Willie A Martin Sr
272-***-**** *******@*****.*** Easton, PA 18042
SUMMARY
Very much outgoing as well as talented in many areas. Always on time and very dependable! Started my own skilled hobby working with Popsicle&Craft sticks building exact replicas of private homes also commercial buildings which landed me in the local newspaper in Shamokin Pennsylvania! No type of criminal records under me which I consider a major blessing SKILLS
QA
QC
Production Equipment Assessment
Visual inspections
Expert assembler
Product assembly
Machinery operations
Technical skills
EXPERIENCE
Widow Assembly, Regency plus, September 2021-Current Mt Carmel, PA
Completed accurate assembly work by positioning and aligning components. Recognized defective material and reported issues to management. Inspected finished parts and components to enforce QA standards and uncover defects prior to packaging.
Assembled component parts of items and completed hand-finishing of final products. Framing Contractor, Nick Tarres, April 2018-July 2019 Palmer, PA
Took accurate measurements to calculate size and amount of materials needed for project completion.
Consistently constructed square and level projects. Worked independently on projects and tasks within carpentry team. Repaired and maintained properties, renovating flooring, walls and ceilings, installing fixtures and remodeling bathrooms and kitchens.
Maintained clean and organized workplace to optimize performance, efficiency and safety. Removed damaged or defective parts or sections of structures and repaired or replaced using hand tools.
Measured and marked cutting lines on materials using rulers, pencils, chalk and marking gauges.
Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
Adhered to project blueprints and requirements to deliver quality work. Measured materials carefully before beginning project tasks to decrease waste by [Number]%. Utilized various tools, equipment, materials and forming systems to complete construction tasks.
Framing Contractor, Sevek Construction, November 1999-November 2007 Bethlehem, PA
Took accurate measurements to calculate size and amount of materials needed for project completion.
Consistently constructed square and level projects. Worked independently on projects and tasks within carpentry team. Repaired and maintained properties, renovating flooring, walls and ceilings, installing fixtures and remodeling bathrooms and kitchens.
Maintained clean and organized workplace to optimize performance, efficiency and safety. Completed [Type] projects by assembling forms and building strong structures. Safely operated power saws, planers, jointers, routers and pneumatic equipment for [Number] days without accident.
Measured and marked cutting lines on materials using rulers, pencils, chalk and marking gauges.
Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
Adhered to project blueprints and requirements to deliver quality work. Utilized various tools, equipment, materials and forming systems to complete construction tasks.
Measured materials carefully before beginning project tasks to decrease waste by [Number]%. Conducted thorough inspections of project locations to identify code issues and initiate needed repairs or maintenance.
Forklift Operator, MCS plastics, November 2000-July 2001 Palmer Industrial Park, PA
Maneuvered forklift over and around loaded pallets, boxes and other materials. Maintained current forklift training and certification as required by company policies. Transported material to correct locations and documented inventory changes. Inspected lifts before use to prevent damage to goods. Reported safety and quality issues to management.
Consistently met deadlines for loading trailers to meet departure deadlines. Picked up warehouse debris and deposited waste into appropriate piles and stacked baled trash.
Documented tally sheets, slot changes, shuttle transfers and other paperwork. Moved pallets of merchandise using electric forklifts and electric pallets. Roofer Laborer, Paul Petty Roofing & Siding, November 1998-August 1999 Easton, PA
Repaired and replaced roof membrane, sub roofing, sheathing and base materials. Maintained and repaired roofing tools and equipment. Cut roofing paper to size and nailed and stapled paper to roof in overlapping strips to form base for roofing materials.
Participated in all phases and types of commercial roofing. Overlapped successive layers of roofing material, determining distance of overlap using chalk line, gauge on shingling hatchet and lines on shingles. Trained and oversaw individuals in roofing system installations. Currently Employed with VM Development as one of four main skilled Carpenters. Punch out potential loft apartments... Drywall, Framing (window &door openings,tub& drywall nailers, installation of door knobs, deadbolts, pantry &coat shelves,etc... EDUCATION AND TRAINING
GED
East Orange NJ Youth Corps, East Orange NJ September 1998 Some College (No Degree)
Carpentry/Cabinetmaking, Career Institute of Technology, Palmer Industrial Park PA