Post Job Free

Resume

Sign in

Civil Engineer Project Manager

Location:
Dubai, United Arab Emirates
Salary:
AED: 35,000.00/Month
Posted:
November 09, 2022

Contact this candidate

Resume:

Page * of *

CV of Shaik Abdul Khadeer Dec- ****

CURRICULUM VITAE

SHAIK ABDUL KHADEER

Mobile No: 00971-055-6588695; Email: adtfyb@r.postjobfree.com SENIOR RESIDENT ENGINEER / AREA MANAGER

OVERVIEW

Qualified Civil Engineer with specialization in management and extensive practical work experience of about 29 yrs. (26 years in the Gulf) in Construction of Residential, Commercial Buildings, Luxurious Villas, Town Houses, and Economical Villas Warehouses & Infrastructure Works. Excellent in controlling and managing all site aspects in accordance with the Conditions of Contract, FIDIC, Contract specifications and drawings, problem solving and evaluation skills, dynamic result oriented pro-active self-driven and sincere personality motivated by performance.

PROFESSIONAL LICENSE / APPROVALS

Qualified for UN limited test by Dubai Municipality

Registered Engineer with Dubai Municipality

Approved as a Resident Engineer by Dubai Municipality

Accredited as a Project Manager by Trakhees (Government of Dubai)

Approved as a Project Manager by various Government Departments of Dubai PROFESSIONAL MEMBERSHIPS

American Society of Civil Engineers (C.Eng., M. ASCE, M. CI)

Commission of Architects in Built Environment (M. CABE)

U.A.E Society of Civil Engineers (M. SOE)

Registered Member with APMI

STRENGTH

Engineering & Management Background

Work Experience of about three decades

Hardworking, Honest & Disciplined

Reliable, Effective, & Flexible Personality

EDUCATIONAL QUALIFICATION

Master’s in Project Management - JNU

Persuading Master’s in Construction Management- JNU

D’contd Master’s in Construction Project Management – HW-U.K (Dubai Campus)

Bachelor in Civil Engineering – O.U

Project Management using Primavera Level I and II -(SOE) Page 2 of 4

CV of Shaik Abdul Khadeer Dec- 2021

GULF EXPERIENCE

Details of Works in Dubai - U.A.E

1998 to Present : Working with M/s. M. Al Shaikh Mubarak Architectural & Eng. Consultants, Dubai Current Position Held : AREA MANAGER / SENOIR RESIDENT ENGINEER Projects Completed : BUILDINGS

- G+4 Residential Building @ Al Muraqqabat for M/s Al Ghurair Properties

- 3Nos G+3 Residential Buildings at Al Muteena for M/s Al Ghurair Properties

- 2B+G+6 Building at Al Barsha for Mr. Hamdam Shk Al Humari

-..2B+G+ 17+ Ser Level + GYM+ Swimming Pool Bldg. at Al Barsha for M/s. Binlahej

-.G+M+10 Story’s Building at Nasser Square, Dubai for Government of Dubai

-..2B+G+M+10 Story’s Building at Nasser Square, Dubai for Government of Dubai

-..G+4 Residential. Building at Al Qusais First, Dubai for Mr. Khalid Ahmed …Al Sheikh Mubarak Ali Al Shamsi (Government of Dubai)

-..G+4 Story Residential Building with Gymnasium at Al Qusais Industrial Area, Dubai

…for Mr. Rashid Butti Humaid Bin Bishr

-..2 Nos. G+3 Story’s Residential Buildings at Al Qusais, Dubai for Mr. Juma gharib and

…Ahmed Ali Essa (Government of Dubai)

- G+2 Story Residential Building at Hor Al Anz (East), Dubai for Mr. Darwash A. Hamid

(Government of Dubai)

-.2 Nos. G+4 Story’s Residential Buildings at Al Baraha Murar Qadeem, Dubai for Mr. Ali Rashid Lootah.

-..G+4 Story Residential Building at Al Barha, Dubai for the Heirs of Al – Hassawi …

(Government of Dubai)

-. G+2 Story Residential Building at Al Ghusais, Dubai for Mr. Saif Bunawas …

(Government of Dubai)

-.. 2 Nos. G+2 Buildings at Al Nahda Second, Dubai for Mr. Al Hashmi (Govt of Dubai)

-.. B+G+3 Story Building at Al Karama, Dubai for Mrs. Maryam Hamad Khalfan Al Delail

(Government of Dubai)

-.. G+3 Story Building at Al Nahda Second, Dubai for Mr. Mohd A R Al Osaimi …

(Government of Dubai)

-. .G+1 Story Building at Hor Al Anz, Dubai for Mr. Mohd. I.A Hokal (Govt of Dubai)

-.. G+4 Building at Al Murar, Dubai for Mrs. Amna Ali Saeed Qaryed

-.. B+G+4+GYM Building at Al Karama for Government of Dubai Wasl

-.. G+4 Building at Al DIP (Staff Accommodation) for M/s. Saleh Bin Lahej

-.. 3 Nos. G+4 Building at Al Nahda for Government of Dubai Wasl.

-.. Other various Residential and Commercial Buildings at different locations in Dubai Page 3 of 4

CV of Shaik Abdul Khadeer Dec- 2021

VILLAS

- 54 Nos. Town Houses and related infrastructure works @ Al Barsha for M/s Al Ghurair Properties

- 84 Nos. Town Houses + 8Nos Retail Centers and Infrastructure Works at Jumeirah Island for M/s. Nakheel

-..33 Nos. G+1 Residential Villas at Jumeirah-I, Dubai for Government of Dubai

-..10 +7 Nos. Government Houses at Zabeel for Dubai Municipality

-..G+1 Luxurious Residential Villa at Al Barsha-I Dubai for H.E Shaikh Saeed Al Nahyan

-..5 Nos.G. Floor Residential Villas at Lihabab, Dubai for Ejtabi Family (Govt of Dubai)

-..4 Nos. G+1 Residential Villa at Mirdiff, Dubai for Mrs. Nora

-..G+1 Luxurious Residential Villa at Mizher, Dubai for Mr. Butti Falasi

-..G+1 Luxurious Residential Villa at Mizher, Dubai for Mr. Khalid Eid

-..G+1 Luxurious Residential Villa at Al Safa, Dubai for Mr. Khalid Shk Mubarak

-..G+1 Residential Villa at Al Mizher First, Dubai for Mr. Wesam Al Abbas Hussein Lootah

-..G+1 Residential Villa at Al Wasl, Dubai for Mr. Bastaki

-..G Floor Villa at Al Mizher, Dubai for Mr. Khalifa Shaheen Al Marri

-..Other G+1 Villas at different Locations in Dubai WAREHOUSES

-..4 Nos. Storage Shed at Al Qouz Industrial Area, Dubai for Mr. Arif Saif Suhail Al Zaffain

-..G+1 Story Office Block and Storage Shed at Al Qusais Industrial Area, Dubai for M/s.

...Glulam Reda Zainal Trading Co.

-..11 Nos. G+M Storages at Al Qouz Industrial Area for Mr. Salem S.Abunawas Al Muhari

-..8 Nos. G+M Storages at Ras Al Khoor for Mrs. Maitha Mohd. PROJECTS IN HAND

- G+3 Residential Building @ Al Hamriya for M/s Al Ghurair Properties JOB RESPONSIBILITIES

Controlling and Managing all the project aspects in accordance with the Conditions of Contract Documents Liaising with the Clients, Local Authorities (Dubai Municipality, Trakhees, DEWA, Civil Defense etc)., following works as per the authorities rules and regulations, coordinating / monitoring with the assign Project Staff, Sub- Consultant’s, Main Contractor, all Sub-Contractors & Suppliers by arranging regular meetings. Assessing the progress in conjunction with the approved work programme and cash flow chart and monitoring the site progress closely by complying the safety / quality control, review of submittals, work shop drawings, interim bills, claims/variations, statement of completion, completion as per contract with proper documentation with snags/de-snags, testing/ commissioning works, handing over the project and preparing the closeout documents, etc. Performance certificate, Discharge certificate, Final project report & Final payment Certificate. Page 4 of 4

CV of Shaik Abdul Khadeer Dec- 2021

DETAILS OF WORKS IN JEDDAH, SAUDI ARABIA

January 1996 to April 1998 : Work with M/s. Affla Al Khaleege Contracting Est. Position Held : Civil Engineer

Projects Completed -.G+M+7 story Residential / Commercial Building at Abdullah Suleiman Street,

Jeddah for Mr. Al Hammodi

-.G+M+5 Storey Residential / Commercial Building at Abdullah Suleiman ...Street, Jeddah for Mr. Al Hammodi

-.Mosque (Jameyah Al Hammodi) at Abdullah Suleiman Street, Jeddah JOB RESPONSIBILITIES

Execution of Architectural, Structural, Structural and MEP works as per the approved drawings, allocation of works to all Subordinators, Manpower and Controlling the Sub-Contractors, follow up with the Project Manager and Purchase Officer for arranging the required materials, preparing bills for the Sub-Contractors, preparing estimates, bar bending schedules, calculating the quantities for the required materials etc., and also responsible for the quality and safety measures at site. EXPERIENCE IN INDIA:

Details of Works in Hyderabad India

June 1992 to December 1995 : Work with M/s. A.K Construction, Hyderabad Position Held : Civil Engineer

Projects Completed -.Construction of Computer Maintenance Center (C.M.C)

-.Construction of Ground Floor (180 Nos.) Housing Colony for Govt of A.P.H.B

-.Construction of B+G+1 Storey Mosque

-.Other private Residential Buildings and Villas in different locations WORKS ATTENDED

Execution of Construction of complete housing colony, Mosque works Civil, Structural & MEP works, Soil stabilized roads, R.C.C culverts storm water drains, lake area development works,, survey and leveling works, blasting of rocks by providing the dynamites, controlling of manpower, preparing bills for the Sub-Contractors, preparing bills for the Government Dept., Controlling the quality of works, arranging the Sub-Contractors etc. PERSONAL INFORMATION

Nationality : Indian

Marital Status : Married

Languages Known : English, Hindi and Arabic (Working level speaking only) Driving License : Holding Valid U.A.E Driving License (L/V)

In the Year 1992 worked as a part time



Contact this candidate