Post Job Free
Sign in

Industrial Training Energy Ltd

Location:
Ludhiana, Punjab, India
Posted:
November 06, 2022

Contact this candidate

Resume:

HAZRAT IMAM Mobile : 909-***-****,975-***-**** Email : *************@*****.***

Career Enhancement in erection of fire pipe line &Power Plant Commissioning and growth oriented organisation of repute.

*TOTAL EXPERIENCE 5 YEAR 02 MONTH

* POST APPLIED FOR --- MECHANICAL ENGINEER (PIPING)

SYNOPSIS

Working As a engineer with Bridge and Roof Co.(India) Ltd.

Working As a engineer with Agnice fire protection pvt. Limited.

Total 4 Years 11 Months experience in Erection, testing& commissioning & power plant, Fertilizer and Refinery .

Proficiency in daily erection planning with proper execution.

Reviewing of site work.

Sound knowledge of Microsoft office .

Recognized for analytical & decision making skills with establishing, improving and streamlining critical work scenarios, appreciated with numerous performance rewards from the organization.

An effective communicator & team leader possessing excellent planning, management, organizing & interpersonal skills.

B.E. in Mechanical Engineering from CSVTU BHILAI CHHATTISGARH(C.G.).

AREAS OF EXPERTISE

Planning of Execution

Planning of Execution Planning of handling the Erection jobs effectively.

Planning of both (material and manpower) and execution of the refractory lining jobs in per company plan.

Quality/ Safety standar

Monitoring the process parameters.

Responsible for the quality checking and clearance of materials.

Preparing of all protocol from relevant field.

Identify areas of quality failures and take steps to rectify the system.

Commissioning

Coordinating project execution.

Testing commissioning of fire hydrant Piping.

Dealing with the contractors, working according to time schedules, ensuring quality of work, maintaining safety at work.

PROFESSIONAL CAREER

1. 23 Feb.2019 to Till Date Bridge and Roof Co.(Inddia) Ltd. :-

Working with M/S Bridge and Roof Co. (India) Ltd. As a Site Engineer DFCU Plant. Guru Gobind Singh Refinery HPCL-Mittal Energy LTD. Bathinda,Punjab.

* Piping work in DFCU Plant.

* Piping Erection, Fab, Fitup & Materials store, All working with check report .

* Planning of handling the Erection job.

* Planning as per site work coordinate with Client.

* Mechanical clearance Loop file.

* Hydro testing for piping .

* Underground pipe line erection.

* punch point Attend.

* Testing & Box-Up.

2. 4th April 2016 to 30 Dec. 2016 Agnice fire protection Pvt. Ltd. Gurgaon Delhi Working with As a Assistant Engineer Reliance cement plant Maihar (M.P.).

*Fire hydrant system, Maihar (M.P.).

* Handling Project Materials store & record & GRN, Hydrant valve, Hose reel System,GV,Water monitor & Pump House .(Main pump, Jockey pump DE. Pump Erected)

* Installation of MCC Panel & DE. Engine panel, Pressure gauge & Pressure Switch.

* Assistant Engineer Worked in Erection testing& commissioning in fire protection system.

3. 1st Jan 2017 to 28 March 2017 Agnice fire protection Pvt. Ltd. Gurgaon Delhi Working with As a Assistant Engineer Reliance cement kundanganj unit Raebareli (U.P.).

* Fire hydrant system.

* Hose reel System, Riser Connection, Water monitor & Pump House .(Main pump, Jock Pump DE. Pump Erected) .

* Assistant Engineer Worked in Erection testing& commissioning in fire protection system.

4. 2nd April 2017 to 30 July 2017 Agnice fire protection Pvt. Ltd. Gurgaon Delhi Working with As a Assistant Engineer Torrent Pharmaceuticals Ltd. Punjab.

* Fire hydrant system.

* Hose reel System Riser Connection Water monitor & Pump House .(Main pump, Jock Pump DE. Pump Erected) .

* Assistant Engineer Worked in Material Record and Materials Inspection, Protocol, Erection testing& commissioning in fire protection system.

* Piping and Equipment Layout For Fire Water Pump House.

* Assistant Engineer Worked in Erection testing& commissioning in fire protection system.

5. 04 Aug. 2017 to 30 Oct. 2017 Agnice fire protection Pvt. Ltd. Gurgaon Delhi Working with M/S Agnice fire protection As a Assistant Engineer Fire protection system NTPC Dadri – Thermal, Stage #1 (U.P)

* Fire hydrant system.

* Planning as per site work coordinate with Client.

* Assistant Engineer Worked in Material Record and Materials Inspection, Protocol, Erection testing & commissioning in fire protection system.

6. 1st Nov 2017 to 15 Dec. 2017 Agnice fire protection Pvt. Ltd. Mumbai:- Working with M/S Agnice fire protection As a Assistant Engineer Fire protection system Reliance Shahdol Buhar Site, Mundra Site Solar

* Fire hydrant system.

* Planning as per site work coordinate with Client.

7. 18 Dec. 2017 to 15 Aril 2018 Agnice fire protection Pvt. Ltd. Mumbai :- Working with M/S Agnice fire protection As a Assistant Engineer Fire protection system GSFC Sikka JAMNAGAR – Gujrat State Fertilizers.

* Fire hydrant system.

*Material Record and Material Inspection, Protocol, Riser connection activities.

*Safety work activities Permit Hot work, Safety Induction, Toolbox, Fire safety inspection, Good housekeeping, Planning as per site work coordinate with Client.

*Assistant Engineer Worked in Erection testing& commissioning in fire protection system .

8. 16 May 2018 to 15 Aug. 2018 Agnice fire protection Pvt. Ltd. Mumbai Working with M/S Agnice fire protection As a Assistant Engineer Fire protection system & Dection System Nirma LTD. Bhavnagar Gujrat.

* Fire hydrant system.

*Handling Project Materials store & record & GRN, Hydrant valve, Hose reel System,Water monitor, Butter Fly Valve & Fire Extinguishers installation.

*Assistant Engineer Worked in Erection testing& commissioning in fire protection system .

9. 18 Aug. 2018 to 15 Feb. 2019 Agnice fire protection Pvt. Ltd. CHENNAI Working with M/S Agnice fire protection As a Assistant Engineer Fire protection system & FDA System. Grasim Industries Ltd. Nagda Site(M.P.)

* Hose reel System Riser Connection Water monitor & Pump House .(Main pump, Jock Pump Diesel Pump Erected .

* Handling Project Materials store & record & GRN, Hydrant valve, Hose reel System,GV,Water monitor, Material Record and Material Inspection, Protocol, Riser connection etc.

* Assistant Engineer Worked in Erection testing& commissioning in fire protection system.

TRAINING CERTIFICATION

Completed Vocational Training From BHILAI STEEL PLANT (C.G.).

Completed Industrial Training From SIMPLEX INFRASTRUCTURES LIMITED JANJGIR CHAMPA in 6X660MW KSK MAHANDHI Power Project (C.G).

Completed Industrial Training From ULTRA MEGA POWER PROJECT SASAN in 6X660MW RELIANCE POWER PLANT PVT. LTD.(M.P.)

ACADEMIC CREDENTIALS

BE (Mech) from (C.G.) CSVTU BHILAI. (65%)

10+2 from MP Bhopal Board

10th from MP Bhopal Board

COMPUTER SKILLS

Office Tools : MS Office

PERSONAL DETAILS

Date of Birth : 15 May, 1988. \

Sex : Male

Permanent Address : 69/2 Gahilgarh Paschim,Vindhyanagar,Distt-Singrauli (M.P.)

Current Address : Hazrat Imam,C/o Guru Gobind Singh Refinery Bathnda, punjab, Raman

Phone No. : 909-***-****, 975-***-****

I hereby declare that the information furnished above is true to the best of my knowledge.

Date : 14.06.2021 Name: Hazrat Imam



Contact this candidate