Profile

- Education: Master in Electrical Engineering,

- Experience: 9+ years of Experience

- 5 Years in FMGC

- 4 Year in Power Sector & Oil & Gas

- Active online Membership: Saudi engineering council (626027), NFPA, IEEE, NEMA, OSHA, AMP Responsibilities.

- Provide Technical Support to supervisor and engineers, discuss and assign target to the team.

- Manage team of Mechanical, Electrical, instrument, and civil under my management.

- As per AMP standard, Plan & manage of Periodic, Preventive, Corrective Maintenance.

- Maintain inventory, Review equipment performance, Team performance, Root Cause Analysis.

- As per standard of IEEE, IEC, & NEC, Periodic testing of CT & PT annually,

- As per standard of IEEE, IEC, & NEC, Periodic testing of Protection & Switch gear of HV 132KV, 220KV

- As per standard of IEEE, IEC, & NEC, Periodic testing of MV Switch gear of 13.8KV,6.6KV and 11KV

- As per standard of IEEE, IEC, & NEC, Periodic Test of Transformer Pi, IR, CNDF, TTR, Dielectric, Dehydration

- As per standard of IEEE, IEC, & NEC, Test of Protections relays, SF6 Breakers, MCCB, MCB, Contactors,

- As per standard of IEEE, IEC, & NEC, Megger test of HV, LV, MV Motor test, Grounding resistance test.

- As per standard of IEEE, IEC, & NEC, Calibration of transmitters, flow, temperature, Level Transmitter, RTD.

- As per standard of IEEE, IEC, & NEC, Calibration of Control valve, Shutoff valves, SOV, hydraulic valve.

- As per standard of IEEE, IEC, & NEC, Calibrations of Process analyzers Sodium, TDS, Chlorine, PH, DO.

- Periodically, testing of I/O signals, Modules, ESD, DCS, RTU, vibration sensor, SCADA, Water Plant.

- Periodically, backup of all the Siemens S7, 200, 300, 400, 1200, 1500 PLC programs, Major Shutdown.

- Attend the Major shutdown of 72MWx2 GE Gas turbine Generator & 90MW Siemens STG, 320MW Chinese STG,210MWx2 Chinese STG & 210MWx3 Russian STG, and 134MW Korean STG

- During Shutdowns, as per SOP`s of IEEE & NEMA, Testing of MV 6.6KV, HV 132KV and 220KV Switch gear CT, PT, Automatic Synchronization system, Earthing test, and protection test.

- During Shutdowns, as per SOP`s of IEEE & NEMA, Testing of Transformer Pi, IR, CNDF, TTR, Dielectric, Dehydration, Protections relays, SF6 Breakers, MCCB, MCB, Contactors maintenance, HV, LV, MV Motors Megger test, fire fighting system, DC transformer, protection relays, synchronization relays, grounding system

- During Shutdowns, as per SOP`s of IEEE & NEMA, Calibration of TT(Temp Transmitter),RTD, FT(Flow Transmitter),LT (Level Transmitter), PT(pressure Transmitter), SOV, Control valves, Shutoff, hydraulic operating valves, vibration gauges, SOV, switches. Languages :

- Arabic (Basic)

- English

CMMS Software:

- SAP

- MP2

- ERP

- MAXIMO

- CMMS

Experience

Maihona Holding company:

Plant: ARAMCO ROSTP, O&M under Marafiq, Jizan,KSA 10/02/2022 to present

Watani Water Company Jizan, Saudi Arabia 12/02/2020 to 09/02/2022

Gourmet Beverage & Power Plant 03/08/2014 to 31/12/2020

234 MW CCPP Murdky Power Plant (IPP) 01/01/2014 to 31/05/2014

1370 MW Thermal Power Station Pakistan 17/12/2013 to 31/12/2013

134 MW ST Saba Power Plant (IPP) 26/09/2011 to 26/11/2012 Engineering Member:

- Saudi council (626027)

Safety Training:

- First Aid and CPR

- Firefighting and Hazard Risk

Assessment

- LOTO system & Permit to Work

System.

Qualification

- MS Electrical Engineering

(2014-2017)

- BS(Hons) Electrical Electronics

(2008-2012)

- PGD HSE (2010)

- PGD Petroleum Engineering

Computer Skills :

- MS Excel

- MS Word

- MS Power Point

- AutoCAD

- Designing

- Data backup PLC

- Email handling.

Active Member:

- IEEE/ IEC

- NEMA/ NEC

- NFPA

- AMP

- OSHA

Technical Training :

- Siemens S7 200,300,400

- Siemens S7 1200,1500

- Mitsubishi (Exon 16MR) PLC

- Power System Protection

- Project Management

- Engineering Report Writing

- Engineering Management

- Information Technology for

Engineer

- LV & HV Engineering

- Leadership & Change

- Environmental Management

System to ISO 14001

- Effective Communication

Reference:

- Reference can be provided

on Demand.

Miahona holding company

Plant: ROSTP ARAMCO (JEC)Jizan, Saudi Arabia.

1/02/2022 to present as a Maintenance Manager

Marafiq Approved

Responsibilities:

MARAFIQ Approved for the Plant ARAMCO ROSTP

Follow & maintain PTW & WI procedures, APR Approved from MARAFIQ,

Lead all Supervisor & Engineers Mechanical, Electrical, Instrument, Civil.

Follow Total Productive Maintenance (TPM) and Six Sigma rules.

Calculate MTTR, MTBF and Technician utilization,

Investigate major incident report (MIR) & Root cause Analysis (RCA).

Self-supervised all major the activities, provide technical support to supervisor and engineers.

Maintain the inventory and generate PR request in SAP and Follow up.

Maintain the KPI standards of Marafiq and Aramco.

Highlight the important points with the Marafiq & top management ..

Plan & Follow periodic maintenance of preventative and corrective & predictive maintenance Plan.

Review equipment performance, Team performance

Annually testing of transformer of 132kv to 13.8KV to 400V.

Annually maintenance & testing of Motors, breakers, contactor & earthing.

Periodic maintenance & replacement of bearings, Inspection of Valve seats plugs, piping’s, compressor oil replacement.

Periodic Calibration of control valves, analyzers and pressure, Level, Flow

& Temp. transmitters, Switches.

Annually testing of I/O modules, Signals, Drive units, Sensors. Watani Water Company Jizan, Saudi Arabia

12/02/2020 to Jan 2022 as a Maintenance Manager

Responsibilities:

Lead all Supervisor & Engineers Mechanical, Electrical, Instrument

Lead new Projects of Italians (line 3000bph), Germans (line 45000bph), Francians (ICE Water Treatment plant), 8 & 40bar compressor, NH3 chiller Follow Total Productive Maintenance (TPM) and Six Sigma rules.

Calculate MTTR, MTBF and Technician utilization,

Investigate major incident report (MIR) & Root cause Analysis (RCA).

Self-supervised all major the activities, provide technical support to supervisor and engineers.

Maintain the inventory and generate PR request in ERP.

Follow the preventative, corrective and predictive maintenance Plan.

Communication with manufacturer and suppliers & maintain inventory.

As per standard of IEEE/IEC/NEMA, Maintenance of VFD Drive, AC & DC motors, LV Panels and control Penal.

Annual Test of 33kv to 400V Transformer Dehydration, Dielectric, IR, Pi, TTR, DLRO & testing of protections.

Coordinate in Troubleshooting in PLC Siemens S7 1500, 1200, 400, 300, 200, Mitsubishi and AS-I (Master/Slave), Profi-Bus, Profi-Net & Profi Safe.

Maintenance & calibration of various type instruments Pressure, Flow, Level, Temp, Vibration Monitoring systems, TSI, Bently Nevada, Philip s, tesla, Field & Control Instrument attach with machine safety, PLC.

Software for Danfoss, Siemens VFD (FC202 and FC 302) & MCT10 Software Gourmet food Beverage & Power Plant

03/08/2014 to 31/12/2020 as Electrical & Instrument Head Experience:

Lead multiple new Projects of Germans (line 45000bph, 36000bph, 40000bph, 20000bph, 10000bph)

Lead Project of Chinese (Water plant 196000m3, and 100m3,

Lead Project of 25ton/h fire tube Boiler and 35Ton/h Water tube boiler.

Lead Project of 4x40bar and 6 x 10bar compressor & NH3 chillers.

Lead Project of Perkin, Cummins and Caterpillar generators of 7.5MW and Install Power ATS,

Annual Test of 11KV to 400V transformer(9500KVA) Switch gears, and Protection Systems

Periodic maintenance and megger testing of Motors, Breakers, Contactors, Transformer Dehydration, IR,Pi, Dielectric and protections.

Instrument Troubleshooting of Multiple PLC of Omron/ Mitsubishi/delta/ B&R Siemens S7-1500, S7-1200, S7-400, S7-300, S7-200.

Complex troubleshooting of AS-I (Master/Slave) for Phase, earth faults, Profi-Bus, Profi-Net & Profi Safe and Profi-cat

Complex Troubleshooting Equipment to Equipment interference and synchronization and optical fiber communication.

234MW CCPP murdky power Plant (IPP),Pakistan

01/01/2014 to 31/05/2020 as Electrical & Instrument Engineer

Attend the major Shutdown of nstallation and recommissioning of 72MWx2 GE Gas Turbine Generator and 90MW Siemens STG Generator.

Maintenance of generator firefighting components, Pneumatic components, Electrical components

Megger test of electrical MV/LV motors PI & IR.

Maintenance of MCB, MCCB, SF6 Circuit breakers, and Contactors.

Maintenance and Megger of HV 132KV and 6.6 Aux. transformer, De hydration test, Di electric test, Pi, IR, and Earthing test.

As per standard of IEEE/IEC/NEMA, Maintenance of VFD Drive, AC & DC motors, Switchgear Panels, Synchronize penal and control Penal.

calibration of Sodium, DO, TDS, Co2 and PH Analyzer (Swan, O2, ABB, Endress & Hauser).

Installation and calibration of Siemens pressure transmitters, flow transmitters, level transmitters, Siemens, Fisher positioner control Valves, gauges, SOV, switches, shutoff valves, hydraulic operating valves,

Installation and calibration of Bently Nevada vibration probes, speed monitoring units, I/O Signal testing, and data backup of Siemens CPU Modules.

1370MW thermal power station,Pakistan

17/12/2012 to 31/12/2013 as Electrical & Instrument Engineer

Major overhauling of 210MW x3 STG Russian, Chinese 320MW x1 STG, 210MW x2 STG with Chinese Teams.

Maintenance of generator components, Pneumatic components, Electrical components

Megger test of electrical MV/LV motors PI & IR.

Maintenance of MCB, MCCB, SF6 Circuit breakers, and Contactors.

Maintenance and Megger of HV 220KV, HV 132KV and MV 6.6 Aux. transformer, De hydration test, Di electric test, Pi, IR, and Earthing test.

As per standard of IEEE/IEC/NEMA, Maintenance of VFD Drive, AC & DC motors, Switchgear Panels, Synchronize penal and control Penal.

calibration of Sodium, DO, TDS, Co2 and PH Analyzer (Swan, O2, ABB, Endress & Hauser).

Installation and calibration of Bently Nevada vibration probes, speed monitoring units.

As per standard of IEEE/IEC/NEMA, Maintenance of VFD Drive, AC & DC motors, Switchgear Panels and control Penal.

Hands on Experience on Thermocouple, RTD, Sensors (Panasonic, Sick, P&F, Endress & Hauser’s, Siemens, B&R, ABB, Bentley Nevada, Flowserve control valve, Proximity, Ultrasonic Sensors).

As per standard of IEEE/IEC/NEMA, Maintenance of VFD Drive, AC & DC motors, Switchgear Panels and control Penal.

Installation and calibration of Rosemount pressure transmitters, flow transmitters, level transmitters, Fisher positioner control Valves, gauges, SOV, switches, shutoff valves, hydraulic operating valves.

Maintenance of various type instruments Pressure, Flow, Level, Temp, Vibration Monitoring systems, TSI, Bently Nevada, Philip s, tesla, Field & Control Room Instrument Control System attach with DCS, PLC, ESD.

Megger IR, PI test of electrical HV(6.6kVA) motors and LV 400V, generators.

Maintenance of MCB,MCCB, Circuit breakers, and Contactors.

Replacement of Silica gel of transformer, De hydration test, Di electric test, TTR and CNDF. Grounding test.

Installation and recommissioning of all instruments of temperature transmitters, RTD, Thermocouple.

Installation and calibration of Fisher positioner control Valves, gauges, SOV, switches, shutoff valves, hydraulic operating valves, 134MW saba power Plant, Pakistan

26/09/2011 to 26/11/2012 as Trainee Process Engineer

Attended Major shutdown of 134MW Steam Turbine Generator of Toshiba With Koreans

Experience to Work on ABB DCS, Baily infi-90 DCS, Wresting house and Siemens Control System.

Maintenance and Megger of HV 132KV and 6.6 Aux. transformer, De hydration test, Di electric test, Pi, IR, and Earthing test.

Experience to Follow Lock Out & Tag Out and Permit to Work procedure.

Installation & Check and Balance of Integrated Control Systems (ICS), Distributive Control Systems (DCS), Programmable Logic Control (PLC), Emergency Shutdown Systems (ESD)

Installation & Check and Balance of Fire & Gas Detection and protection Systems, Safety & General PLCs, Loading Arm Control System (LACS), Terminal Automation System (TAS).

Good knowledge of Power Plant Chemistry include Oil & Gas Analysis, Water Clarification, Demineralization, Reverse Osmosis, Sodium, Hypo. Generation, Primary & Secondary Cooling Water, Waste Water Treatment

& Environmental Monitoring

Fuel Oil Un loading & Storage Tanks (RFO & HSD), Eco-dine Canada ( Demin Plant), Boiler (Babcock & Wilcox USA 435 t/h and 1025t/h), Aux Boiler, 6.6 KV MVSG Room, Fire Protection System, CCW, Chlorination, Ash handling, Oil Water Separation, Condensate System, Instrument Air, Lube Oil, GR Fan, FD Fan, Steam Water Analyzer System.