Post Job Free

Resume

Sign in

Shift engineer

Location:
Madurai, Tamil Nadu, India
Posted:
October 09, 2022

Contact this candidate

Resume:

PERSONAL PROFILE

ENTHUSIASTIC, SELF-STARTER, EAGER TO MEET CHALLENGES, ASPIRE TO LEARN, QUICKLY

ASSIMILATE TO NEWEST AND LATEST TECHNOLOGIES, SKILLS, CONCEPTS AND IDEAS. HIGHLY ANALYTICAL TEAM PLAYER WITH APTITUDE FOR QUICKLY SCRUTINIZING ENVIRONMENTS TO IDENTIFY AND PRIORITIZE NEEDS/RISKS AND DEVELOP SOLUTION. EDUCATION

SKILLS

SOFTWARE KNOWN: AUTOCAD, PRO-E, ANSYS ANDMS-OFFICE, C, C++. RESUME ESWARAN A

SL.NO COURSE NAME OF THE BOARD /

UNIVERSITY

PERCENT

AGE

YEAR

1 B.E

(MECHANICAL

ENGINEERING

)

S.VEERASAMY COLLEGE OF

ENGINEERING- PULIANGUDI

81.20

2017

2 H.S.C H.N.U.C. HR.SEC.SCHOOL,

PULIANGUDI

80.03 2013

3 S.S.L.C SEENIAMMAL HIGH SCHOOL 90.06 2011

ESWARAN A

61,AGASTHIYAR KOVIL STREET,

CHINTHAMANI–PULIANGUDI –627855,

TENKASI (D.T.).

Phone: 801-***-****,

E-mail: adsxkq@r.postjobfree.com

Experience

COMPANY NAME : CAPARO ENGINEERING INDIA LIMITED

PERIOD OF WORK: JULY 24TH 2017 TO FEBRUARY 21ST 2022 DESIGNATION : ASSISTANT ENGINEER – QC, HT

Responsibilities:

• INSPECTION OF RAW MATERIAL YARD TO CHECKING HOT ROLLED BAR WITH CORRECT DIAMETER, HEATNUMBER IN STEEL MILLS AND SPECIFIED MATERIAL FOR CUSTOMER REQUIREMENT.

• CHECKING RAW MATERIAL CHEMICAL ELEMENTS AND MICRO STRUCTURE LEVEL WITH COMPARED CUSTOMER SPECIFICATION.

• PREPARED WITH INTERNAL HEAT CODE FOR RAWMATERIALS AND COLOUR CODE USE IN EACH OF VARING GRADE OF MATERIALS.

• MANAGING, MONITORING HOT FORGING INDUCTION HEATER WITH REGULAR TEMPERATURE LEVEL CHECKING.

• OVERSEEING HEAT TREATMENT PROCESS WITH SPECIFIED TEMPERATURE IN SPRCIFIC HT PROCESS AND SPECIFIC HARDNESS FOR EACH OF PART IN CUSTOMER SPECIFICATION.

• MANAGING, MONITORING THE MPI (MAGNECTIC PARTICIAL INSPECTION) PART CHECKING FULLY INSPECTION TO AVOID THE CUSTOMER FAILURE FORMATERIAL CRACK,FORGING CRACK, LAB.

• PREPARED THE TEST REPORT TO SUBMITE THE CUSTOMER WITH ATTACHED CHEMICAL ELEMENTS LEVEL, MICRO STRUCTURE AND MECHANICAL PROPERTIES OF HARDNESS AND QUANTITY, INVOICE.

• LPG YARD INSPECTION LPG GAS UNLOADING CHECKING.

ROLE OF MY ACTIVITY

RAW MATERIAL YARD INSPECTION

• VISUAL INSPECTION OF THE RAW MATERIAL YARD TO CHECKING HOT ROLLED BAR WITH OUT ANY CRACK AND DAMAGE BAR AND CORRECT DIAMETER, HEADNESS, HEATNUMBER IN STEELMILLS AND SPECIFIEDMATERIAL FOR CUSTOMER REQUIREMENT IN EVERY PART OF MATERIALS.

• RAW MATERIAL TO CHECK CHEMICAL PROPERTIES TO CHECK ALL CHEMICAL ELEMENT SC,Si,MN,Cr,etc USE THE OPTICAL EMISSION SPECTRO METER (PDA-7000) SHIMADZU MAKE.

• TO CHECK RAW MATERIAL HARDNESS USE BRINELL HARDNESS MACHINE AND ROCKWEL HARDNESS MACHINE.

• TO CHECK MICRO STRUCTURE RAW MATERIAL 100X, 200X, 500XETC.TOUSE MICROMETER (NIKON EPIPHOT 200) NIKONMAKE.

• TO CHECK MECHANICAL PROPERTIES TO USE UNIVERSAL TESTING MACHINE TO CHECK TENSILE STRENGTH, YIELD STRENGTH OF MATERIAL.

• FINALLY RAWMATERIAL ALLOCATE INTERNAL HAET CODE IN EACH PART OF MATERIALS AND SPECIFIC COLOURCODE.

FORGING INSPECTION

• MONITORING THE HOT FORGING TEMPERATURE LEVEL IN INDUCTION HEATER IN REGULAR LEVEL.

• TO CHECK HEATCODE IN RUNNING JOB COMPARED TO INTERNAL ALLOCATE HEAT CODE.

• DAY BY DAY RECORDING TEMPERATURE ON FORGING.

HEAT TREATMENT INSPECTION AND PLANING

• MANAGING, MONITORING HEAT TREATMENT PROCESS WITH SPCIFIED TEMPERATURE AND SPECIFIEDPROCESS.

• CANDLES OF HEAT TREATMENTPROCESS

NORMALIZINGPROCESS

ISOTHERMALPROCESS

HARDENING ANDTEMPERING

• TO USE CONTINUOUS BUSHER TYPE FURNACE IN HEAT TREATMENT PROCESSTAKEN.

• PREPARED THE CHECK LIST OF FURNACE TO USE MONITRING THE DAY BY DAY WORKING CONDITION OF FURNACE, RECORDING BY OPERATOR TO VERIFY ON IT.

• TO CHECK THE SPECIFIED HEAT TREATMENT PROCESS AND SPECIFIC TEMPERATURE IN JOB.

• TO CHECK QUANTITY OF JOB TAKEN IN ONE TARY LEVEL IN SOP.

• DAY BY DAY RECORDING SHIFTWISE TEMPERATURE LEVEL OF FURNACE TO VERIFY ON IT.

• MANAGING AND CONTROLLING THE HEAT TREATMENT OPERATORS, CL PERSONS AND HEAT TREATMENT JOBPLANING.

• ANY ISSUE ON HARDNESS LEVEL TO TAKE CORRECT ACTION TO RECOVERY CORRECTION SPECIFIC HARDNESS OF JOB.

• TO CHECK THE HARDNESS OF JOB SPECIFICATION CUSTOMERSTANDARDS.

• FINALLY JOB GIVE SPECIFIC HARDNESS WITH CUSTOMER STANDARDS. MPI PLANING

• PREPARED CHECK LIST FOR MPI (MAGNECTIC PARTICAL INSPECTION) TO RECORDING MACHINE CONDITION DAY BY DAY BY OPERATOR TO VERIFY ONIT.

• MANAGING AND CONTROLLING THE MPI OPERATORS, CL PERSONS AND FINAL MPI INSPECTION JOB PLANING ON DISPATCHBASE.

• TOVERIFIEDTHEMPIINSPECTIONJOBANDREJECTIONJOBTOTAKENECESSARY ACTION. LPG YARD

• LPG YARD SAFETY PRECUTION PROCESS BEFORE UNLOADING THE LPG.

• COMPLETE THE UNLOADING MOLE AND VAPOUR LEVEL.

• FINALLY TO CLOSE AND INSPECTION AND CHECKING THE LPG LEVEL.

• DAILY CHECKING LPG LEVEL IN YARD WITH SAP RESERVATION PURPOSE. RECORDING DOCUMENTS LEVEL

• TO RECORDING THE RAW MATERIAL CHEMICAL, MECHANICAL TEST REPORT EACH OF PART.

• TORECORDINGHEATTREATMENTJOBWISE

1. HT MICROSAMPLES

2. RAW MICROSAMPLES

• ALL HEAT TREATMENT JOB HEAT CODE WISE RECORDING IN MONTH VOICE COLLECT ONIT.

• ALL JOB GRAIN FLOW SAMPLES PREPARED ONIT.

• PRODUCTIONDETAILSRECORDDAYWISEONEXCELFORMAT.

• TORESERVATIONHEATTREATMENTANDMETROLOGYLAB, MPICONSUMPTIONONSAP.

• FINALYTESTREPORTTOGIVENTHECUSTOMERTODISPATCHTIMEWITHATTACHED THECHEMICAL, MECHANICALTESTREPORTANDQUANTITY, INVOICEONIT.

• PREPARED AT SOP, PSS, PVRV, CONTROL PLAN, PPAP DOCUMENTS. PERSONAL VITAE

FATHER’S N A M E : M.AYYANAR

DOB : 25/02/1995

SEX : MALE

NATIONALITY : INDIAN

MARITALSTATUS : SINGLE

LANGUAGESKNOWN : TAMIL,ENGLISH

PERMANENTADDRESS : 61,AGASTHIYAR KOVIL STREET, CHINTHAMANI –PULIANGUDI, TENKASI(D.T),

PINCODE-627855.

INTERESTS : MANUFACTURINGOR PRODUCTION, DESIGN OF PRODUCT. HOBBIES : DRAWING, PLAY CRICKET, READING BOOKS AND SINGING SONG. DECLARATION

I, A.ESWARAN, HEREBY DECLARE THAT THE ABOVEMENTIONED INFORMATION IS TRUE TO BEST OF MY KNOWLEDGE.

DATE:

PLACE: ESWARAN A



Contact this candidate