CAREER SYNOPSIS

Grade “A “certified Graduate Engineer with Bachelor of Technology in

Electrical Engineering and a Masters degree in Business administration, over 26 years professional experience in the field of Electrical construction/Engineering, involved in various Iconic projects in Middle East GCC & India.

AREA OF INTEREST

BROWN K.S

(B-Tech,MBA,MIET(UK)

> Project Management, Construction Management

> Electrical Design & Built Projects

> Tendering& Estimation

> Testing& Commissioning

> Site Engineering,Coordination,Procurement

> Project commercial /contractual resolutions

ELECTRICAL MANAGER/

LEAD ELECTRICAL ENGINEER

Grade: A ( MMUPDA)

License No:7635 (Valid Until 08/04/2023)

EDUCATIONAL QUALIFICATIONS

Email:adt27w@r.postjobfree.com

MOB : +974 – 30011527(Qatar)

+91 – 903-***-****(India)

1.B-TECH (Bachelor of Technology Degree in

Electrical & Electronics Engineering): :

University of Calicut, Kerala State, India :

Year of completion 1995

Experience : 26 Years(Overall)

12 Years(in GCC)

PERSONAL DATA

Date of Birth : 01-11-1969

Place of Birth : Kerala,India

Sex : Male

Nationality : Indian

Marital Status : Married

Languages : English, Hindi,

Malayalam, Tamil

QID No : 269********

Valid until : 22/05/2023

2. MBA in Human Resource Management) :

: Year of completion 2011

: M S University, Thirunelveli, Tamil Nadu State, INDIA PROFESSIONAL MEMBERSHIP & CERTIFICATIONS

1.GRADE "A " Certified Electrical Engineer by the

Ministry of Municipality Urban Planning &

Development of State of Qatar. Registration No:7635 valid until 08/04/2023

PASSPORT DETAILS

Passport No : Z4761864

Place of Issue : Doha, Qatar

Date of Issue : 30/10/2019

Date of Expiry :29/10/2029

DRIVING LICENSE DETAILS

License No : 269********

Place of Issue : Doha, Qatar

Date of Issue : 29/09/2013

Date of Expiry : 25/09/2023

OTHER VISA PARTICULARS:

Visa No : 201***********

Country of issue : United States of

America

Date of Issue : 21/10/2019

Date of Expiry : 15/05/2029

2. Member of Institute of Engineering& Technology (MIET), London, UK

3. Project Management Professional Certification(PMP) completed MAJOR PROJECT REFERENCES

1.Hamad New Port Project, Mesaid,Qatar

2.Qatar Economic Zone Project of Manateq, Mesaid,Qatar 3.Al Seeliya & Viv Baharia High rise Hotel Project, Pearl Qatar 4.Al Awir Fruit & Vegetable Market Development Project, Dubai, UAE 5.Al Ahli & Al Nasr Stadium Projects for Youth Word Cup, Dubai, UAE 6.Al Mezhar & Al Garhoud Park project, Dubai, UAE

7.ENOC Fuel station project, Awir, Dubai, UAE

8.Cochin International Airport fueling station Project, Kerala, India PROFESSIONAL EXPERIENCE

1.Project Manager(220kV,GIS Transmission Substation Project) Currently working as Project Manager for the 220kV,200MVA GIS Transmission Substation Project at Calicut,Kerala India since 02 November,2020.This project consists of Installation of 2 Nos.of 100MVA,220kV/110kV Transformers with 220kV Double Circuit lines as Incomers,8 Nos.of 110kV outgoing Transmission Feeders, 2 Nos.of 110kV/11kV,12.5MVA and 1 No.of 110kV/33kV,16MVA Distribution Transformers and 8 Nos.of 11kV Distribution Feeders& 33kV Feeders, Substation Automation System with Bay Control Units,Control Rooms and associated supporting MEP installations spanned over an area of approximately 5 Hectors.This Gas Insulated Substation acts as the Main Grid Substation connecting to the nearest Generating Stations and is situated in the load center among 4 Districts. The role includes the Installation of Key EHV/HV equipments,EHT Transmission Lines, Testing & Commissioning of all High Voltage equipments and lines,Operation & Maintenance of substation which is delivering power in 4 different voltages such as 220kV,110kV,33kV and 11kV to various types of consumers and managing the shift duties by employing Operators and shift assistants. 2).Worked as Lead Electrical Engineer in Muhibbah Engineering Middle East, Doha, Qatar since December 5, 2016 till 30 September,2020 for the Qatar Economic Free Zone Project (MANATEQ). This project comprises of construction of 13 Nos. of 11 KV Kahramaa Distribution Substations, Developing Infrastructure networks for the Ship Lift & Boat Lift facilities in the Dry Dock as part of Port operation, 56 Km of HV cabling, street lighting activities etc. (Under Program Management Consultant M/s. EGIS International). The Project value is 1.1 Billion Qatari Riyal. The scope of work also includes Development of Various Infrastructure Networks related to authorities such as QAF Network, MOI-SSD Networks, QNBN Networks, OOREEDOO and ELV/SCADA Networks.

3). Worked with Sino Hydro-UCE JV for the NPP0057 Package at Hamad New port Project,Mesaid,Qatar from October 1, 2015 to December 5, 2016 as Senior Electrical Engineer. This package consists of 3 sub packages namely Port Administration area, Port Marine Unit and Coast Guard Terminal, comprising construction 11 Nos. of 22 kV Substations with 22kV Cable networks,40 Port administration Buildings, Coast Guard Operation Buildings & Port Marine Unit amenities, Pumping stations, Street lighting, Land fuel systems. The project worth 1.9 Billion Qatari Riyal (Under Program Management Consultant AECOM and Design consultants WorelyParson &AEB. As Senior Electrical Engineer, I was responsible for the implementation of 22kV substations and 22KV Cable networks, Power Management System, LV Networks associated with Building services. Job Responsibilities:

Project management including meetings, coordination, inputs to progress reports and project schedules

Detailed engineering and liaison with consultants until final approval

Technical bid evaluation, provide inputs to purchase orders & contract agreements

Vendor data review and preparing technical submittals

Equipment inspection, witness FATs at vendor factory where required

Prepare as-built drawings and documents

Conduct and participate in Project Integrated Design Reviews

Participate in 3D model reviews

Site supervision of construction, installation, Participation as a team member for testing, commissioning and hand over

Identify external interface requirements

Seek improvements to the project’s cost and schedule

Implement, follow-up and report of project man hour budget

In-charge of Project discipline engineering activities and ensure that it is carried out in accordance with pertinent specifications, statutory and other contractual requirements, with due regard to safety, operability, maintainability and constructability aspect

4). Worked as Project Manager(MEP) at Barzan Engineering Services, WLL, Doha, Qatar with effect from 26th May,2013 to 30th Sep,2015. Project Profile:

1).Al Messilla Palace/villa project ( Project worth 50 Million Qatari riyal MEP activities)-Completed

2. 2B+G+38 Floor Al Seeliya Hotel Tower Project at Doha, Qatar.(The total project cost is 300 Million Qatari riyal with 65 Million Riyal MEP activities) Responsible for the Engineering, design review, procurement, erection, testing and commissioning of MEP services comprising Fire Alarm & Firefighting System, Electrical Systems (including Substations),Bus Bar Risers System, Low Current Systems, BMS, HVAC System, and Water Supply & Drainage Systems

Fully In-charge for Electro-Mechanical works of the Project

Ensure successful completion of the Project within the budget and follow schedule time.

Responsible for planning & scheduling of all the major activities of the Project to achieve timely completion of the work at stage wise.

Monitor and guide site engineers on day-to-day activities, schedule & plan project operations in line of master plan with Planning department.

Prepare and submit Monthly Interim Payment Certificate and follow-up until final approval.

Responsible for all contractual issues related to the day-to-day running of the Project.

Attend all project related meetings with Client/Engineer/Main Contractor and reporting back to the Managing Director of BES on the proceedings.

To evaluate the requirement of materials, machinery, manpower, plan & mobilize the same to meet the schedule target.

5). Worked as Section Manager –Electrical (Projects, Power Distribution Wing) at Kerala State Electricity Board (KSEB), Kerala, India from 08/05/2006 to 20/05/2013. (KSEB is the unique power utility in Kerala State, India, having three wings in the business of Power Generation, Transmission and Distribution, under the direct control of Government of Kerala State, India) Responsibilities:

I was in full capacity as Officer in charge of the Section (Distribution), managing Distribution Systems, responsible to provide Electricity to all intended Residential/Commercial/Industrial consumers premises within the geographical area of the section, revenue and operations Management of Electrical Distribution centres in wayanad district- Annual Revenue Turnover of INR 25 Crore (USD 4 Million).

Major functions

1) O & M of 33/11kv Substations, 33 KV, 11 KV network, planning of 11 KV network for its improvement with respect to reduction in technical loss, line & cable faults etc.

2) Construction of New service lines from the level of 33 KV to 230 V. Installation and Maintenance of Distribution transformer/switch gear/ring main unit, revamping and improvement in Mini Section Pillar/Fuse Section Pillar.

3) Planning, Maintaining and Monitoring Street light system. 4) Outage management of HV/LV system.

5) Inspection of premises of factories, commercial shops and domestic building to provide service connection

6) Mapping of services - new, existing based on network alterations. 7) Maintain Drawing records - service sketches and drawing sheets. 8) Comply with the relevant provisions of electricity supply codes of Union of India.

9) Analysing the numbers and type of complaints received and accordingly planning network improvement, service revamping or removing illegal connections from the network.

0) Budgeting exercise, job costing, financial justification of a project 6). Worked as Project Engineer ( Electrical) in M/s. Condor Electro- Mechanical Co. LLC, Dubai, UAE (An ISO 9001 company) from 23 July 2002 to 6 May 2006 for the different projects undertaken by them, which consists of Erection, testing, commissioning of various LT/HT panels, Distribution boards, internal and external electrification for light and power, cable laying and installation of CCTV system, installation of MATV system, installation of Public address system, installation of Telephone and ISDN system, Installation of Fire alarm and firefighting system, installation of Electronic scoreboard, Coordination and support to the installation of HVAC, drainage and plumbing works etc.

Projects Completed in Dubai

1.Sports club development project at Al Ahli and Al Nasr Stadiuim of Dubai municipality for Youth World cup (Dirham 22 million project) - Status- Completed

2.Mezhar park and Garhoud park development project of Dubai Municipality

(Dirham 140 million project) - Status-Completed

3.G+4 building project at Diera, Dubai (Dirham 9 Million project) - Status- Completed

4.G+1 building project for Dubai Horticultural department of Dubai Municipality

(Dirham 7 million project) - Status-Completed

5.B+G+1 villa( 3 Nos) project at Mirdiff,Dubai (Dirham 15 million project) - Status-Completed

6.Development of world’s largest Fruit & Vegetable market at Al Aweer,Dubai for Dubai Municipality (Dirham 360 million project) - Status- Completed

7). Worked as Project Engineer (Electrical) in M/s. SIPL Contracting Co, Thane, Maharashtra, India (a leading Engineering contracting company in Thane, Maharashtra, India) From 02/05/1998 to 30/06/2002. Responsibilities: -

Major responsibilities included in Design and Field Engineering work of electrical systems.

Preparation & Supervision of Installation of overhead transmission lines, 33/11 KV

Substations and associated switchgears &Panels, Under Ground cabling.

Preparation of tender documents, scope of work & technical specifications and support during pre-bid & post bid clarification

Preparation of Daily, Weekly & Monthly Reports

Control of Sub-Contractor, Material Inspection from Client

Control & Preparation of Construction Schedule

8). Worked as Consultant Electrical Engineer in FEDO (Fact Engineering and Design Organization, A Government of India enterprise, involved in the huge construction projects of government sector companies) for the various construction projects undertaken by them, from 24/03/1997 to 30/04/1998 The projects done are:

a) Aviation fueling station project of Cochin International Airport at Cochin, Kerala, India. This project worth a total of Indian Rupees 160 Million, out of which the electrical work consists of Indian Rupees.15 Million. Duties: Supervising and directing Erection, Testing and commissioning of 6 MVA Indoor substations, consists of transformers, Diesel Generator sets, switch gears, etc. and Erection of Aviation fuel pumps, fire protection system, lightning protection schemes, earthing, cathodic protection schemes for underground aviation fuel pipe lines. Erection and commissioning of flameproof industrial lightings. Assuring quality of work and material.Scrutinising the interim payments bill submitted by the contractors. Attending techno commercial meetings with clients and contractors.

b) Petroleum oil lubricants Depot Project of Indian Oil Corporation, at Irimpanam, Cochin, Kerala, India. This project worth a total of Indian Rupees 220 million, out of which, the electrical work consists of Indian Rupees 28 Million.

Duties:- Supervising and directing Erection, Testing and commissioning of 15 MVA Indoor substation consists of transformers, Diesel Generator sets, switch gears,etc. and Erection of Aviation fuel pumps, fire protection system, lightning protection schemes, earthing, cathodic protection schemes for underground aviation fuel pipe lines.Erection and commissioning of flame proof industrial lightings. Assuring quality of work and material.Scrutinising the interim payments bill submitted by the contractors. Attending techno commercial meetings with clients and contractors.

9). Worked as Electrical Engineer (Maintenance) in the plant engineering Department of KELTRON, Kannur, Kerala, India,from 08/02/1996 to 07/02/1997. KELTRON is a manufacturing unit of Kerala state Industrial Development Corporation (A Government of Kerala Undertaking), which manufactures Aluminium AC/DC Capacitors.

Duties: Operation and Maintenance of 11KV/3 MVA indoor substation, 750 KVA & 250 KVA Diesel generator sets, 1500 KVA transformers, switchgears. Repair and maintenance of production machineries, centralized AC system, plant lightning protection scheme, Fire protection scheme, industrial lighting etc. Maintaining up to date records regarding the load and power consumption, preparing annual power management reports etc.