Technical, Thunder Bay, Ontario, Canada Composite ME Process-Interiors - Jig & Fixture: Wing Box Structures 06/00-12/01 Bombardier Contract - Montreal, Canada - Global Express - Interior Completion Center, Flight Line hangar, Loftsman - layout & install Composite interior Kevlar shells, honeycomb overlays, windows, per cad Eng. 12' lengths, using optics, process & sheet metal: Master Customer order squawks. Dorval transfer: Eng/Tooling site planning for CRJ700 optics, in-house & vendor site support, FAJ’s V5 optics Fuselage & Wing Box Tooling Fabrication: Challenger water bomber, air control surfaces, F/A-18 tool support. Plant # 2 in Saint Laurent: PDS Technical, Wichita, KS Composite Process - Jig & Fixture builder - Structures Support, Toolmaker - Catia V5 - Mylar's 12/99-06/00 Raytheon Aircraft Contract - KS - Jig & Fix, Composites Titanium honeycomb, Eng. support for corp. jets. Built main aft cabin jig, graphite Fuselage structures per Leica Laser tracker – Optics: King Air, Mandrel filament winding, Eng. & tooling. Static & Fatigue structural build. PDS Tech, Tulsa, Ok Composite Process, Sheet Metal MRO-Structures, Toolmaker improve production alliance with FAA requirements: Nordam TX Contract Composite repair, air control surf, spoilers, nacelle, ailerons, sheet metal. Dornier, Delta, NW 727, C130 08/99-11/99 US Travel - visit to Red Stone Arsenal, Huntsville AL {educational & travel} Experimental Research & Tech Planning 11/98-01/99 Grant Proposal US - Research on advanced composite compaction methods, applied on reusable space transportation technologies & Missile research: Travel to NASA on RA 8-21 Advanced Space Plane Concepts - technical process writing. Mfg Eng on R&D proposal: Solid working knowledge of FAA Regulations D. Lenhard Aviation & Contract OJT Certifications continued: {Enough classes; including required Air Force & Navy Certifications to write a Tutorial} PDS & Chipton Ross, Hawthorn CA - LO-Stealth Certified Composite Process - Surface Developer: B2 - Secret clearance - 1998 Northrop Grumman Contract - LO Certified for B2 Stealth bomber surface & engine modification block 30, Plant 42. High temp graphite, OML & engine bay composites: TI-bonding, outer mold line – LO work. Aircraft Division weekend transfer - Hawthorn to {up-north} MRO. Lockheed Skunk Works + Area 51 offer 1984 Nevada. All positions below = technical hands on to balance Engineering & QA OJT Certs. Contracts below: confidential clearance greater % Military aircraft tooling: plaster plastic pattern maker Sr developer, Jig & Fixture Bldr Master Model Maker: LO – Low Observable Stealth Certification. 7-12 hour days per week on 10 month runs+: Close tolerance to net = 0. Graphite Composite Tooling OML surface SME: OJT Northrop Certs ME/Optics thru applied Military Programs. 81-98 = 9 Northrop tours.
.
Trans Continental Airlines Contract - Ypsi, MI Commercial AC MRO Hangar -DC-6 air control surfaces - CDI – Mgmt composites-sm Northrop Ventura Div Contract Newberry Park, CA- Military AC Tooling, CAD-Eng Tacit Rainbow missile, B-2 air control “ surfaces, optics Brunswick Defense – Grumman - Marion, VA Military AC Lead on full scale lofting C-17 graphite air control surfaces, R&D layout, “ Canadair Aerospace Contract - Montreal, Canada..Commercial AC Tooling, CAD-Eng Airbus, F/A-18, CL-415 Water-bomber, Fab / QA, “ Northrop Aircraft Division Direct - Torrance, CA Military AC Plaster-Composite Tooling TD-Eng KB, K3, F-5, 747, F-20, T-38, F-18, “ Heath-Techna Aerospace Contract - Kent, WA Military AC Tooling, CAD-Eng: MD-80, C-17- Flaps, Master Model builds, K&E Optics Northrop Advanced Systems “, Pico Rivera, CA Military AC Tooling, CAD-Eng: B-2 Bomber development – until 6.0 earthquake hit “ Flameco Engineering Contract - Ogden, UT Military AC Tooling, CAD-Eng: V-22 Bell, TI hot forming patterns TD composite lead “ Northrop Ventura Div. Direct - Newberry Park CA Military AC Tooling, CAD-Eng: F-5, F/A-18, BQM144 drone, MX missile Institute R&D “ Grumman Aerospace Contract - Bethpage, LI NY Military AC Tooling, CAD-Eng: F-14, A-6, E2-C Hawkeye, Space Shuttle wings, Optics Gates Lear Jet Contract - Wichita, KS Business AC Tooling, CAD-Eng: GP-180, Lear 55, Master & patterns, composites + “ Beech Aircraft Contract - Wichita, KS Business AC Tooling, CAD-Eng: Starship, King Air, drones, Fab Master Pattern shop “ Lockheed California Co. Direct – Palmdale, CA Military AC Tooling, CAD-Eng: P3 AWACS, C5B, L-1011 Bld., Advanced Composites “ Northrop Ventura Div. Direct - Newberry Park CA...Military AC Tooling, CAD-Eng: Drones, F-5G, F-20, MX Missile, Institute R&D 24/7 + “ 1984 President Reagan authorized visit to Rockwell final assy: Space Shuttles Challenger & Discovery per SDI on OTV design concept. Northrop Aircraft, Torrance, CA Military Aircraft Tooling Eng Catia V5 Certs; F-20, F/A18, F-5G, 747, 767- T-38: Transfer to Ventura Div. Tacit Rainbow drones, MX Cruise Missile development, BQM-144, R&D UAV’s, MD F-15, FA/18, B-2- LO - KB, K3, K2, K1, F-23, F/A-18: Ventura Division B-2 air control surface OML Tooling: Newbury Park, CA. Sr. Plastic & Plaster Pattern Maker Developer: B-1B, F-117, B2, F-23 development = to F-22 & F-35 methods: Catia V5 MBD on room cure, HT composite layup on vac bag tools. Wind-tunnel models: Standard Optics Leica Laser tracker metrology xyz line of sight off 3D geometric TB values: splashes, surface transfers, plaster-plastic molds Precision layout, using height gauges, knee blocks, Jo blocks, calipers, micrometers, optical comparators to rig x, y & z values. High temp Graphite Auto-clave tooling methods: built to OML surface. MP&T metal bonding. Full military aircraft tooling build support. Tool Eng liaison Drafting Tool design, advanced materials, R&D & testing: 1st article thermoplastic polymer composite tooling: Jig & Fixture 89k hrs+ 12/14/81> Additional history: Optics denote, use of standard optics, i.e. K&E, Wild {pre-laser} > Leica Laser Metrology to plan FAJ site fab x, y, support. LO – Low Observable OML Surface Certification: Secret clearance B2 Stealth in-active Palmdale 98: 04 Hill AFB UT Credentials B2 Division Boeing Mfg Eng 4 Certs: Boeing Field Flight Test; Everett, Auburn, Renton, Charleston, SC, Tukwila. PDM - Product Data Mgr OWI / ADPP+ CAPP I & II: Mfg Eng Course # PST0024: MES Tooling – Design Plan Authoring & Maintenance Course # 74830 > five years + in Everett. Northrop Grumman & Lockheed OJT Military Eng & Optics; applied to 747 commercial aircraft production tooling & H.T. Composite process. Master tooling & production support; incorporating ARP4754A QA systems validation: AS9102 1st Article runs - audit on site & at suppliers. Own K&E Transit for critical optical tooling alignment, when hands on. Assisted Bombardier Montreal, align 1,200’ aircraft production line. Extensive mechanical tool design draftsman, using 5mm lead. Something about hand drawing closes in on details & enhances precision. Supported Boeing Field, Everett & Auburn site Procurement > 5+ yrs: Flight Operations Test & Validation Boeing Commercial Airplanes Flight Test & Production development support on 737, 747, 767, 777, 787 & P8A Poseidon: Contract Mfg Eng Process Planner & Analyst Level 4 - CAPP I & CAPP II SME (IT-system upgrades 2 yrs ahead of release, work out system bugs & IT testing) aside daily A/C planning. General ME activities: Mission critical planning-document specialist: QA data analyst, support Mfg Eng Manuals production & flight test + Mfg Eng / BOM Planning: Implement aircraft / spacecraft development per design engineering; tooling to production, military & commercial Bill of Material: ME Risk Planning on SOW to include 1st Article. HP loaner laptop, latest Catia V5 systems loaded software, SAP & CAPP. SME on Composite Tooling & all methods of fabrication: 5th & 6th generation technology, compression molding & tight auto-clave process. Have a wide variety of unique tools used in aerospace industry & skill set to accommodate builds that most find it nearly impossible to fab. Daryl Lenhard ME Process & QA Planner Howell, MI – present US born Citizen, 4th generation in MI Home base, MT *************@***.*** 248-***-**** Prefer Employment in Western States LinkedIn Completing fab upgrades on proprietary projects: honing skills on new designs & build applications. Open for Contract ME & Process Planner Or MRB rolls, either on site or remote. Presently packing it up to vacate MI by mid 12/22; heading west & 1st stop home in MT or land a good Contract in Nov & place all in storage: being home is around 5000’ above sea level & already has a foot of snow. Rather move summer of 23. Since 1995 supported Sr Parent till their passing at 102 & created some products through Polar. Back to new time allotment & work routine.
{Must read for 2022 Background Check} Birth Date 11/04 December 24th, 2015 - Received a letter from US Office of Personal Management that I was one of the original 4.2 million DOD contractors
(In part) with actual direct DOD personnel “where all our personal information down to SS #’s” was hacked by a China Network infiltration. This went to over 21.2 million US Citizens whose identities were compromised. 11/02/22 I’ve begun the process to file a claim offered by The US Government to cover losses & indiscretions as a result of financial damage to those caught up in the massive US Security breach. Unknowingly this should have been resolved years ago & noted may create false impressions on background checks or pending positions. Please let me know of any negative feedback that may arise, so I may fwd to the US Office of Personal Management. Some ID & credit Has been affected & OPM is offering Claimants $ settlements for the malicious hack & assured us that (fingerprint files) were not affected.