power dispatch and direct/assist test crew
Communications with
Documentation of daily activities in designated logs
atus daily
fety conditions with potential to impact teams
o0 0
Update systems’ st
closing and
co Report or correct sa
¢ Experience and training include:
o 6+ weeks specialized training:
opening of AC and DC breakers SCADA System
Relay order of operation
Ground Testing Dense (GTD) and all operati
Work with external teams as necessary ensuring MBTA re:
May 2010 — April 2013
Power Control on computer-based remote
onal aspects
gulation compliance
HEAVY EQUIPMENT OPERATOR
MJ ELECTRIC Smithfield, RI
r for electrical projects throughout the US.
MJ Electric is a commercial provide
f transmission equipment to multiple
e Line Crew operator of 45 ton Tadano crane; yard crew
Drove tractor trailer responsible for handling and delivery 0
projects with diverse schedule needs
June 2000 — October 2000
Detroit, MI
WHITE TICKET LINEMAN
DAVIS ELECTRIC (LOCAL 17 DETROIT)
Davis Electric is a commercial provider for electrical projects throughout the US.
project: 4800V in metro area/13,200 outside metro area
easement climbing)
e Improvements
¢ Pole replacement, arm transfers, line maintenance (climbing,
January 2000 — February 2000
Groton, CT
LINEMAN
GROTON UTILITIES
Groton Utilities is a municipally owned and operated utility providing Electric and Water services to
thousands of consumers in Southeastern Connecticut.
e Replace/upgrade Street Lighting
¢ Terminations, high voltage, pad transformer hook-ups
ADDITIONAL PROJECT EXPERIENCE
-Maine Central Power: Ice Storm repairs. Distribution, frame, pull wire, cut over,
2nd Class Lineman
hot jumper, wreck out. (1999-2000)
Equipment Operator-Mass Electric
1999)
Lineman-JF White: NE Corridor Foundations Project: drilling,
volt. (1996-1998)
Lineman-Grattan Line: Hot distribution, framing, run wire and clipped-in single and 3 phase. (1996)
distribution, climb/set. (1996-
Lineman-. Rocha Pole Line Const.: Set utility wood poles. Cut & kicks,
-Mass Electric Const. Co: Refurbish MBTA Blue Line. All catenary, arms insulators and
Const. Co: JLG National Crane: frame/set catenary poles. (1 998-
set precasts for high speed rail, 25,000
1997)
Lineman
clipped-in regulated feeder. (1994-1995)
Lineman-Garthco Electric — Traffic controls and signals. (1993-1995)
Apprentice-Key Electric ~ Commercial Fire Alarm installation (1993)