Plant Manager Manufacturing Manager

Location:
Covina, CA
Posted:
October 07, 2022

Contact this candidate

Resume:

***** *. ***** *** **** A, Covina, California ****4

Home 626-***-****

E – Mail: **********@***.***

OPERATIONS MANAGERIMANUFACTURING and PROCESS ENGINEER

An Experienced Manager and Engineer with an extensive background in all aspects of manufacturing and process engineering. A creative problem solver who is able to effectively manage to the bottom line while ensuring the production of quality products, the design and implementation of innovative systems and processes and the commitment to cost management controls including efficient inventory management systems. Experience includes:

Plastic Injection Molding

Material and Equipment Sourcing

Lean Manufacturing

Problem Solving Process

Quality Assurance

Six Sigma Methodology

Capital Planning & Improvement

JIT & Cell Manufacturing

Bilingual: Spanish/English

Continuous Improvement Process

Performance Metrics

ISO 9001 and Clean Room

6“S” Process and Safety

Total Productive Maintenance

OSHA, EPA & FDA

PROFESSIONAL EXPERIENCE

BRASSTECH, INC., Santa Ana, CA

Leading manufacturer and maker of luxury kitchen fixtures and bathroom accessories.

Senior Manager of Continuous Improvement & Training 03/2022 to Present

Promoted to Senior Manager of Continuous Improvements and Training. Report to Vice President of Operations, responsible for focusing on improving new and existing methodologies to improve Brasstech Team Members knowledge of the best and safest way to produce products. Interface with Department and Plant Managers to support with departmental training and development needs. Lead and manage the lean manufacturing initiatives and direct supervision of Engineering Internship, Production Engineering Manager and Manufacturing Engineer team at 2 locations.

Manager of Manufacturing Engineering and CI 10/2014 to 01/202

Promoted to Manager of Manufacturing Engineering and Continuous Improvements. Report to Vice President of Operations, responsible for leading waste reduction in the form of operating cost and working capital while improving safety, quality, and customer service level, lead and manage the lean manufacturing organization, systems, and processes including direct supervision of company Manufacturing Engineering. Support new product launches via design for manufacturability reviews, process development, and validation exercises such as prototyping and pilot production builds.

`

Completed 3 kaizen events per month to improve product flow, standard work and reduce scrap cost, resulted in savings of $1300K in 2016, $1200K in 2017, $1180K in 2018, $1640K in 2019, $840K in 2020 and $900K in 2021.

Identified the CI Initiatives, schedule and facilitated 36 per year Kaizen Events for the last 7 years, resulting in reduction of cost scrap rate from 6.1% in 2014 to 1.5% Y-T-D.

Developed a roadmap of lean events and projects to improve quality, efficiency and safety every year.

Coordinate with a sister company to develop 21 kaizen facilitators, 12 in Problem Solving Process and delivered training in PSP to 13 Production Supervisors virtually in 2020, and 6 QC Leads in 2021.

Sr. Manufacturing Engineer 7/2011 to 9/2014

Responsible for planning, coordinating and implementing improvements in the machining, finishing, assembly, and test of luxury kitchen fixtures and bathroom accessories. Create, review, approve and implement processes, fixtures and part drawings for existing and new products.

Developed, validated and implemented manufacturing processes and tooling for brazing, punching and bending components for new products.

Introduced 30 new products from R&D to Manufacturing within scheduled time every year, resulting in increased sales for new products and meeting company goals.

Participated in 26 Kaizen Events as a team member and 12 as team leader with excellent results in improving product assembly one-piece flow, training assembly operators in lean and 5 “S”.

Designed and fabricated workstations for 9 Assembly Work Centers to reduce no-value added activities, resulting in 20% productivity.

Designed assembly fixtures by using PRO-E Software to improve quality and efficiency for manufacturing new products in 2011, 2012 and 2013.

ARLON, INC., Rancho Cucamonga, CA

A major manufacturer of specialty high performance laminates and prepreg materials for use in a wide variety of PCB (printed circuit board) applications, ISO 9001 Certified Company.

Sr. Process/Facilities Engineer 2007 to 2011

Managed direct report team of four maintenance technicians to ensure that all equipment operates at their highest capability to meet required production schedules, quality and schedule priorities. Developed and implemented manufacturing process by using appropriate six-sigma and lean manufacturing techniques, statistical design and process methodology. Supported manufacturing initiatives focus toward continuous improvements in product cost, cycle time and product quality by completing initiatives found during kaizen events in a timely matter.

Improved 5 “S” score from 1 in 2008 to 7 in 2010 through implementation of lean principles.

Justified and managed annual plant repair budget of $500,000 and capital budget of $400,000 to improve employee safety, product quality by 4.5% and overall equipment effectiveness by 10%.

Participated in 12 Kaizen Events as team member and 4 as team leader with excellent results.

Implemented and monitored TPM (total productive maintenance) program on 6 factory equipment by using lean manufacturing TPM methodology, resulting in 10% increase of OEE.

Organized existing inventory and improved inventory control with visual system to see label; tagged all machine spare parts and all consumables.

BERRY COVALENCE PLASTICS, City of Industry, CA

Leading manufacturer and maker of products used in packaging, including polyethylene films. The City of Industry Facility closed on October1, 2007.

Production Manager 2005 to 2007

Manage the daily activities required for the efficient manufacture of plastic sheeting and bags. Implement and monitor policies and procedures to comply with all applicable state and federal safety/environment regulations and managed labor and variable manufacturing overhead costs.

Reduced direct labor cost from 11 to 9 Cents per pound by improving order and set-up changes.

Reduced customer returns from 1.65% to 0.42% by implementing and monitoring process parameters and operator training in product specifications, machines capability studies.

Implemented Quality improvement program including spot audits, root-cause analysis, and implementation of work instructions.

Handled customer complaints, included physically visiting customer plants and collaborating with product engineers to identify and solve the issues.

Increased efficiency and operator ownership by re-designing bag work area and training bag machine operators to allow them more fully manage their area.

DECORE-ATIVE SPECIALTIES, Irwindale, CA

National manufacturer of custom made Fine Crafted Cabinet Doors.

Production Manager 2003 to 2005

Manage activities of workers engaged in manufacturing to ensure that product was shipped on time, while maintaining and reducing costs through continuous improvement efforts; led 8 production supervisors and 450 personnel in the production floor. Supervised and directed all employee disciplinary and training programs, safety programs, and plant improvement projects.

Ensured cabinet doors were provided to customers on time of 96.1% in 2003 and 99.5 % in 2004

Ensured product quality specifications were followed in each assigned work station; developed SOP’s and visual aids to train manufacturing personnel, resulting in 5% scrap reduction.

TOPPAN ELECTRONICS, San Diego, CA

World leader in the manufacture of multi-layer printed circuit boards, ISO 9002 Certified Company. The San Diego Facility closed on March 31, 2003.

Manufacturing Manager 2000 to 2003

Manage the resources and activities of four departments, including personnel training, quality, productivity, cost, delivery, and safety; lead Section Management Team to establish corrective action improvement activities, and coordinating the implementation of new processes, equipment and programs by using six-sigma and lean manufacturing methodologies.

Prepared and trained 50 production operators in specific jobs duties to meet ISO 9002 Certification.

Reduced PCB inner layer defects from 4% to 1.5% by using continuous improvement process, implemented solutions found using six-sigma methodology.

U.S. WATER PRODUCTS/ U.S. Filter, San Diego, CA

A $4M Plastic Injection Molding Facility owned by U.S. Filter Company. The San Diego Facility closed and moved on July 25, 2000 to Sheboygan WI.

Plant Manager 1998 to 2000

Led team of 5 direct-report supervisors and up to 80 indirect reports and managed P&L; oversaw all operations, accounting, quality, materials, maintenance, budgeting and pricing. Developed and managed company annual expense budget, safety programs, capital equipment, and implemented systems to improve customer satisfaction.

Redesigned existing molds and molded components to meet specifications within CPK of 2, resulted in 10% cost reduction and 15% decreases in manufacturing cycle time.

Improved customer service satisfaction level from 92% in 1998 to 98% in 1999 by re-designing delivery procedures and implementing effective total productive maintenance program.

Transferred 10 products from San Diego to Malaysia, included the design of molds, fabrication and validation of molds, and the training local process engineer and operators of molded components.

RAIN BIRD SPRINKLER MFG. /HYSON AGRI-PRODUCTS DIVISION in Tijuana, Mexico 1987 to 1997

World leader in State-Of-The-Art irrigation products and controllers.

Senior Manufacturing Engineer 1995 to 1997

Improved machines capability and reliability through implementation of proper tooling design, statistical process control, total productive maintenance and project management; resulted in 4% COPQ reduction.

Production Manager 1990 to 1995

Achievements included managing 5 direct reports and up to 250 production associates, and $1 Million operating budget to improve 40% output of metal sprinklers in one year, without degradation of quality or morale and while simultaneously trimming 12% of labor cost. Implemented advanced manufacturing systems that increased quality by 8%, and boosted efficiency levels by 15%.

Manufacturing Engineer 1987 to 1990

Played instrumental roles in successfully started up of 2 plant operations in Mexico.

EDUCATION / CERTIFICATIONS

San Jose State University, San Jose, California, 1985

Bachelor of Science in Industrial and Systems Engineering

Certification: Engineering in Training Certificate # XE064604

TRAINING COURSES AND SEMINARS

Health, Safety, and Environmental Compliance

Tooling and Fixture Design

Fundamental of Plastic Injection Molding

Design for Manufacturability

Diverse Team Building

Lean Manufacturing

Planning Manufacturing Cells

Six-Sigma Green Belt Training

Measuring System Analysis

New Product Introduction Process

Prevention of Sexual Harassment

Problem Solving Process

Machining Process- Mazaks & Haas

Just In Time Implementation Strategies

PC SOFTWARE

MS Word, Excel, Power Point and Internet

Time Studies

Project Management

Auto CAD R 2011.

Pro-E, CREO 2

Baan and Syteline Computer System

JD Edwards and Kronos