• Sumantrai J. Mistry
**** ******* ****, **********, *******, L7L 3E4
905-***-**** *********@*****.***
JOB OBJECTIVE To pursue a rewarding position that is in line with my experience Background and career objective for mutual benefits, Designer [EXTERNAL AIRCRAFT ENGINE DESIGN]
PRATT & WHITNEY Ontario (Canada)
January, 2011 — Present (4 years 11 months)
• Using V5 Catia V19 - Contract Using CATIA v5 Release 4.19 Using DMU, ENOVIA System Design.(PLM) Define installations and produce engineering documentation
• Take the engineering definition from design review, drawing approval processes through formal release
• In cooperation with system engineering ensure that engineering definition is compliant
• Ensure static and dynamic antically data meet the safety margin. Ensure best practices are in compliances with company standards. Thrust reverser and associated components Cowl door
• Nacell attachments
• Writing reports. Composite module. Resolving design issue with Arielle manufacturing Of thrust reverser. Design of fire wire system Zone 1 and Zone 2 ECN module design
• Writing Design summery memo. Organize start up to final design review using power point
• Prepare specifications and Engineering Coordination Memos (ECM) to address customer requests for changes.
• Reviews, recommends, coordinates design, drawing changes activity with customer, other Company disciplines and coordinates activities between production, manufacturing and engineering
• Ensure timely and satisfactory resolution of problems Designer
SJM DESIGN LTD Burlington, Ontario, (Canada)
January, 2010 — December, 2010 (12 months)
• Solid models} Using V5 Catia V19, Solid and surface module
• Composite and Sheet Metal Module
• Design gas turbine (Vane rings, bearing housing, Large fixture design gas turbine assembly, Tool Design
• Test rig design gas .Turbine .Blade design steam turbine
• Lifting fixtures gas turbine assembly.
Designer [EXTERNAL AIRCRAFT
PRATT & WHITTNEY Ontario (Canada)
March, 2003 — December, 2009 (6 years 10 months)
• ENGINE DESIGN] - {Solid models} Using V5 Catia V19 15000 HOURS Solid and surface module
• Composite module. Using DMU, ENOVIA Smart Team Design dynamic and static pressure instrumentation Bypass nacelle inlets PW 610,615. Model engine electrical harness connecting ECU, Ignition Exciter, Dcu, PW307, PW615 Schematic AC Generator control unit PW 308 Design inlet duct with pressure and temp rakes for inlet distortion Test Using DMU, ENOVIA Smart Team Tool and Fixture design for assembly of aircraft engines. Using DMU, ENOVIA Smart Team Assisting junior designer with concepts.
Designer [EXTERNAL AIRCRAFT
PRATT & WHITTNEY Ontario (Canada)
February, 2001 — November, 2001 (9 months)
• ENGINE DESIGN] - Contract Using CATIA Release 4.19 System Design, {Solid models} Fuel oil heat exchanger, Wiring harnesses. Cowl door
• Nacell attachments
• Writing reports.
Designer - Contract
PRATT & WHITTNEY Ontario (Canada)
January, 1996 — March, 1999 (3 years 2 months)
• Using CATIA Release 4.19 System Design and Details,
• {Solid models} Test Rig for Fuel Pump Nozzle and Turbine
• Blades, Engine Telemetry Instrumentation design detail.
• Mounts, PW 150, PW 308
Designer-Contract
PRATT & WHITTNEY Ontario (Canada)
June, 1989 — June, 1990 (1 year)
• Using CATIA RELEASE 4.16 System Design and Details, Test and Rig Fuel Pump Nozzle and Turbine Blades.
• PW 150, PW 308
Senior Designer/Supervisor
BF GOODRICH AEROSPACE Ontario (Canada)
March, 2003 — March, 2003 (1 month)
• Using Catia, 4 2.0 AND V5, Produce solid models. Model landing gear electrical harness for assembly. Assembly Fixtures, Holding Fixtures, Lifting equipment
• Static and fatigue test design for major component tests
• Stress analysis to verify fixture designs
• Using DMU, ENOVIA Smart Team
• Test fixture
• Models landing gear components. Fatigue rig design landing gear.(Nose/Main)
• Produce solid models. Test fixture
• Tool Design
• Models landing gear components. Using catia version 4.19. Senior Designer- Contract
MENESCO AEROSPACE LTD Ontario (Canada)
June, 1990 — December, 1995 (5 years 7 months)
• 10000 Hours on CADAM 6000 Hours on CATIA Release 4.17 Responsible for all Tool Designs, Details and Estimates - For manufacturing Aircraft Landing Gears and Flight Controls Assemblies Currently using CADAM Release 14 and IBM: CATIA System
• Release 4.17 also liaison with outside Vendors and Trouble Shooting
• Cost Reduction Methods on Manufacturing
• Responding Shop Requests for Problem Solving Assistance
• Gear integration Assembly Tooling. PROJECTS IN HAND: Boeing: B777, B767, B737, V22, Fokker: F1000, Douglas: C17. Worked on Fatigue Test and Endurance Test Rig for Main and Nose Landing gears for the Aircraft's.
Designer-Contract
MENESCO AEROSPACE LTD Ontario (Canada)
February, 1988 — June, 1989 (1 year 4 months)
• Produced Design Layouts and Details for Douglas C-17 Flap Control System + Design and Details for Flashes aluminum Alloy forging, Tool Design for the Aircraft Landing Gears. Designer- Contract
Aisco ltd BURLINGTONN, ONT
November, 1987 — February, 1988 (3 months)
• Product Design Layouts from concept of Special purpose Machines for HEAVY INDUSTRIES e.g
• FOUNDRY and CAR PLANTS.
Designer -, Contract
PRATT & WHITNEY LTD Ontario (Canada)
November, 1986 — November, 1987 (1 year)
• Produce Tool Designs for Assembly and Disassembly of Aircraft Gearbox and Engines: PW 205, PW 209
& PW 300
• Design and Detail Cold Flow Turbines Rig, Engines PW 205, PW 209
• Design and Detail Instrumentation for Engine PW 300
• Static and Strain Gauges for Measuring Engines performance and produced Engineering Drawings on CADAM system.
Designer
ULTRA HIGH VACUUM INSTRUMENTS Ontario (Canada)
September, 1986 — November, 1986 (2 months) (Contract Position)
• Produce System Layouts, Design Layouts, and Detail Design from concept to Manufacturing Stage of Precision vacuum Equipment's for vacuum and surface science application including sample introduction and processing systems.
Designer
G.S.W. BURLINGTON PRODUCTS Ontario (Canada)
(Contract Position)
July, 1986 — September, 1986 (2 months)
• Produce Design Layouts and Details for Rolling Machines for
• Producing Pipes for burning wood stoves.
Senior Designer
PROCTOR & GAMBLE Ontario (Canada)
January, 1985 — July, 1986 (1 year 6 months)
• Worked on Special Project I.C.F Packaging Machine Produce Design and Layout on Filling Station Volumetric Head, Capping Station, Bottle Cleaning Station, Cap Chutes, Conveyors, Checking Design and Detail Drawings
• Supervising Draftsmen, Trouble shooting of Machines etc. FIRESTONE CANADA LTD
• HAMILTON, ONT. Design and Detail for Splice and Wind up Machines (Bi Ply Tires) and Plant Layouts etc. DIXON CANADA LTD
• STONY CREEK, ONT. Design and Detail for Special Tooling for feed System Designer
KINGSBURY MACHINE TOOL (CANADA) LTD
February, 1984 — January, 1985 (11 months) (Contract Position)
• Produce Design and Details of Special purpose Machines, including Online Transfer Machines, Dial Machine, S.L
• Machines & selection, Selection of drives, Tool Design and Fixtures, Design & Details. Senior Designer
EDSON PACKAGING MACHINES LTD Ontario (Canada)
April, 1982 — February, 1984 (1 year 10 months)
• Produce Design, Concept, Layout and working Drawings Packaging Machines, Component Design and Selection:
• Selection of drives, Bearing, Pneumatic Equipment's,
• Conveyor Designs etc.
Designer
STATION PIPE LTD Ontario (Canada)
November, 1981 — April, 1982 (5 months) (Contract Position)
• Produce Design, Concept, Layout and working Drawings on Centrifugal Casting Machine for producing ductile Iron Pipes
• Duties includes Component Design and selection, Plant selection of Drives, Bearings, Pneumatic Equipment's, Plant Layout, Piping Layout, Checking of Drawings and Supervising Draftsmen. Design Draftsman - Plant Engineering
WELMET INDUSTRIES LTD Ontario (Canada)
May, 1981 — November, 1981 (6 months) (Contract Position)
• To carry out Projects from concept to Design and Details and to Manufacture Stage
• Area covered was: Dust Collector Pollution control, Plan and Equipment Layout, Selection of Drives, Components, Selection the biddings Etc.
Tool Designer
SEATTLE, U.S.A
May, 1980 — November, 1981 (1 year 6 months) (Contract Position)
• Worked on sight on the Aircraft: BOEING 757.
• Responsibility: For the concept of Tooling Masters and Transportation Equipment. Tool Designer
BRITISH AEROSPACE (UK)
May, 1977 — May, 1980 (3 years)
• Responsible for the Design and Manufacture of large
• Assembly Jigs, Door Masters, Facilities, lifting and
• Transportation Equipment's.
(Designer)
T.I.MATRIX MACHINE TOOLDS LTD (UK)
May, 1977 — May, 1980 (3 years)
• LEICESTER, ENGLAND.
• Matrix Machine Tools
Design Draftsman
February, 1974 — February, 1976 (2 years)
• Tools
• To use component Drawings and produce working Broaches and Tools setting up Drawings and Designing of Of jigs and Fixtures.
Design Checker
February, 1976 — May, 1977 (1 year 3 months)
• Responsibility to check Draftsmen's Drawings and Liaison
• With requirement of customers
(Apprenticeship)
W.E. BOOTON LTD (UK)
September, 1970 — February, 1974 (3 years 5 months)
• LEICESTER, ENGLAND
• (Manufacturer of knitting Machines)
Apprenticeship
September, 1970 — September, 1970 • Responsibility: Basic Engineering skills at Training Center
• At Charles Keen College, England.
Apprenticeship
October, 1971 — February, 1974 (2 years 4 months)
• Responsibility: To work in all Departments on the Shop Floor
• Examples: General Fitting, Turning, Milling, Grinding (Surface and Cylindrical), Tool Room Fitting, Development ship, Machine Testing and Drawing office. EDUCATION
RUSHEY MEAD BOYS SECONDARY SCHOOL (UK)
LEVEL ENGINEERING DRAWINGS
• RUSHEY MEAD BOYS SECONDARY SCHOOL, LEICESTER, ENGLAND. "0" LEVEL ENGINEERING DRAWINGS. C.S.E
• - ECONOMICS, MATHEMATICS, TECHNICAL DRAWINGS.
CHARLES KEEN COLLEGE AND LEICESTER POLYTECHNIQUE (UK) CERTIFICATE, PART II
• CHARLES KEEN COLLEGE AND LEICESTER POLYTECHNIQUE.
• CITY & GUILD - PART II CERTIFICATE - TEXTILE ENGINEERING.
(School name not available)
CERTIFICATE, FULL TECHNICAL
Degree date: 1992
• CITY & GUILD - FULL TECHNICAL CERTIFICATE - PRODUCT DESIGN. H.N.D
• - CERTIFICATE - MECHNICAL ENGINEERING. MENEASCO AERO SPACE LTD
• - ADVANCE QUALITY SYSTEMS. AERODYNE ENGINEERING LTD
• - CADAM COURCES: - 1992 CATIA BASIC OPERATIONS AND WIREFRAME MODELLING. L & H CONSULTANT MARKHAM ONT.
LICENSES / CERTIFICATIONS
• CITY & GUILD - PART II CERTIFICATE - TEXTILE ENGINEERING.
• CITY & GUILD - FULL TECHNICAL CERTIFICATE -
• H.N.D. - CERTIFICATE - MECHNICAL ENGINEERING.(Degree) ASSOCIATIONS
• CITY & GUILD - PART II CERTIFICATE - TEXTILE ENGINEERING
• CITY & GUILD - FULL TECHNICAL CERTIFICATE
SKILLS / QUALIFICATIONS
• Skills: Advanced proficiency in currently utilized CATIA v5 technology for data file
• Management, modeling, assembly, detailing & GD&T, Trained PLM
• File management techniques in currently utilized CATIA technology
• Fundamental knowledge of manufacturing & assembly process
• Ability to apply advanced academic and other design knowledge, including
• Descriptive geometry or equivalent, in the development & modification
• Components/assemblies
• Ability to communicate effectively both verbally and written
• Strong organizational skills & ability to multi task, Team player.
• Proficient Microsoft Word, Excel, Power Point
• Strong work ethic.