ANIL YADAV
Personal Information
Full Name Anil Yadav
Date of Birth 07thNov 1990
Nationality Indian
Mobile Phone +234 905-***-****
E-Mail adteq6@r.postjobfree.com
Passport No L1142314
Date of Issue 03.05.2013(Valid up
Language Known Hindi and English
Current Position Sr. Engineer P
Key Qualification
I am (BE. Mechanical) have 11-year experience in Project works with broad experience Planning&Piping, steel structure, Piping
Handling, &HVAC Ducting Work.Also, I have
in Turnkey Project &Responsible for Installation implementation & activities.
Education
Institution Rajeev Gandhi technical University
Degree Mechanical Engineer
Educational Level B.E
School M.P Board (Bhopal)
Certification Higher Secondary
Educational Level Higher Secondary
Computing Skill
Windows Vista, Windows7,Windows
MS Word, MS Excel, MS Power Point and Internet Applications Current Roll & Responsibilities
Piping Fabrication
Monitoring of short
Piping master data preparation & updation (LHS & Erection
ParasCADD data updation & analysis with master data.
Preparation Billing backup data for monthly Billing.
Preparation of client MOM & coordinating meeting.
Preparation Monthly plan & 3 month look ahead for
Preparation Plan v
presentation to management.
Planning and controlling of
Preparing Manpower requirement According Company norm’s sheet against month plan & arranging manpower for completed
Prepare weeklyprogress review
site team Every Saturday.
DPR vs Actual Report, vs billing difference preparation monthly & monitoring.
Weekly progress &
STQ preparation and follow up with client.
Coordination & Communication with client for solving site issues. Address
S/o: Mr. Radhakrishna Yadav
Po: Sarlanagar
905-***-**** or +919********* Vil: Sarlanagar
adteq6@r.postjobfree.com Dits: Satna
M.P (485772) India
alid up-to 02.05. 2023)
Hindi and English
Piping
experience in Project works with broad experience
structure, Piping fabrication &Erection work,Additional experience Also, I have six-year Exp. in Rotary equipment’s
for Installation implementation &pre-commissioning Rajeev Gandhi technical University 2007
Mechanical Engineer
M.P Board (Bhopal) 2006
Higher Secondary Certification
Higher Secondary
Windows 10 and MS Outlook
Power Point and Internet Applications
Current Roll & Responsibilities
Piping Fabrication & Erection Materialtracking and controlling short material procurement & finalization.
Piping master data preparation & updation (LHS & Erection Details). ParasCADD data updation & analysis with master data. Preparation Billing backup data for monthly Billing. Preparation of client MOM & coordinating meeting.
Preparation Monthly plan & 3 month look ahead for Client &site work. Preparation Plan vs Actual Achieved comparison sheet weekly&monthly for presentation to management.
lanning and controlling of overall Manpower and Contractors. Preparing Manpower requirement According Company norm’s sheet against month arranging manpower for completed the task.
weeklyprogress review sheet& coordinate weekly meeting with management site team Every Saturday.
DPR vs Actual Report, vs billing difference preparation monthly & monitoring. Weekly progress & Productivity sheet preparation.
STQ preparation and follow up with client.
Coordination & Communication with client for solving site issues. Mr. Radhakrishna Yadav
experience in Project works with broad experience in Additional experiencein Material
Erection& Alignment
commissioning of Mechanical
2007-2011
2006-2007
and controlling.
Details).
site work.
s Actual Achieved comparison sheet weekly&monthly for
.
& coordinate weekly meeting with management&
DPR vs Actual Report, vs billing difference preparation monthly & monitoring. Coordination & Communication with client for solving site issues. 2 P a g e
Experience
ONSHORE CONSTRUCTION PVT LTD Feb 2019 to till now
Position Sr. Engineer Piping
Project Name DORC (Dangote oil refinery & Petrochemical company) Client Name EIL, India
Work Location Lekki free zone Lagos, Nigeria
Task
Preparation of All six units’ fabrication& erection Schedule Plan, for piping work.
Piping BOQ preparation and identification.
Checking technical designs and drawings to ensure that they are followed correctly.
Planning and controlling of Manpower and Contractors.
Piping Fabrication Materialtracking and controlling.
Piping master data preparation& updation (LHS & Erection Details).
ParasCADD data updation & analysis with master data.
Preparation Billing backup data for monthly Billing.
Preparation of client MOM & coordinating meeting.
Preparation Monthly plan & 3 month look ahead for site work.
Preparation Plan vs Actual Achieved comparison sheetweekly & monthly for presentation to management.
Prepare weekly progress review sheet & coordinate weekly ZOOM meeting with Top management & site Managers/in-charges Every Saturday.
DPR vs Actual Report, vs billing difference preparation monthly & monitoring.
ONSHORE CONSTRUCTION PVT LTD 7thFeb.2017 to Feb 2019 Position Piping Engineer
Project Name Dangote Fertilizer Ltd.
Client Name Saipem, Italy
Work Location Lekki free zone Lagos, Nigeria
Task
Work as a site Execution Engineer for piping fabrication & erection.
Piping BOQ preparation and identification material.
Fabrication and erection material issue sleep preparation according site request.
Checking technical designs and drawings to ensure that they are followed correctly.
Involving Piping Fabrication, Erection & loop clearance.
Material used in Project like CS, LTCS, SS and alloy steel pipe (P11 & P 22).
Monitoring to Site Supervisor Job activates like Spool Fabrication & ErectionAs per Project Requirement.
Preparation of Data Base for Spool Fabrication, Spool &random pipe Erection with Pipe Supports.
Providing technical solution and solving problems on site.
Responsible for Erection of Rotary equipment’s like Turbine, Compressor, Pump’s.
Alignment Responsibility for Rotary equipment’s (Turbine, Compressor, Pump’s.
Erection, Testing &Pre-Commissioning of Utility section, urea & Ammonia.
3 P a g e
MECWEL Constructions PVT. LTD. (Vijayawada) Jan 2016 to Dec 2016 Position Site in-charge
Project Name 2X45MW BLA POWER PVT LTD
Client Name BLA POWER
Work Location Gadarwara(JABALPUR)
Scope of Work Erection Testing & Commissioning of 2x45MW SIEMENS Turbine Task
Project work planning and controlling.
Supervising and overseeing the direction of the project (or a package), ensuring that the project specifications and requirements are met,& review the daily progress.
Liaising with the client, other construction professionals and, sometimes, members of the public
Coordinating and supervising construction workers
Selecting tools and materials
Co-ordinate and Motivate the Supervisors & workers to achieve targets with safety and quality
Finding ways to prevent problems and to solve site issue.
Material inspection at site, item verification with the drawing
Material used in Project like CS, LTCS, SS and alloy steel pipe (P11 & P 22, P91).
Preparation of quality documents and reports.
Preparing and reviewing of Method Statements and Work Specific Quality Control Plans.
Ensuring machinery/ equipment/materials received are in accordance with quantity
& quality.
Client billing and Subcontractor bill verification.
Coordination with owner.
Updates project status to all involved in the project on a Daily, weekly & monthly basis
Monitoring of HVAC Ducting work.
(HE) Hindustan Equipment PVT. LTD. [Indore] Jan 2015 to Dec. 2015 Position Project Engineer
Project Name AMR Cattle Feed & Dairy Plant
Client Name Amul Cooperative milk producer’s union Ltd. Work Location AMR DairyAmreli, Gujarat
Task
Material inspection at site & item verification with the Drawing.
Project planning and controllingtosubcontractor.
Coordinated with Boiler inspector for the Approval of IBR Drawings.
BOQ preparation and identification of materials.
Handling of quality documents and reports.
Client billing and Subcontractor bill verification.
Updating project status to all involved in the project on a Daily, weekly & monthly basis
Co-ordinate and Motivate to the Supervisors & workers for achieve targets with safety and quality
Coordinate and supervision for the installation and commissioning work.
Responsible forall Structural Erection & alignment works,
Responsible for Erection of Conveyers &Elevators,
Responsible forFO oil tanks, Molasses tanks, Silo for grain storage, WTP Plant, Utility Piping with Boiler& chimney.
Responsible for Erection & alignment of Hammer mill, Mixer, Pellet mill, Cooler& Automatic packaging machine.
Responsible forSite problem solving thru civil and mechanical coordination, drawings verification as per standards.
Responsibility of Punch list clearing & Hydro Testing.
System handing over to owner.
4 P a g e
MECWEL Constructions PVT. LTD. (Vijayawada) July 2013 to Dec. 2014 Position Site Engineer (1x180MW Skoda Turbine)
Project Name 1x180MWOPG POWER GENERATION LTD UNIT-IV Client Name OPG POWER GENERATION LTD
Work Location Gummidipundi (Chennai)
Task
Preparation of Quality related documents and reports as per client’s requirement.
Responsible for incoming materials Inspection with respect to approved quality Document.
Responsible for resolving quality related issues at site, as per the approved Procedures
Responsible for monitoring of Mechanical items storage as per the Project requirements
Responsible for Erection of Turbine,Gearbox, Generator, Condenser, GSC, HP& LP Heaters, Detractor & storage tank, condensate pumps etc.
Responsible forAlignment of Rotary equipment’s (Turbine, Compressor, Pump’s).
Responsible forFabrication & Erection of HP, LP, IPall Pipeline work.
Responsible forlooping & oil flushing works.
Responsible for air Blow test, Pneumatic test, & Hydro test(Pre-Commissioning) works.
Responsible forPunch list clearing form client and System handing over to client.
MECWEL Constructions PVT. LTD. (Vijayawada) June.2012 to July. 2013 Position Site Engineer (3x67 MW Siemens Turbine)
Project Name 3x67 MWTATA STEEL, (Kalinganagar)
Client Name Siemens India.
Work Location Kalinganagar (Odisha)
Task
Responsible for Erection of Turbine, Gearbox, Generator, Condenser, GSC, HP, LP Heaters, &condensate pumps etc.
Responsible forAlignment of Rotary equipment’s (Turbine, Compressor, Pump’s).
Responsible forFabrication & Erection of HP, LP, IP all Pipeline work.
Responsible for STG & BFP Pre-Commissioningworks.
MECWEL Constructions PVT. LTD. (Vijayawada) Feb 2011 to June 2012 Position Site Engineer
Project Name 1x388 MWPioneer Gas Power LTD, Mangaon (Maharashtra) Client Name TATA Power project LTD
Work Location Mangaon (Maharashtra)
Task
Responsible forFabrication & Erection of piping work.
Material used for Project like CS, LTCS, SS and alloy steel pipe (P11 & P 22, P91).
Responsible for Documents Preparation of fit-up, weld reports, Equipment & pipe erection reports.
Responsible forSTG & BOP erection, looping & oil flushing works.
Responsible forHRSG BoilerPiping Fabrication &Erection works. Declaration
Iherebydeclarethat theabove informationistruetothebest of myknowledgeand belief. Name: ANIL YADAV
Date: SIGNATURE