MARTAND KUTAR
H.N.-** Pushpak nagar, Adhartal Jabalpur, Madhya Pradesh
Contact: +91-972*******; Email: ****************@*****.***; Date of Birth: 26th December, 1980
SENIOR PROJECT ENGINEER
Offering 9+ years of rich and diversified experience.SUMMARY OF SKILLS
Sincere & focused professional with experience Erection and Fabrication(heavy steel structure & piping) currently working as Senior Project Engineer with M/S Simplex Infrastructure Ltd.
Proficient in project engineering,,Experienced structural & Piping Engineer with 8years’ experience in the heavy steel structure, Pipeline, Tank, Fabrication & Erection, Equipment Erections, also with Structural Fabrication & Erection, Installation; seeking a challenging engineer position for application of my experience to new areas of challenge, increasing exposure to technology & business practice.
Result oriented & responsible professional with a matured approach and able to make an effective contribution to the performance of a team with good leadership and motivating capabilities.
Core Competencies
Erection & fabrication Operations & Maintenance Mechanical Maintenance w Project Management w Strong Interpersonal Skills w Sharp Analytical Skills w Team Managementw Leadership Skills
PROFESSIONAL EXPERIENCE
M/S SIMPLEX INFRASTRUCTURE LTD since 2011
An ISO 9001-2008 certified company is one of the largest infrastructure solution providers in the country having presence across several fast growing industry vertical like power, industrial construction, urban infrastructure,oil & gas, marine, high rise buildings, Roads Bridges and Pilling in both India and Abroad.
Effectively monitoring and reporting the complaints of safety procedure and practices for the project site. Supervision of erection of PESB /Steel Structures
Deftly Planning, Scheduling and monitoring of project for timely completion
Ensures quality of work and safety at sites for man and material. Manpower and Material management.
Responsible for execution, supervision of work (Heavy Structure). Planning the specific job with risk and hazard analysis and preparation of monthly progress with customer and sub-contractor.
Handling preparation of weekly and monthly progress plans as per the requirement of clients. Making the schedule target to sub-contractor and its monitoring.
Involved in preparation Erection and Alignment Billing for client.
Coordinating the work efficiently with customer and top management as per schedule target. Looking after the site related activities.
Accountable for preparation of documents required for material management as per drawing. Inspection, Quality checking as per norms.
Maintaining appropriate site records. Coordinating with sub-contractor and site personnel’s during installation, erection, testing and commissioning of the equipment.
Monitoring and reporting the complaints of safety procedure and practices for the project site.
Responsible for studying drawing and plans of defiance fabrication structure. Planning and erection of TG & BUNKER, BOILER structure.
Presently simplex project handling in 2x800 MW NTPC Ramgundam TELANGANA. 2018 to till.
Project handle in Jamnagar Ril since 2013 -2018
Work includes Structural as well as Piping Work.
Piping fabrication & erection ( includes onsite / offsite Fabrication & erection ).
Preparation of Fit up Report, Joint Measurement Record, Preparation of BOQ for materials & billing purpose.
Alignment of Columns, Beams, crane girder etc.
RA Bill preparation for per month billing purpose.
Project Handled in Raipur
2x685 MW GMR Thermal Power Project (Make of Doosan India Project Ltd)
Structural fabrication & erection ( Marking, Cutting, Welding of Structural-Materials ) & Material handling
Erection of TG building,pump house, static equipment erection.
Engineer, Raikheda, Tilda, Raipur, 2011 - 2013
M/S SUNIL HI TECH ENGINEERS LTD, NAGPUR 2008 – 2011
Engineer
Started Working as a Trainee Engineer at sunil hi tech engineers ltd from 2008 to 2011.
Learned about the Structural materials viz ISMB, ISHB, ISIB, ISA, ISMC, - Gusset Plates, Stiffener Plates etc
Structural fabrication & erection ( Marking, Cutting, Welding of Structural-Materials ) & Material handling.
Piping fabrication & erection Work (MS,CS & SS,).
Safety Precautions in Industrial Construction Work ( Tool Box Talk, Site Induction, Permit to work, Job Safety Analysis, Method Statement, Risk Analysis )
Handled the 4x300MW JSW Energy Ratnagiri Ltd. (Make Of Shanghai Power Co. Ltd. China Project) Maharashtra. & 2 X 300 Mw Reliance, Butibori Nagpur,
Handled the erection of 4x300mw coal based thermal power plant TG & BUNKER structural work. Planning & scheduling of erection.
M/S SUDHA AGRO OIL & CHEMICAL LTD 2007 – 2008
12MW Coal Based Thermal Power Plant
Engineer
Handled Operation of FBC boiler in max Dna dcs system.
Identified and rectified problems related to rotary equipment & machinery.
EDUCATIONAL CREDENTIALS
BE in Mechanical Engineering, Jabalpur Engineering College, Jabalpur
Diploma in Automobile Engineering, Kalaniketan Polytechnic College, Jabalpur
Technical Skills
MS Office and Internet Applications, Auto Cad.
Extra-Curricular Accolades
Won Various Prizes in Athletes throughout Academic Career
Languages Known: English, Hindi
References: Available on Request.