Post Job Free

Resume

Sign in

Aramco Clean Fuel

Location:
Qibla, Kuwait City, 14, Kuwait
Posted:
November 06, 2022

Contact this candidate

Resume:

Page *

ALFREDO M. ATUN JR.

#*** ***** **** **** *

Villasis, Pangasinan, Philippines

Email Add: adtdfe@r.postjobfree.com

Contact Number: +965********

POSITION APPLIED FOR: MECHANICAL/PIPING SUPERVISOR CAREER OBJECTIVES:

To be one of the contributing factors within a reputable company that will primarily undertakes job requirement towards achievement of a specific goals and objectives for the company itself. A positive work attitude, proficient accomplishment and injuring job flexibility can be offered. Enable to move the company up for its continuous business growth and success.

Career Background Summary:

Total 18 years of experience in Refinery & Petrochemical Industry, (BROWNFIELD & GREENFIELD) in various projects such as Plant Shutdown and Maintenance (rotating equipment). Involved in Construction and commissioning of piping & mechanical equipment works, execute mechanical completion, commissioning and start up, Plant Guaranty Test Request and Warranty. Piping modification of different service line and upgrading of existing pipeline required as project specification. Work as a team in Vessel Fabrication, Piping Fabrication and Installation in Project completion such as Offshore Platform, Module Assembly, Power Plants, Petrochemical Plants and Refineries Construction and Commissioning.

Interpret Engineering Drawings and BOMs. Translate the Engineering documentation into hardware using the materials provided within the time allocated in the production schedule in accordance with the company Quality requirements. Trained for Short Interval Scheduling, Knowledge for three weeks look ahead scheduling. Achievements in Oil & Gas and Petrochemical Industry:

Supervised the mechanical team in achieving successful mechanical run test, pre-commissioning, commissioning and repair of rotating equipment in KNPC-Clean Fuel Projects.

Commissioning and maintenance of rotating equipment at KNPC Clean Fuel Project in Kuwait.

Executed all Defect Notification Request (DNR) issues by company and handled the warranty issues of rotating equipment at KNPC Clean Fuels Project in Kuwait.

Supervised the team in shutdown activities in execution of Tie in, revamp and install new equipment at KNPC Clean Fuel Project in Kuwait.

Supervised the team in execution of 21 km. pipeline, sample transport system from shared lab facilities equipment to operation buildings at SADARA Project 725.

Work with the team for the execution of mechanical equipment installation at Kuwait Oil Tanker Co.(KOTC) New Filling Plant Project – Umm Al Aish Jahra Kuwait.

Work as a Team in Manufacturing of high thick Pressure vessels, Columns, Drums, Heat exchangers, Scrubbers, Reactors, De salters, Separators, Pig launchers, Receivers and skid mounted process assemblies for Oil & Gas refineries, petrochemical, water and power industries.

Work as a team in execution of mechanical equipment installation at soroosh and nowrooz integrated development project, Shell Iran Offshore. National Iran Oil Company. Technip/NPCC Consortium– Onshore & Offshore

Execution of Aramco Oil Production Platform installation, Marjan Gosp 2 Project (Saudi Aramco Offshore). North East Bab Phase1 Development Project ADCO – NPCC Consortium, Upper Zakum Oil Field Project, ADMA-NPCC Consortium.

WORK EXPERIENCE:

1. Company name : GS ENGINEERING & CONSTRUCTION - Mina Al Ahmadi Refinery KNPC Inclusive date : June 01 2017 – Up to Present

Position : Commissioning Mechanical Supervisor – Commissioning & Maintenance Project involved CFP BROWNFIELD Clean Fuel Project – Maintenance, Commissioning and start-up activity Page 2

Equipment Handled In Petrochem & Oil/Gas Industry Construction: Reciprocating Gas Compressors - Mitsui (6 units)

Diaphragm Compressor - Howden BC (4 units)

Centrifugal gas compressors – Elliot Ebara (3 units) and Sundyne (2 units) Liquid ring compressors - Sterling SIHI (2 units)

Screw Compressor, Instrument/Air Compressor – Airpack Nederland B.V Nitrogen roots blower – Unozawa-Gumi (2 units)

Chemical injection package - Decatech

Centrifugal pumps: GE, Flowserve, Weir-Gabbioneta, ITT-Goulds, Sundyne, KSB and Hyosung Air fin cooler TURBINE COMPRESSOR:

De - couple coupling spacer, check alignment TIR, DBSE, radial & axial float. Pinch check, clearance check, inspects shores for scoring. Uneven wear and for cracking and flacking, Seal clearance check; assemble the upper & lower seal halves. Journal bearing and thrust bearing Clearance checking Nozzle Centering & Chest valve assembling

Redial centering of rotor

Governor of line setting

Throttle trip valve (t&t valve)

RECIPROCATING COMPRESSORES:

Crank shaft web deflection checking

Piston rings and rider ring clearance checking and renewal Piston rods run out checking

Rod packing disassembly & assembly

Crank shaft bearing and main bearing clearance checking Cylinder liner and piston removal valve servicing

Cleaning and Oil Flushing

Single stages and multi stages, single & double action Compressors CENTRIFUGAL COMPRESSOR:

Magnetic radial and thrust bearing installation.

All type of seal installation Bundle pull out and servicing Flout setting axial centering and Redial centering of rotor Sundyne, Elliott, Vaughan, GE, Byron, Jackson, Single Stages and Multi-stages. MECHANICAL SEAL:

Installation and servicing of all type mechanical seal such as single seal, Double seal, and tandem seal, bellow seal, Etc.

ALIGNMENT:

Rim and face method (Graphical and analytical method) Reverse dial indicator method (Graphical and analytical Method) Opt. Alignment method. Any rotating equipment guide under through laser Alignment works. Senior Mechanical Technician (Commissioning & Maintenance)

Carried-out mechanical run test, pre-comm and commissioning to all rotating equipment at Units 144 / 107 / 125 / 137 / 138 / 146 / 61(4) / 39 / 19 & 12

Perform mechanical maintenance on rotating equipment and machinery monitoring equipment installation, levelling/alignment, oil flushing, pre-commissioning, commissioning, condition monitoring and troubleshooting.

Lead the team in maintenance and overhaul/repair of rotating equipment.

Perform all risk assessment, arrange permit to work, participate in rotating equipment troubleshooting, provide the repair recommendations and record the actions while ensuring that all site repairs are captured and documented.

Lead the condition monitoring during start-ups, shutdowns and normal operations.

Conduct vibration analysis primarily on rotating equipment such as steam & gas turbines, pumps and compressors.

Lead and organize the vendor support required for the mechanical rotating equipment packages and other utility packaged skids on assigned systems.

Page 3

Supervise and execute assembly/installation and shaft alignment of the equipment.

Supports the day-to-day operations and reliability of the refinery and tank farm by troubleshooting and solving issues found in the rotating equipment.

Supervise and coordinate craft workers in performance of the daily maintenance work plan and equipment repair scope.

Assist in planning of work force, material and equipment for routine maintenance, projects, shutdowns and turnarounds.

Assist superintendent in planning and coordinating mechanical work orders. Direct emergency repairs to systems, equipment, and components.

Interpret designs, Drawings, and OIM in locating and diagnosing trouble in mechanical equipment, components, and systems.

Direct the replacement of worn, damaged, or failed equipment and components in support of facility operations.

Demonstrate and conduct any required inspection and testing of equipment and components as necessary to complete work packages and ensure systems are returned to operational conditions.

Supervised the installation of piping, pumps, valves and other associated mechanical equipment in support of plant modifications and repairs.

Assist vendor in repair activities of gas turbine compressors, reciprocating compressors and pumps. 2. Company name : FGS EAST ASIA TECHNICAL & RESOURCEMENT MANAGEMENT INC. Alabang, Muntinlupa Metro Manila

Inclusive date : September 2016 – May 2017

Position : General Foreman

Project involved : CLEAN FUEL PROJECT/ NWC PROJECT 3. Company name : Saudi Arabian KENTZ Co. LTD. - P.O. Box 60752 Riyadh K.S.A. Inclusive date : Feb. 22 2014 – June 10 2016

Position : Piping Supervisor

Project involved : Shared Lab Facilities PROJECT 725 Install 21KM. SAMPLE TRANSPORT SYSYEM PIPELINE

5. Company Name : Hanwha Engineering & Construction - Um Al-Aish LPG New Filling Plant -Jahra, Kuwait Inclusive date : June 10, 2013- Sept.20 2013

Position : Millwright Technician

6. Company Name : JOHN PICKLE MIDLE EAST (JPME)

A division of Kuwait Pipe Industries and Oil Services (KPIOS) P.O. Box 3416 Safat 16035 Kuwait

Inclusive Date : February 01, 2007 – May 31 2013

Position : Vessel Fabricator

7. Company Name : NATIONAL PETROLEUM CONST. CO. (NPCC) P.O. Box 2058 Abu Dhabi U.A.E

Inclusive date : January 16 2003- January 27 2007

Position : Pipe Fitter

Piping Supervisor & Millwright Technician (Construction & Commissioning)

• Supervised the Shutdown activities tie in and revamp of CFP Unit 33 LPG Plant, and execution of Unit 25/26 CCR, Unit 39F New Flare Area, Unit 061 Process unit, Unit 29B Utility, Unit 64 Sulfur.

• Monitor all spool distribution in exact location from shop to field.

• Prepare Tie in lines, which include water flushing, steam blowing, Nitrogen purging, Blinding and Wedging to ensure that the existing line does not contain any residue prior to start the hot work activities.

• Planning and Inspection all shutdown works prior for tie in activities to organize overall workforce as required in the master schedule.

• Supervise work at site such as, dismantling of old pipelines, erection of new pipe spools, and pipe supports.

• Monitoring Spool erection and work progress, Line checking piping install in the site prior to submit for Client verification.

• Responsible for planning and executing Hydro-testing works for piping, after closing the NCR’s and Punch list clearance for the clients.

Page 4

• Supervised all testing activities and conduct as per Hydro test and testing procedures.

• Assist QC and ensures Test packs are reviewed for completeness and compliance by managing hydro test coordinators.

• Chipping and installation of padding on pipe racks structural foundation skid for pumps, vessels, knockout drums and other equipment foundation.

• Making layouts and chipping of hyper and primary compressors foundation for padding location as per drawing including soleplate installation and levelling.

• Installation of rotating equipment including centering levelling and alignment

• Mounting and coupling hub on motor shaft, Installation and erection of lower casing of FD-FAN and ID-FAN of boiler 1&2.

• Main bearing erection of FD-FAN and ID-FAN, leveling and centering of lower casing in ID-FAN and FD-FAN. EDUCATIONAL BACKGROUND

2019 - AUTOCAD 2D & 3D - International Institute of Computer Science & Adm. Mahboula block 2 bldg. 163 Kuwait

2014 - SMAW NC II - Luciano Millan Memorial School of Arts & Trades Asingan, Pangasinan

2000 - Computer Design & Programming – AMA CLC Naga City TRAINING & SEMINARS:

1) Millworks of Reciprocating Compressor - MITSUI E&S MACHINERY – 19 Oct. 2019 2) FIRST AID & CPR TRAINING COURSE - Wataniya Environmental Services Co. - December 2018 3) WORK PERMIT SYSTEM-CL-II - HSE Training Center - November 14 2018 4) LEADERSHIP TRAINING – LEADERSHIP & COMMUNICATION - Sadara Site Construction - April 15 2015 5) PRESSURE TESTING-ONE DAY WORKSOP - Sadara Chemical Company - April 05 2015 6) PTW RECIEVER TRAINING - L&T ATCO, DAELIM CHEM II, SADARA OPERATIONAL AREA 7) ROCKWOOL A/S THEORETICAL COURSE - Abu Dhabi – 2003-10-30 8) FIRE FIGHTING - N.P.C.C Safety Department - March 16, 2006 9) SEA SURVIVAL - Gulf Technical & Safety Training Centre LCC - (GTSC) Abu Dhabi UAE PERSONAL DETAILS:

NAME : Alfredo M. Atun Jr.

SPECIALIZATION : Oil& Gas, Construction (Offshore/Onshore) YEARS OF EXPERIENCE : 18 YEARS

NATIONALITY : Filipino Passport Holder

MARITAL STATUS : MARRIED

PASSPORT NO. : P2791360B

DATE ISSUED : 15 August 2019

DATE EXPIRED : 14 August 2029

CONTACTS : +965******** (work) +965******** (home) REFERENCES:

1. Joselito Bazarte 2. Vincent Ogbac

Company: Hyundai Engineering Co., Company: GS Engineering & Construction Ltd. S.A. Oddział w Polsce Position: Senior Engineer Kuźnicka 1, 72-010 Police Email address: adtdfe@r.postjobfree.com Position: Commissioning Engineer (Mechanical Rotating) Contact Number: +639********* Email address: adtdfe@r.postjobfree.com

Contact Number: +48 - 508 792 628 / +48 - 577 998 523 Project Location: Polimery Police Project, Poland

Hyundai Engineering Co., Ltd.

S.A. Oddział w Polsce, Kuźnicka 1, 72-010 Police

3. Paul Hennigan 4. Samuel Demetria

Company: Kentz Engineering & Construction Company: Kuwait Pipe Industries & Oil Services Position: Operation Manager Position: Operation Manager Email address: adtdfe@r.postjobfree.com Email address: adtdfe@r.postjobfree.com Contact Number: 003*********** Contact Number: +965********



Contact this candidate