Post Job Free
Sign in

Flint Hills Power Plant

Location:
Corpus Christi, TX, 78401
Posted:
November 07, 2022

Contact this candidate

Resume:

Andres J Luis

Professional Summary

Experienced in Refinery, Chemical Plant, Power Plant work for 20 years. I have been in a supervisor position for at least 13 years dedicated to performance and establishing standards of excellence. Developed continuous improvements in the planning and implementation phases of each project. Able to create environments where staff members are comfortable in questioning and contributing to current ideas that drive company growth. Always having an open mind to new and better ways. I am a Firm Believer in “No Question is a stupid Question.” Professional History:

Stronghold LTD (Elite Piping Civil) – Shop Superintendent –

(2018 – Present)

Supervise workers at each job site to guarantee each project is complete with safety and with time management in mind

Work closely with Plant Personnel to ensure all jobs meet plant and safety expectations

Participated in job walks with plant personnel

Conduct daily area production meetings

Assure all crew members are adhering to plant safety policies

Schedules and oversees timely movement of equipment and material need for each job from plant to multiple job sites

Establish strong relationships with plant managers, planners, and operations to ensure scheduled equipment and products delivery times are met for each project

Built relationships with vendors/customers through constant communication regarding the needs and expectations of plant

Daily reports, log sheets, time keeping, Material Inventory for the shop and all major jobs. Maintain the database of inventory for full division of the shop.

Read P&ID blueprints, oversee the blueprints and make sure they match with the P&ID prints.

CCB Fabricators– Shop Supervisor/ Welder – (2008 – 2018)

Piping Supervisor –

Maintained supervision over welding crew, at multiple plant locations or job locations as well as the shop.

Monitor productivity of each job and ensure that expectations of each plant are being met

***********@*****.***

C: 361-***-****

10818 Grand Teton Dr. Corpus Christi, Tx

78410

Skills

• Client Interaction

• Customer service

• Forklift

• Forklift with extended boom

• Aerial Manlift

• Scissor Lift

• Overhead Crane

• Forms

• Human Resources

• Inventory control

• Invoicing

• Mechanical

• Outside sales

• Policies

• Purchasing

• Safety

• Sales

• Evaluation

• Welding

• Project planning and development

• Dedicated team player

• Expense reports

• Team oversight

• Performance evaluations

• Dependable

• Goal attainment

• Staff management

• Project management

• Startups and turnarounds background

• Team building

• Safety and compliance

Oversee that each crew member to insure they follow company policies and safety measures while at the plant, and on job sites

Provided coaching to employees and have an open-door policy with all crewmembers

Adhered to safety regulations and implemented them at each site

Expert knowledge in LOTO activities (hanging, verifying, and removing LOTO, and energy testing equipment)

Self Employed – Dukes Welding – (1999 – 2008)

Combination Rig Welder / Fabricator

Self-contracted under H&S Constructors in the Valero Refinery Plant.

Self-contracted under Bay construction at Flint Hills Refinery.

Fabricated all piping from Isometric Drawing’s.

Welded all sizes of pipe in the laydown yard and in the pipe rack.

Coordinated mechanical and installation work that meet plant needs and expectations

Managed installers and mechanics from beginning to completion of all repairs

Outlined all LOTO activities - hanging, verifying, and removing LOTO, and energy, testing equipment and hydro testing for each project

Perform daily rounds of plant equipment including checking pressures, temperatures, oil levels and operational status to ensure proper operations of plant of current job location

Ensured that safety of all direct crew members and job site was maintained.

Irwin industry – (2008 – 2002)

Combination Rig Welder / Fabricator

Welding tubes inside the boilers.

Fabricating piping off isometric drawing’s for outside off the boilers.

Bay Ltd – (2002 – 2000)

Combination Rig Welder / Fabricator

Fabricated piping off isometric drawing’s

BGI – (2000 – 1997)

Single hand welder

Assisted pipe fitters

STI – (1997 – 1994)

Firewatch

Welders' helper

Pipe fitter's helper

• Employee relations

• Issue resolution

• Blueprints and schematics

ACCOMPLISHMENTS

Welder of all exotic metals, Carbon

Steel, Stainless Steel, Copper-Nickel,

Hastelloy, Monel, Duplex, Stainless,

Aluminum, Cast Iron, Chrome,1/4

Chrome, 2 Chrome, 9 Chrome, and

Inconel.

Request References if needed

Tool Room helper

.



Contact this candidate