,CURRICULUM VITAE
Name
:
Manjeet Singh Grewal
Present Employer
:
Engineers India Limited New Delhi (Govt. of India) (A Premier Consultancy Organization of Asia in Oil / Gas / Petrochemicals fields )
Present Employment Title
:
Senior Manager (Electrical System design / Project Cost Estimation)
Phone No./E-Mail
:
+91-971*******/ ****************@*****.***
Contact Address
:
C-95 Chander Nagar (T.H.A.) Ghaziabad -201011 (NCR) India
Nationality
:
Indian
Education Qualifications
:
HR Secondary School (11th Class ) passed in 1975 with science subjects
Diploma (3 years Programme) in Electrical Engg. (1975-1978) from Technical Board of Delhi Administration-passed in 1978 (India)
B.E./B.Tech. (Electrical Engg. 1978-1981))-Associate membership of Institution of Engineers (India) in Electrical Engg. branch from Delhi Centre in December 1981.
Total Experience
:
37.5 years which includes 20 years of Electrical distribution system Design + 17 years of Project Cost Estimation & 1.5 years of Electrical site Supervision in Oil/Gas /Other Projects in India /abroad
Detailed Professional Experience
Total work Experience in the company (Engineers India Ltd, New Delhi India) : 37.5 Years (Dec1979-April 2017)
A Combined Experience of Electrical power System Design ( 20 years ), Electrical site supervision ( 2 years ) & Project Cost Estimation/electrical Cost Estimation (17 years ) for various Refinery / Petrochemicals / Gas /others projects in India/abroad (Algeria), while working in ENGINEERS INDIA LIMITED . (EIL is a Govt. of India Organization ) - A Premier Consultancy organisation in Asia in Oil / Gas / Others fields having Projects in India /abroad for more than 55 years ) with Head office in New Delhi - India .
My fields of experience are as mentioned below:
- 20 years of Electrical system design engineer - (Dec 1979 -Dec 1999) in head office -New Delhi
- 18 months as Electrical site Engineer at site as an Electrical Site Engineer (Dec1999 - May2000) at Mathura Refinery (Uttar Pradesh) India
-17 years of Project Cost /Electrical Cost Estimation Engineer (June 2000—till date) in head office -New Delhi
Main Job activities performed as Electrical System Design Engineer
Demonstrated Capability of attaining 100% satisfied results in completion of many Mega Oil/Gas Projects as Electrical power system Design Engineer. Following, the Main Electrical power system design Engg activities performed for every project handled
Prepare the Basic Engg / Design Basis document freezing elect system parameters & the proposed power feed arrangement / from Client’s electrical system for detailed engg of the plant
Study for Impact of new facilities on Client’s Electrical system ( Fault level Analysis, Voltage Profile, System stability, Components suitability )
Electrical system studies for Fault Level calculations for various Phase faults/Ground fault conditions, Voltage Profiles for various Transient/steady state conditions, Maximum allowed motor starting conditions under worst conditions, Sizing of Power Correction Capacitors, Sizing calculations for HV/MV Transformers, Generators, All types of HT/LT Cables, HT/LT Bus Ducts, DG Sets, NGRs, Reactors, VFD Panels, Isolation Transfo for VFDs, UPS System, DC Battery system, Load analysis, Load Flow studies, Voltage drop calculations for motor starting
Single Line Diagram depicting Power Components with Relay & Protection requirements for every HT/LT/Auxiliary feeders, S.L.D. showing every single power feeder of Plant starting from Client’s power point to the last Electrical load in the plant with indicating all HV/MV transformers, HV/MV switchboards, DG Sets,NGRs, UPS, DC system, Capacitors, VFD Panels, HT/LT Cables, ASBs LDBs, miscelleneous Panels/Loads
Prepare Area Classification Drawing for the Process area & utilities, Selection of electrical eqpts as per classified area requirements. FLP, Type-N Type-e eqpts like Motors starters, WRs, FLP Control Stations, Lighting Fixtures, Ltg/Power Panels, Glands etc
Design of Sub-stn building & Prep of Equipment Layouts of Sub-stn showing all HT/LT Trafos, Bus Ducts, NGRs, Reactors, HT/LT Panels, PCCs, MCCs, ASBs, UPS room, Battery room, Operator control room ensuring HVAC & Pressurization of building
Preperation of Installation drawings for all types of HT/LT/Miscellaneous type of Panels, Boards showing detailed installation details, Cable trays, trenches, Oil Pits, Transformer bays, Earthing loop of sub-stn through AUTO-CAD software
Vendor enlistment as agreed with the client, Evaluation / Selection of New Vendors for electrical items procurement for which no list exists
Preparation of Material Requisitions of all electrical items (HV/MV Packages, Transformers, switchboards, NGR, UPS, Battery system, F,A, P,A, Telephone system & others) Prep of TQs, Vendor discussions, Prep of TBAs, Prep of Purchase requisitions, Purchase orders
Prepare Cable tray/trench/Power layouts in the plant rom S/S to Electrical loads, Indoor/Outdoor/ Buildings Lighting Layouts ( Normal / Emergency/Critical Lighting) covering every area of Plant, Earthing Mat sizing, Earthing Layouts for Sub-stn buildings & for entire plant, Lightening Protection system for Sub-Stn, other Buildings/ structures, Switchyard, Earthing calculations for sizing of the earthing mat in switchyard & Earthing Lauout in Switchyard All the Layout Derawings prepared hrough AUTO-CAD Software
Prepare the design/distribution for & prepare the Layout drgs in Plant area for Fire Alarm, Public Address system, Telephone system, UPS, DC Battery system VFD Panels & other miscelleneous Panels
Prepare the various types of Control schemes/schematics to be implemented in various HT/LT Panels for auto change over of Incomers, Group re-accleration of HT/LT motors, Various types of starters for HT/LT motors/Control Stations/Instt. Control Panels through AUTO-CAD Software
Preperation of control schemes for Auto- Mains –Failure (AMF) schematics between PCC & DG Set supply panel for auto change over, Automatic start of DG Sets through AUTO-CAD software
Co-ordination with all other engg deptts/ Client’s project deptt for preparing miscellaneous plant engineering (Power/Lighting/Earthing) layouts
Prepare the Installation drgs of each & every Control Panel being installed (various Mech. Packages) in the plant in co-ordination with structural/Mech/Other deptts
Prepare Cable tray/trench/power layout drgs, for various Mechnical Packages, HVAC System Indoor lighting layout drgs, Earthing layouts of all the indoor Packages earthing/ Lightening protection Layouts
Prepare the interconnection diagrams of all electrical eqpts covering each & every Panel & every Electrical eqpt being installed within the Plant covering their inter panel inteconnection & prepare the Cable schedules for each of elect eqpts/Panels including interconnection with Instrumentation & other packages
Calculate the detailed Electrical MTO for all electrical facilities including Installation testing & commissioning of each & every eqpt involved in the Plant & Cabling, Lighting earthing activities, F.A. P,A, Telephone systems of the Plant & Prepare the Electrical Tender for installation of Electrical system in the Plant
Approval of Electrical vendor drawings of each Electrical eqpt ordered & to be installed at site as per the job requirements & Interface of all electrical eqpts with other Deptts Panels at site
Design of Heat tracing system & Laout drgs. for process pipings Electricals as per Area Classification requirements covering FLP/Safe area Heat Tracers/ FLP/Safe area Cotrol Panels/Boxes/ Cables/ Cable Glands
Design of Temp Cathodic Protection System (Sacrificial Anode) & Permanent Cathodic (Impressed Current System) & the Layout Drgs
Site Co-ordination, Site Visits, Vendor visits, Co-ordination with Client including any other engg activity required for most successful completion of the Plant
Prepare Protection co-ordination Charts showing the relay settings of all types of relays in all the electrical/VFD/Micellaneous Panels in the plant
Prepare the AS-Built drgs of the Plant as per as marked drgs obtained form site
Skills attained for carrying out the above engg activities: AUTO-CAD, Deptt available SOFTWARE PACKAGES
Main job activities performed as Cost Estimation Engineer in various jobs
Demonstrated Capability of attaining 100% satisfied results for completion of many Mega Projects as Cost Estimation Engineer . Following were the Main Cost Engineering activities performed for each project handled
Supervised, Managed, achieved the desired results for the detailed cost estimate with 10% accuracy (for DFR) including estimates for all engineering disciplines ( Civiil, Structural, Electrical, Mechanical, Rotating, Piping, Instrumentation /others) for projects in DFR (Detailed feasibility Report) mode
Supervised, Managed, achieved the desired results, for the detailed cost estimates for all individually procured items/ packages with 10% accuracy for ordering purposes for EPCM ( Engg, procurement, construction, Project management) type of projects .
Supervised, Managed achieved the desired results for the detailed cost Estimates with 10% accuracy (for Bid Comparison / ordering purposes ) for various EPCC / LSTK (Lump sum turnkey) type of projects.
Supervised, Managed achieved results for the detailed Project Cost Estimates with required accuracy for all engg. Deptts. (Civil, Structural, Mechanical, Rotating, Piping, Electrical, Instrumentation & others) . for various PMC (Project Management Consultancy) jobs quoted by the company
Supervised,managed, achieved the desired results for the detailed Magnitude of Order/EMD /Bid Comparison cost Estimates for Process, Civil,Structural, Electrical, Mechanical,Rotating, Piping, Instrumentation/Other engg deptts MRs, Tenders, MTOs for various jobs / projects
Supervised, Managed, achieved the desired results for the Order of Magnitude /EMD / Bid Comparison Estimates with 10% accuracy for ordering purposes for all Electrical Items (from 220V to 400 KV estimation 11kv to 400 kv Transmission Lines. 33kv-400kv Switchyards, HV/MV Packages, HV/MV Transformers, HV/MV Switchboards, HT/LT Bus-Ducts, HT/LT Cables of all types, Generators, Reactors, DG Sets, AMF Panels, NGRs, Power Factor Correctors / Capacitors, VFD Panels, UPS Package, DC Battery system, Lead Acid, Ni-Cd Batteries, Fire Alarm system, Public address system, Telephone system, F.A. /Communication system/Telephone system cables, Dry type transformers, all types & ratings of Flameproof/Type-N electrical eqpts. FLP control Stations FLP/Type-N Lighting Fixtures, FLP Lighting/Power Panels, Nav-Aid Lanterns, Fog Horn, including costing electrical items in Electrical installation tender in such as Refineries/Petrochemicals/Pipelines/ Onshore/Offshore/LPG/LNG/CNG Plants) Including Tenders, MRs, Detailed Electrical MTOs, electrical items for all of Projects in Company. I was solely responsible for each & every Electrical Engg. Item cost estimation, as I was only Electrical Engineer Incharge for 17 years in my Cost engg deptt. More than 95% of the times my Electrical cost estimates have fallen within the 10% variation allowed in the company for equipment ordering criteria
Electrical cost estimation for Heat Tracing system for process area for all types Safe Area/Classified area
Electrical Cost estimation for Temporary & Permanent Cathodic Protection system
Carried out the Financial Analysis for calculation of IRR for checking the viability, feasibility of the project from profitability point of view for desired term /age of Plant
Carrying out Cost variance analysis for all change orders on day to day basis
Carrying out the cost monitoring activities & preparation of regular cost monitoring / status reports for various jobs on day today basis
Cost variance analysis/review for ordering of various Change Orders, Single Vendor, New Items Claims, Change of scope items/ new packages for various projects
Carrying out the negotiations for various items/ projects on day today basis with cost analysis reports with the vendors /Contractors
Corodination with all other engineering deptts / discussing with them for calculation of most optimum cost for various items/packages
Above activities were performed for various Refinery, Petrochemicals, Gas Plants, Pipelines metallurgy & other projects in India/abroad as mentioned below
Skills attained for Cost engg activities: MS EXCEL WORD POWER POINT OFFICE
Following are the detailed work History for various jobs executed while working in the company (Starting from the latest )
Project Name :
Captive Power Plant -Skikda Refinery (ALGERIA ), Cairns Energy-India ( Gas plant, KPC (Kuwait)- Refinery Renovation job & GAIL (India) – LPG Plant & Various other jobs of various clients in India
Client Name :
M/S SONATRACH (Algeria)-CPP, M/s CAIRNS Energy (India), M/S KPC (Kuwait), GAIL (Gas Authority of India Limited India ) & various other clients in India
country :
Algeria, Kuwait, India
Job Title :
Senior Manager (Costing)
Period :
August -2013 onwards
Project Phase :
EPCM (Cairns Energy), PMC (Captive Power Plant -Skikda) jobs Cost Estimates
Responsibility :
Supervised, Managed & prepared the detailed Cost Estimates for all Process unit equipments / Items for all the above jobs for different phases. depending upon the phase/type of the job
Project Name :
Rehabilitation /Adoption Project of Skikda Refinery at Skikda –ALGERIA
Client Name :
M/S SONATRACH Refinery located at Skikda
Country :
ALGERIA
Job Title :
Senior Manager (Costing ) ALGERIA
Period :
September -2011 to August-2013 (working in ALGERIA)
Project Phase :
PMC scope for 10% Refinery expansion (Rehabilitation/Adoption ) for M/S SONATRACH Refinery Skikda ( Algeria )
))Responsibility :
The job constituted 10% capacity expansion of existing skikda refinery & addition of various new downstream units including the Modernization of existing Instrumentation & Fire protection network in the existing refinery . I was entirely responsible for review / management/recommendation of detailed cost estimates for process items for all engineering disciplines/ departments at site including cost estimates for new items other than those specified various in tenders, packages. Also did the cost estimation for various new site works, new labour jobs, manpower supply & review/ recommendation of CBAs for Process equipments/ items. I was required to facilitate the detailed cost calculations for recommending the most justifiable cost of the Change orders/ new process items / new site job/additional jobs, for carrying the negotiations by Client with the vendors/Contractors. The project was executed in Project Management Consultancy scope by the company.
Project Name :
South Jetty Pipeline Project for IOCL India
Client Name :
Indian Oil Corporation Limited India
Country :
India
Job Title :
Manager (Costing)
Period :
October 2010 to September 2011
Project Phase :
Cost Estimation during DFR & during execution of the job
Responsibility :
South Jetty Pipeline Project for M/S IOCL Supervised/managed the detailed cost estimation for various process equipments, Bulk Materials & tenders involved on OBE Basis, Also responsible of cost monitoring of the project The job included incineator, Fire protection system, laying tenders etc.
Project Name :
Compressor station at Chailsa & Kailaras for Gas Authority of India Limited India
Client Name :
Gas Authority of India Limited India
Country :
India
Job Title :
Manager (Costing)
Period :
March 2008 to October 2010
Project Phase :
Costing during Detailed Estimate (DFR stage ) & during execution stage
Responsibility :
b) Compressor Station at Chailsa & Kailras Supervised, managed the detailed cost estimation of various process equipments & Bulk Materials & tenders involved on Conventional /LSTK . Also responsible for cost Monitoring of the project . The project was executed at Grass root level Estimates for settlements of Extra Claims for various items/jobs. Conducted successful negotiations for minimising the cost of various items
Project Name :
Cost Engg Activities for various jobs of various Clients (India)
Client Name :
Indian Oil Corporation Limited (India), Bharat Petroleum Corporation Limited (India), Indian Petrochemicals Corporation Limited (India) Oil & Natural Gas Commission (India), Gas Authority of India limited (India)
Country :
India
Job Title :
Deputy Manager (Costing )
Period :
March 2005 to March 2007
Project Phase :
Estimation of for all types of job Estimates
Responsibility :
Managed/Supervised /achieved with desired results for the estimates for EPCC (LSTK) Bid Comparison Estimates (for ordering purposes) for Additional Processing Facilities Project for ONGC Uran Hazira- India
Managed/Supervised/achieved the desired results for the estimates for EPCC (LSTK) Bid Comparison Estimates (for ordering purposes) for Butanization Project for ONGC Hazira -India
Managed/Supervised /achieved the desired results for EPCC (LSTK) Bid Comparison Estimates for Fire Network Project for Client ONGC Hazira- India
Managed/ Supervised/achieved the desired results for the cost estimates for all the electrical items for all the jobs in the department as I was the only Electrical engineer in the deptt.
Project Name :
Bina Refinery Marketing Terminal BPCL located at Madhya Pradesh India
Client Name :
BHARAT PETROLEUM CORPORATION LIMITED (Madhya Pradesh) india
Country :
India
Job Title :
Deputy Manager (Costing)
Period :
2007 to Sept 2009
Project Phase :
Estimation at feasibility (DFR) as well as during execution stage
Responsibility :
Bina Refinery Marketing Terminal The job included the detailed cost estimation of various process equipments, Bulk Materials Also the of the jib cost Monitoring in Conventional/LSTK execution of project was executed at grass root Marketing Terminal. Conducted successful negotiations for minimising the cost for various items of the project
Project Name :
Cost Engineering activities for various jobs in the dept.
Client Name :
Different Clients IOCL BPCL ONGC CPCL GAIL India
Country :
India
Job Title :
Deputy Manager (Costing)
Period :
April 2001 to March 2005
Project Phase :
Execution Stage
Responsibility :
Supervised/ managed/achieved the desired results for the cost estimates for DFRs Tenders, Material requisitions, MTOs The types of Estimates included EMD / Bid Comparison, Single Vendor Estimates, EPCC Electrical estimates. All Cost related Activities as described have been performed for the following Jobs. in refinery, Petrochemicals Metallurgy & other process related units Conducted successful negotiations for minimising the cost for various items
AS ELECTRICAL SITE ENGINEER –in the field of construction (Dec1999- May2000)
Project Name :
VDU Phase addition III of Furnace of Mathura Refinery Mathura (India) (Expansion of the VDU Unit / & its stack at Mathura Refinery site
Client Name :
Indian Oil Corporation India Ltd. (IOCL Mathura)
Country :
India
Job Title :
Deputy Manager (Electrical site execution )
Period :
1999 to 2000
Project Phase :
Electrical Site Supervision for the subject job in (EPCM) Conventional Mode
Responsibility :
Posted as Electrical Site Engineer at Mathura refinery & was entirely responsible for all day-to-day site supervision of electrical contractor’s activities for VDU Phase-III project of Mathura Refinery .The job constituted an Addition of third Furnace with stack structure Site activities included the daily supervision of Electrical Installation works, testing of all Electrical equipments (Plant Lighting Power. Lightening Protection, Earthing works) / Pre-commissioning checks/ commissioning of HT/LT sw.gr, HT/LT motors / HT/LT Cables/ Variable speed drives / Control schemes checks/ Tender works execution including lighting fixtures/cabling/Fire Alarm/ Plant Communication Telephone system) Preparation of check lists for all the electrical equipment packages/ installations Check list for all electrical equipments such as HT/LT switchgear VFDs cable trays/trenches Flameproof eqpts installed at site & supervision for installation for electrical engineering (lighting/power/earthing eqpts as per the as per engg. Layout drawings, also preparation of as Built drawings
AS ELECTRICAL DESIGN ENGINEER -
Project Name :
Air Vacuum Unit of Indian Oil Corporation Ltd India-Mathura (India) AVU Unit)
Client Name :
Indian Oil Corporation Limited India (IOCL Mathura)
Country :
India
Job Title :
Deputy Manager (Electrical) Design Engineer
Period :
1998 to 1999
Project Phase :
Implementation of Elect engg design for the job From Concept To Commissioning for AVU Project at Mathura (India)
Responsibility :
Supervised//Managed /achieved 100% desired results as an Electrical engineer for the job executed . I was entirely responsible for accomplishment of all basic & detailed electrical design engineering for the Project. Prepared the Design Basis document for designing electrical system for the project. Conducted the Load analysis, Load Flow studies, Fault level analysis, voltage profile during normal & transient conditions, motor starting studies Calculations for sizing of HT/LT switchgear, HT/LT Cables . Calculations for Sizing of HT generators, HT/LT transformers, DG sets, NGR,UPS, VFD, Battery system, power factor correction. Preparation of Single line diagrams indicating ratings & protection for feeders. Prepared Area Classification Drawings & selection of electrical equipments as per Classification requirements. Engineering for procurement include preparing the MRs, TQ s, TBAs, PRs Electrical Data sheets for electrical Equipments it included vendor discussions, vendor visits vendor drawings approval Also designed the Fire Alarm system, Paging/Intercom system Telephone system, Normal & emergency lighting system, Lightening protection system, Plant Earthing system with Lighting, Cabling & Earthing layouts. Sub Station s design Heat tracing system Cathodic Protection system .Designed the entire cable trays /trench system & their layouts for all HT/LT/Other Cables of plant . Calculations of detailed MTOs of lighting cabling & earthing & F,A,/P.A./ telephone FLP/safe eqpts cable trays/ trenches & connected accessories for preparing the Electrical erection Tender. Preparation of all Control schematics, Vendor Drawings approval. Preparation of Protection Coordination for all conventional/numerical relay settings. Conducted site coordination, site visits, vendor shop visits, vendor discussions for the overall satisfactory completion & commissioning of the project.
Project Name :
High Density Polyethelene Project of Gas Authority India Ltd. at PATA (Uttar Pradeh India )
Client Name :
Gas Authority of India Limited (GAIL) India
Country :
India
Job Title :
Dy Manger (Electrical) Design Engineer from concept to commissioning
Period :
1994 to 1998
Project Phase :
Implementation of Electrical system design for the project From Concept to Commissioning of the HDPE Project
Responsibility :
Supervised//Managed /achieved 100% desired results as an Electrical engineer for the job executed . I was entirely responsible for accomplishment of all basic & detailed electrical design engineering for the Project. Prepared the Design Basis document for designing electrical system for the project . Conducted the Load Analysis, Load Flow studies, Fault level analysis, voltage profile during normal & transient conditions, motor starting studies, Calculations for Sizing of HT/LT switchgear, HT/LT Cables . Calculations for sizing of HT generators, HT/LT transformers, DG sets, NGR,UPS, VFD, Battery system, power factor correction . Preparation of Single line diagrams indicating ratings & protection. Prepared area Classification drawings & selection of electrical equipments as per Classification requirements. Sub Stations design Engineering for procurement include preparing the MRs, TQ s, TBAs, PRs for electrical Equipments it included vendor discussions, vendor visits vendor drawings approval Also designed Heat Tracing system Cathodic Protection system, Fire Alarm system, Paging/Intercom system Telephone system, Normal & emergency lighting system, Lightening protection system, Plant Earthing system with their respective layouts. Designed theentire cable tray /trench system & their layouts for all HT/LT/Other Cables of plant . Calculations of detailed MTOs of lighting cabling & earthing & F,A,/P.A./ telephone FLP/safe eqpts cable trays & connected accessories for preparing the Electrical preparation of Electrical Erection Tender. Preparation of all Control schemaitcs, Vendor Drawings approval. Preparation of Protection Coordination for all conventional/numerical relay settings. Conducted site coordination, site visits, vendor shop visits, vendor discussions for the overall satisfactory completion & commissioning of the project.
Project Name :
Modification jobs Fifth Furnace addition Propane unloading Addition og Reactor in power plant of MGCC Project of IPCL at Nagothane (Maharashtra) India
Client Name :
Indian Petrochemicals Corporation Limited Nagothane India
Country :
India
Job Title :
Sr Engineer (Electrical) Design Engineer from concept to commissioning
Period :
1991 to 1994
Project Phase :
Implementation of Electrical engineering design for the project From Concept to commissioning of various modification jobs n
Responsibility :
Supervised//Managed /achieved 100% desired results as an Electrical engineer for the job executed . I was entirely responsible for accomplishment of all basic & detailed electrical design engineering for the Project. Prepared the Design Basis document for designing electrical system for the project. Conducted calculaitons for Load Analysis, Load Flow studies, Fault level analysis, voltage profile during normal & transient conditions, motor starting studies, Calculations for Sizing of HT/LT switchgear, HT/LT Cables . Calculations for sizing of HT generators, HT/LT transformers, DG sets,NGR, UPS, VFD, Battery system, power factor correction. Preparation of Single line diagrams indicating ratings & protection. Prepared Area Classification Drawings & selection of electrical equipments as per Classification requirements. Sub Station design Engineering for procurement include preparing the MRs, TQ s, TBAs, PRs for electrical Equipments it included vendor discussions, vendor visits vendor drawings approval Also designed the Heat Tracing system Cathodic Protetion system Fire Alarm system, Paging/Intercom system Telephone system, Normal & emergency lighting system, Lightening protection system, Plant Earthing system with their respective layouts. Designed the entire cable tray /trench system & their layouts for all HT/LT/Other Cables of plant . Calculations of detailed MTOs of lighting cabling & earthing & F,A,/P.A./ telephone, FLP/safe eqpts cable trays & connected accessories for preparing the Electrical preparation of Electrical Erection Tender. Preparation of all Control schemaitcs, Vendor Drawings approval. Preparation of Protection Coordination for all conventionalrelay settings. Conducted site coordination, site visits, vendor shop visits, vendor discussions for the overall satisfactory completion & commissioning of the project.
Project Name :
Gas Cracker Plant situated at Nagothane Maharashtra India
Client Name :
Indian Petrochemicals Corporation Ltd. Nagothane India
Country :
India
Job Title :
Sr Engineer (Electrical) Design Engineer
Period :
1987 to 1991
Project Phase :
Implementation of Electrical power distribution system, From concept to commissioning of Gas Cracker Project
Responsibility :
Supervised//Managed /achieved 100% desired results as an Electrical engineer for the job executed . I was entirely responsible for accomplishment of all basic & detailed electrical design engineering for the Project. Prepared the Design Basis document for designing electrical system for the project . Conducted the Load Analysis, Load Flow studies, Fault level analysis, voltage profile during normal & transient conditions, Sizing of HT/LT switchgear, HT/LT Cables . Sizing of HT generators, HT/LT transformers, DG sets, UPS, VFD, Battery system,, Preparation of Single line diagrams indicating ratings & protection. Prepared Area Classification Drawings & selection of electrical equipments as per Classification requirements. Engineering for procurement include preparing the MRs, TQ s, TBAs, PRs for electrical Equipments it included vendor discussions, vendor visits vendor drawings approval Also designed the Fire Alarm system, Paging/Intercom system Telephone system, Normal & emergency lighting system, Lightening protection system, Plant Earthing system with their respective layouts. Designed the entire cable tray /trench system & their layouts for all HT/LT/Other Cables of plant . Calculations of detailed MTOs of lighting cabling & earthing & F,A,/P.A./ telephone FLP/safe eqpts cable trays & connected accessories for preparing the Electrical preparation of Electrical Erection Tender. Preparation of all Control schemaitcs, Vendor Drawings approval. Preparation of Protection Coordination for all conventional relay settings. Conducted site coordination, site visits, vendor shop visits,vendor discussions for the overall satisfactory completion & commissioning of the project.
Project Name :
Polyester Staple Fibre Project of Bongaigaon Refinery Project Assam India
Client Name :
Bongaigaon Refinery & Petrochemicals Ltd. Bongaigaon Assam India
Country :
India
Job Title :
Electrical Engg. Design & Implementation
Period :
1984 to 1987
Project Phase :
Implementation of Electrical power distribution system,from concept to commissioning for the Project
Responsibility :
Supervised//Managed /achieved 100% desired